Precise and rapid anti-collision hoisting method for ramp steel box girder connected into existing viaduct

The invention discloses an accurate and rapid anti-collision hoisting method for a ramp steel box girder connected into an existing elevated road. The method comprises the following steps: carrying out lengthening and support changing treatment on an existing cross beam of the highway; all supportin...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHANG QINFENG, SUN XUECHUAN, WU ZHENGJUN, LIU XUEKANG, AI YONGXIANG, ZHAO FANGZHU, TAO BO, ZHU ZHENHUA, PENG PANXI, GAO CHONGHE
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHANG QINFENG
SUN XUECHUAN
WU ZHENGJUN
LIU XUEKANG
AI YONGXIANG
ZHAO FANGZHU
TAO BO
ZHU ZHENHUA
PENG PANXI
GAO CHONGHE
description The invention discloses an accurate and rapid anti-collision hoisting method for a ramp steel box girder connected into an existing elevated road. The method comprises the following steps: carrying out lengthening and support changing treatment on an existing cross beam of the highway; all supporting frame bodies are built between every two adjacent lengthened cross beams, and transportation rails are laid on the supporting frame bodies; each transportation platform truck is hoisted to the corresponding first section of transportation track, and then each section of steel box girder is hoisted and placed on the transportation platform truck in sequence; all the sections of steel box girders are sequentially conveyed to the construction position along the conveying rail; the two adjacent steel box girders are welded; the whole section is driven to descend until the two ends of the section abut against the adjacent lengthened cross beams respectively; each transportation platform truck is transported to the mai
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117266047A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117266047A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117266047A3</originalsourceid><addsrcrecordid>eNqNizEOgkAQAGksjPqH9QEkogZqQzRWxsKenHcLLDl2L3er4flS8ACrmWJmnQ3PiJYSgmEH0QRysynlVrynRMLQCyUl7mBE7cVBK3EOxwBJET28ZYKOosMIVpjRKjogVgGclvFLxn2sbrNVa3zC3cJNtr9dX_U9xyANpmAsMmpTP4qiOpbl4VxdTv80P6PEQVA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Precise and rapid anti-collision hoisting method for ramp steel box girder connected into existing viaduct</title><source>esp@cenet</source><creator>ZHANG QINFENG ; SUN XUECHUAN ; WU ZHENGJUN ; LIU XUEKANG ; AI YONGXIANG ; ZHAO FANGZHU ; TAO BO ; ZHU ZHENHUA ; PENG PANXI ; GAO CHONGHE</creator><creatorcontrib>ZHANG QINFENG ; SUN XUECHUAN ; WU ZHENGJUN ; LIU XUEKANG ; AI YONGXIANG ; ZHAO FANGZHU ; TAO BO ; ZHU ZHENHUA ; PENG PANXI ; GAO CHONGHE</creatorcontrib><description>The invention discloses an accurate and rapid anti-collision hoisting method for a ramp steel box girder connected into an existing elevated road. The method comprises the following steps: carrying out lengthening and support changing treatment on an existing cross beam of the highway; all supporting frame bodies are built between every two adjacent lengthened cross beams, and transportation rails are laid on the supporting frame bodies; each transportation platform truck is hoisted to the corresponding first section of transportation track, and then each section of steel box girder is hoisted and placed on the transportation platform truck in sequence; all the sections of steel box girders are sequentially conveyed to the construction position along the conveying rail; the two adjacent steel box girders are welded; the whole section is driven to descend until the two ends of the section abut against the adjacent lengthened cross beams respectively; each transportation platform truck is transported to the mai</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; CRANES ; FIXED CONSTRUCTIONS ; HAULING ; HOISTING ; LIFTING ; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES ; OR VIADUCTS ; PERFORMING OPERATIONS ; TRANSPORTING</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20231222&amp;DB=EPODOC&amp;CC=CN&amp;NR=117266047A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20231222&amp;DB=EPODOC&amp;CC=CN&amp;NR=117266047A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG QINFENG</creatorcontrib><creatorcontrib>SUN XUECHUAN</creatorcontrib><creatorcontrib>WU ZHENGJUN</creatorcontrib><creatorcontrib>LIU XUEKANG</creatorcontrib><creatorcontrib>AI YONGXIANG</creatorcontrib><creatorcontrib>ZHAO FANGZHU</creatorcontrib><creatorcontrib>TAO BO</creatorcontrib><creatorcontrib>ZHU ZHENHUA</creatorcontrib><creatorcontrib>PENG PANXI</creatorcontrib><creatorcontrib>GAO CHONGHE</creatorcontrib><title>Precise and rapid anti-collision hoisting method for ramp steel box girder connected into existing viaduct</title><description>The invention discloses an accurate and rapid anti-collision hoisting method for a ramp steel box girder connected into an existing elevated road. The method comprises the following steps: carrying out lengthening and support changing treatment on an existing cross beam of the highway; all supporting frame bodies are built between every two adjacent lengthened cross beams, and transportation rails are laid on the supporting frame bodies; each transportation platform truck is hoisted to the corresponding first section of transportation track, and then each section of steel box girder is hoisted and placed on the transportation platform truck in sequence; all the sections of steel box girders are sequentially conveyed to the construction position along the conveying rail; the two adjacent steel box girders are welded; the whole section is driven to descend until the two ends of the section abut against the adjacent lengthened cross beams respectively; each transportation platform truck is transported to the mai</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>CRANES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>HAULING</subject><subject>HOISTING</subject><subject>LIFTING</subject><subject>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</subject><subject>OR VIADUCTS</subject><subject>PERFORMING OPERATIONS</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNizEOgkAQAGksjPqH9QEkogZqQzRWxsKenHcLLDl2L3er4flS8ACrmWJmnQ3PiJYSgmEH0QRysynlVrynRMLQCyUl7mBE7cVBK3EOxwBJET28ZYKOosMIVpjRKjogVgGclvFLxn2sbrNVa3zC3cJNtr9dX_U9xyANpmAsMmpTP4qiOpbl4VxdTv80P6PEQVA</recordid><startdate>20231222</startdate><enddate>20231222</enddate><creator>ZHANG QINFENG</creator><creator>SUN XUECHUAN</creator><creator>WU ZHENGJUN</creator><creator>LIU XUEKANG</creator><creator>AI YONGXIANG</creator><creator>ZHAO FANGZHU</creator><creator>TAO BO</creator><creator>ZHU ZHENHUA</creator><creator>PENG PANXI</creator><creator>GAO CHONGHE</creator><scope>EVB</scope></search><sort><creationdate>20231222</creationdate><title>Precise and rapid anti-collision hoisting method for ramp steel box girder connected into existing viaduct</title><author>ZHANG QINFENG ; SUN XUECHUAN ; WU ZHENGJUN ; LIU XUEKANG ; AI YONGXIANG ; ZHAO FANGZHU ; TAO BO ; ZHU ZHENHUA ; PENG PANXI ; GAO CHONGHE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117266047A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>CRANES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>HAULING</topic><topic>HOISTING</topic><topic>LIFTING</topic><topic>LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES</topic><topic>OR VIADUCTS</topic><topic>PERFORMING OPERATIONS</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG QINFENG</creatorcontrib><creatorcontrib>SUN XUECHUAN</creatorcontrib><creatorcontrib>WU ZHENGJUN</creatorcontrib><creatorcontrib>LIU XUEKANG</creatorcontrib><creatorcontrib>AI YONGXIANG</creatorcontrib><creatorcontrib>ZHAO FANGZHU</creatorcontrib><creatorcontrib>TAO BO</creatorcontrib><creatorcontrib>ZHU ZHENHUA</creatorcontrib><creatorcontrib>PENG PANXI</creatorcontrib><creatorcontrib>GAO CHONGHE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG QINFENG</au><au>SUN XUECHUAN</au><au>WU ZHENGJUN</au><au>LIU XUEKANG</au><au>AI YONGXIANG</au><au>ZHAO FANGZHU</au><au>TAO BO</au><au>ZHU ZHENHUA</au><au>PENG PANXI</au><au>GAO CHONGHE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Precise and rapid anti-collision hoisting method for ramp steel box girder connected into existing viaduct</title><date>2023-12-22</date><risdate>2023</risdate><abstract>The invention discloses an accurate and rapid anti-collision hoisting method for a ramp steel box girder connected into an existing elevated road. The method comprises the following steps: carrying out lengthening and support changing treatment on an existing cross beam of the highway; all supporting frame bodies are built between every two adjacent lengthened cross beams, and transportation rails are laid on the supporting frame bodies; each transportation platform truck is hoisted to the corresponding first section of transportation track, and then each section of steel box girder is hoisted and placed on the transportation platform truck in sequence; all the sections of steel box girders are sequentially conveyed to the construction position along the conveying rail; the two adjacent steel box girders are welded; the whole section is driven to descend until the two ends of the section abut against the adjacent lengthened cross beams respectively; each transportation platform truck is transported to the mai</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN117266047A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
CRANES
FIXED CONSTRUCTIONS
HAULING
HOISTING
LIFTING
LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS,WINCHES, OR TACKLES
OR VIADUCTS
PERFORMING OPERATIONS
TRANSPORTING
title Precise and rapid anti-collision hoisting method for ramp steel box girder connected into existing viaduct
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-07T05%3A35%3A13IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20QINFENG&rft.date=2023-12-22&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117266047A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true