Interactive link mining method
The invention discloses an interactive link mining method. The method relates to the technical field of mining, and comprises the following steps: S1, carrying out secondary delineation on an ore body; s2, dividing the ore body into a middle section, and dividing the middle section into an upper min...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHOU LI OU RENZE WANG XIONGRONG ZOU WEN LIN WEIXING GONG YONGCHAO CHU HONGTAO LIN BINGGUI SUN YUANJIANG LIANG JULI LU JINTAO LIU SHUAIDONG LIU XUN JIANG KE |
description | The invention discloses an interactive link mining method. The method relates to the technical field of mining, and comprises the following steps: S1, carrying out secondary delineation on an ore body; s2, dividing the ore body into a middle section, and dividing the middle section into an upper mining area and a lower mining area; s3, upper and lower mining areas are divided according to stope panels; s4, digging a stope connection roadway in a lower mining area to enter the ore body, and then tunneling along the footwall of the ore body to fill an air return shaft so that the air return shaft is communicated with the upper middle section transverse drift roadway; s5, stope separation, stoping and filling are conducted on the lower mining area ore body till stoping is conducted to the upper mining area ore body height; s6, coping is conducted on the stope connection roadway; s7, the ore body panel of the upper mining area is divided into stopes, stoping is conducted according to the platform and the reserved |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117266853A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117266853A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117266853A3</originalsourceid><addsrcrecordid>eNrjZJDzzCtJLUpMLsksS1XIyczLVsjNzMvMS1fITS3JyE_hYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhuZGZmYWpsaOxsSoAQAEFSSi</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Interactive link mining method</title><source>esp@cenet</source><creator>ZHOU LI ; OU RENZE ; WANG XIONGRONG ; ZOU WEN ; LIN WEIXING ; GONG YONGCHAO ; CHU HONGTAO ; LIN BINGGUI ; SUN YUANJIANG ; LIANG JULI ; LU JINTAO ; LIU SHUAIDONG ; LIU XUN ; JIANG KE</creator><creatorcontrib>ZHOU LI ; OU RENZE ; WANG XIONGRONG ; ZOU WEN ; LIN WEIXING ; GONG YONGCHAO ; CHU HONGTAO ; LIN BINGGUI ; SUN YUANJIANG ; LIANG JULI ; LU JINTAO ; LIU SHUAIDONG ; LIU XUN ; JIANG KE</creatorcontrib><description>The invention discloses an interactive link mining method. The method relates to the technical field of mining, and comprises the following steps: S1, carrying out secondary delineation on an ore body; s2, dividing the ore body into a middle section, and dividing the middle section into an upper mining area and a lower mining area; s3, upper and lower mining areas are divided according to stope panels; s4, digging a stope connection roadway in a lower mining area to enter the ore body, and then tunneling along the footwall of the ore body to fill an air return shaft so that the air return shaft is communicated with the upper middle section transverse drift roadway; s5, stope separation, stoping and filling are conducted on the lower mining area ore body till stoping is conducted to the upper mining area ore body height; s6, coping is conducted on the stope connection roadway; s7, the ore body panel of the upper mining area is divided into stopes, stoping is conducted according to the platform and the reserved</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; MINING ; MINING OR QUARRYING ; SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20231222&DB=EPODOC&CC=CN&NR=117266853A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20231222&DB=EPODOC&CC=CN&NR=117266853A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHOU LI</creatorcontrib><creatorcontrib>OU RENZE</creatorcontrib><creatorcontrib>WANG XIONGRONG</creatorcontrib><creatorcontrib>ZOU WEN</creatorcontrib><creatorcontrib>LIN WEIXING</creatorcontrib><creatorcontrib>GONG YONGCHAO</creatorcontrib><creatorcontrib>CHU HONGTAO</creatorcontrib><creatorcontrib>LIN BINGGUI</creatorcontrib><creatorcontrib>SUN YUANJIANG</creatorcontrib><creatorcontrib>LIANG JULI</creatorcontrib><creatorcontrib>LU JINTAO</creatorcontrib><creatorcontrib>LIU SHUAIDONG</creatorcontrib><creatorcontrib>LIU XUN</creatorcontrib><creatorcontrib>JIANG KE</creatorcontrib><title>Interactive link mining method</title><description>The invention discloses an interactive link mining method. The method relates to the technical field of mining, and comprises the following steps: S1, carrying out secondary delineation on an ore body; s2, dividing the ore body into a middle section, and dividing the middle section into an upper mining area and a lower mining area; s3, upper and lower mining areas are divided according to stope panels; s4, digging a stope connection roadway in a lower mining area to enter the ore body, and then tunneling along the footwall of the ore body to fill an air return shaft so that the air return shaft is communicated with the upper middle section transverse drift roadway; s5, stope separation, stoping and filling are conducted on the lower mining area ore body till stoping is conducted to the upper mining area ore body height; s6, coping is conducted on the stope connection roadway; s7, the ore body panel of the upper mining area is divided into stopes, stoping is conducted according to the platform and the reserved</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>MINING OR QUARRYING</subject><subject>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZJDzzCtJLUpMLsksS1XIyczLVsjNzMvMS1fITS3JyE_hYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhuZGZmYWpsaOxsSoAQAEFSSi</recordid><startdate>20231222</startdate><enddate>20231222</enddate><creator>ZHOU LI</creator><creator>OU RENZE</creator><creator>WANG XIONGRONG</creator><creator>ZOU WEN</creator><creator>LIN WEIXING</creator><creator>GONG YONGCHAO</creator><creator>CHU HONGTAO</creator><creator>LIN BINGGUI</creator><creator>SUN YUANJIANG</creator><creator>LIANG JULI</creator><creator>LU JINTAO</creator><creator>LIU SHUAIDONG</creator><creator>LIU XUN</creator><creator>JIANG KE</creator><scope>EVB</scope></search><sort><creationdate>20231222</creationdate><title>Interactive link mining method</title><author>ZHOU LI ; OU RENZE ; WANG XIONGRONG ; ZOU WEN ; LIN WEIXING ; GONG YONGCHAO ; CHU HONGTAO ; LIN BINGGUI ; SUN YUANJIANG ; LIANG JULI ; LU JINTAO ; LIU SHUAIDONG ; LIU XUN ; JIANG KE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117266853A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>MINING OR QUARRYING</topic><topic>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHOU LI</creatorcontrib><creatorcontrib>OU RENZE</creatorcontrib><creatorcontrib>WANG XIONGRONG</creatorcontrib><creatorcontrib>ZOU WEN</creatorcontrib><creatorcontrib>LIN WEIXING</creatorcontrib><creatorcontrib>GONG YONGCHAO</creatorcontrib><creatorcontrib>CHU HONGTAO</creatorcontrib><creatorcontrib>LIN BINGGUI</creatorcontrib><creatorcontrib>SUN YUANJIANG</creatorcontrib><creatorcontrib>LIANG JULI</creatorcontrib><creatorcontrib>LU JINTAO</creatorcontrib><creatorcontrib>LIU SHUAIDONG</creatorcontrib><creatorcontrib>LIU XUN</creatorcontrib><creatorcontrib>JIANG KE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHOU LI</au><au>OU RENZE</au><au>WANG XIONGRONG</au><au>ZOU WEN</au><au>LIN WEIXING</au><au>GONG YONGCHAO</au><au>CHU HONGTAO</au><au>LIN BINGGUI</au><au>SUN YUANJIANG</au><au>LIANG JULI</au><au>LU JINTAO</au><au>LIU SHUAIDONG</au><au>LIU XUN</au><au>JIANG KE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Interactive link mining method</title><date>2023-12-22</date><risdate>2023</risdate><abstract>The invention discloses an interactive link mining method. The method relates to the technical field of mining, and comprises the following steps: S1, carrying out secondary delineation on an ore body; s2, dividing the ore body into a middle section, and dividing the middle section into an upper mining area and a lower mining area; s3, upper and lower mining areas are divided according to stope panels; s4, digging a stope connection roadway in a lower mining area to enter the ore body, and then tunneling along the footwall of the ore body to fill an air return shaft so that the air return shaft is communicated with the upper middle section transverse drift roadway; s5, stope separation, stoping and filling are conducted on the lower mining area ore body till stoping is conducted to the upper mining area ore body height; s6, coping is conducted on the stope connection roadway; s7, the ore body panel of the upper mining area is divided into stopes, stoping is conducted according to the platform and the reserved</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN117266853A |
source | esp@cenet |
subjects | EARTH DRILLING FIXED CONSTRUCTIONS MINING MINING OR QUARRYING SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS |
title | Interactive link mining method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-19T16%3A16%3A45IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHOU%20LI&rft.date=2023-12-22&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117266853A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |