Rapid positioning and laying method for straight tower foundation of overhead line
The invention provides an overhead line straight line tower foundation rapid positioning and laying method which comprises the steps that S1, a telescopic frame is arranged at a 1 # pile position on the ground, a telescopic pole on the telescopic frame is commanded to be placed at a direction pile p...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | LIU ZUOHOU WU HAIXIA ZHU QINGHUA WANG JIAN WANG FUGEN LU GANPENG ZHU DAIFA HU XIBING WANG GAN XU MENGXIA JIANG QIANJUN SUN HUI HE MENGJIE |
description | The invention provides an overhead line straight line tower foundation rapid positioning and laying method which comprises the steps that S1, a telescopic frame is arranged at a 1 # pile position on the ground, a telescopic pole on the telescopic frame is commanded to be placed at a direction pile position on the ground, and the advancing direction of a line is determined; s3, basic point location identification: S3.1, one end of an auxiliary rod is assembled on a telescopic frame, and the other end of the auxiliary rod is assembled on an identification rod; s3.2, a supporting assembly in the identification rod is rotated to be in a horizontal state; s3.3, the top end of the marking mechanism is hung on the auxiliary rod, and the side face of the marking mechanism is assembled at the outer end of the supporting assembly; and S3.4, translating and adjusting the marking mechanism to the square root of 2/2L position. Each pile position can be quickly and accurately determined, and the auxiliary rod and the ident |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117188451A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117188451A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117188451A3</originalsourceid><addsrcrecordid>eNqNizEKwkAQRbexEPUO4wEsFhXTSlCsLIJ9GNzZZCDOLLuj4u1NwANYvc_jv7lrGkwcIGlhYxWWDlACDPiZ5oOs1wBRMxTLyF1vYPqmPKqnBJwS0Aj6otwTjh0LLd0s4lBo9ePCrc-nW33ZUNKWSsI7CVlbX70_-Kra7f1x-8_nCz7BOFw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Rapid positioning and laying method for straight tower foundation of overhead line</title><source>esp@cenet</source><creator>LIU ZUOHOU ; WU HAIXIA ; ZHU QINGHUA ; WANG JIAN ; WANG FUGEN ; LU GANPENG ; ZHU DAIFA ; HU XIBING ; WANG GAN ; XU MENGXIA ; JIANG QIANJUN ; SUN HUI ; HE MENGJIE</creator><creatorcontrib>LIU ZUOHOU ; WU HAIXIA ; ZHU QINGHUA ; WANG JIAN ; WANG FUGEN ; LU GANPENG ; ZHU DAIFA ; HU XIBING ; WANG GAN ; XU MENGXIA ; JIANG QIANJUN ; SUN HUI ; HE MENGJIE</creatorcontrib><description>The invention provides an overhead line straight line tower foundation rapid positioning and laying method which comprises the steps that S1, a telescopic frame is arranged at a 1 # pile position on the ground, a telescopic pole on the telescopic frame is commanded to be placed at a direction pile position on the ground, and the advancing direction of a line is determined; s3, basic point location identification: S3.1, one end of an auxiliary rod is assembled on a telescopic frame, and the other end of the auxiliary rod is assembled on an identification rod; s3.2, a supporting assembly in the identification rod is rotated to be in a horizontal state; s3.3, the top end of the marking mechanism is hung on the auxiliary rod, and the side face of the marking mechanism is assembled at the outer end of the supporting assembly; and S3.4, translating and adjusting the marking mechanism to the square root of 2/2L position. Each pile position can be quickly and accurately determined, and the auxiliary rod and the ident</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20231208&DB=EPODOC&CC=CN&NR=117188451A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76294</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20231208&DB=EPODOC&CC=CN&NR=117188451A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIU ZUOHOU</creatorcontrib><creatorcontrib>WU HAIXIA</creatorcontrib><creatorcontrib>ZHU QINGHUA</creatorcontrib><creatorcontrib>WANG JIAN</creatorcontrib><creatorcontrib>WANG FUGEN</creatorcontrib><creatorcontrib>LU GANPENG</creatorcontrib><creatorcontrib>ZHU DAIFA</creatorcontrib><creatorcontrib>HU XIBING</creatorcontrib><creatorcontrib>WANG GAN</creatorcontrib><creatorcontrib>XU MENGXIA</creatorcontrib><creatorcontrib>JIANG QIANJUN</creatorcontrib><creatorcontrib>SUN HUI</creatorcontrib><creatorcontrib>HE MENGJIE</creatorcontrib><title>Rapid positioning and laying method for straight tower foundation of overhead line</title><description>The invention provides an overhead line straight line tower foundation rapid positioning and laying method which comprises the steps that S1, a telescopic frame is arranged at a 1 # pile position on the ground, a telescopic pole on the telescopic frame is commanded to be placed at a direction pile position on the ground, and the advancing direction of a line is determined; s3, basic point location identification: S3.1, one end of an auxiliary rod is assembled on a telescopic frame, and the other end of the auxiliary rod is assembled on an identification rod; s3.2, a supporting assembly in the identification rod is rotated to be in a horizontal state; s3.3, the top end of the marking mechanism is hung on the auxiliary rod, and the side face of the marking mechanism is assembled at the outer end of the supporting assembly; and S3.4, translating and adjusting the marking mechanism to the square root of 2/2L position. Each pile position can be quickly and accurately determined, and the auxiliary rod and the ident</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNizEKwkAQRbexEPUO4wEsFhXTSlCsLIJ9GNzZZCDOLLuj4u1NwANYvc_jv7lrGkwcIGlhYxWWDlACDPiZ5oOs1wBRMxTLyF1vYPqmPKqnBJwS0Aj6otwTjh0LLd0s4lBo9ePCrc-nW33ZUNKWSsI7CVlbX70_-Kra7f1x-8_nCz7BOFw</recordid><startdate>20231208</startdate><enddate>20231208</enddate><creator>LIU ZUOHOU</creator><creator>WU HAIXIA</creator><creator>ZHU QINGHUA</creator><creator>WANG JIAN</creator><creator>WANG FUGEN</creator><creator>LU GANPENG</creator><creator>ZHU DAIFA</creator><creator>HU XIBING</creator><creator>WANG GAN</creator><creator>XU MENGXIA</creator><creator>JIANG QIANJUN</creator><creator>SUN HUI</creator><creator>HE MENGJIE</creator><scope>EVB</scope></search><sort><creationdate>20231208</creationdate><title>Rapid positioning and laying method for straight tower foundation of overhead line</title><author>LIU ZUOHOU ; WU HAIXIA ; ZHU QINGHUA ; WANG JIAN ; WANG FUGEN ; LU GANPENG ; ZHU DAIFA ; HU XIBING ; WANG GAN ; XU MENGXIA ; JIANG QIANJUN ; SUN HUI ; HE MENGJIE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117188451A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>LIU ZUOHOU</creatorcontrib><creatorcontrib>WU HAIXIA</creatorcontrib><creatorcontrib>ZHU QINGHUA</creatorcontrib><creatorcontrib>WANG JIAN</creatorcontrib><creatorcontrib>WANG FUGEN</creatorcontrib><creatorcontrib>LU GANPENG</creatorcontrib><creatorcontrib>ZHU DAIFA</creatorcontrib><creatorcontrib>HU XIBING</creatorcontrib><creatorcontrib>WANG GAN</creatorcontrib><creatorcontrib>XU MENGXIA</creatorcontrib><creatorcontrib>JIANG QIANJUN</creatorcontrib><creatorcontrib>SUN HUI</creatorcontrib><creatorcontrib>HE MENGJIE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIU ZUOHOU</au><au>WU HAIXIA</au><au>ZHU QINGHUA</au><au>WANG JIAN</au><au>WANG FUGEN</au><au>LU GANPENG</au><au>ZHU DAIFA</au><au>HU XIBING</au><au>WANG GAN</au><au>XU MENGXIA</au><au>JIANG QIANJUN</au><au>SUN HUI</au><au>HE MENGJIE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Rapid positioning and laying method for straight tower foundation of overhead line</title><date>2023-12-08</date><risdate>2023</risdate><abstract>The invention provides an overhead line straight line tower foundation rapid positioning and laying method which comprises the steps that S1, a telescopic frame is arranged at a 1 # pile position on the ground, a telescopic pole on the telescopic frame is commanded to be placed at a direction pile position on the ground, and the advancing direction of a line is determined; s3, basic point location identification: S3.1, one end of an auxiliary rod is assembled on a telescopic frame, and the other end of the auxiliary rod is assembled on an identification rod; s3.2, a supporting assembly in the identification rod is rotated to be in a horizontal state; s3.3, the top end of the marking mechanism is hung on the auxiliary rod, and the side face of the marking mechanism is assembled at the outer end of the supporting assembly; and S3.4, translating and adjusting the marking mechanism to the square root of 2/2L position. Each pile position can be quickly and accurately determined, and the auxiliary rod and the ident</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN117188451A |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Rapid positioning and laying method for straight tower foundation of overhead line |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-21T21%3A59%3A49IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIU%20ZUOHOU&rft.date=2023-12-08&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117188451A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |