Anticorrosion treatment method for stiff composite pile

The invention discloses an anti-corrosion treatment method for a stiff composite pile, and relates to the field of anti-corrosion of composite piles. Comprising the following steps that a steel mold system is designed and comprises an upper half mold, a lower half mold and an edge clamping structure...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LI HUANHUAN, GE JINLEI, JIANG FUSHENG, WANG BIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LI HUANHUAN
GE JINLEI
JIANG FUSHENG
WANG BIN
description The invention discloses an anti-corrosion treatment method for a stiff composite pile, and relates to the field of anti-corrosion of composite piles. Comprising the following steps that a steel mold system is designed and comprises an upper half mold, a lower half mold and an edge clamping structure; the formed composite pile comprises a reinforcement cage and a pile head disc. A reinforcement cage is placed in the lower half mold, pile head discs are connected to the two ends of the reinforcement cage, and the ends of the reinforcement cage penetrate through the pile head discs and are provided with fixing pieces for fixing; anti-corrosion coatings are sprayed on the inner walls of the upper half mold and the lower half mold, and mold closing is conducted through edge clamping structures after inspection and acceptance; spherical hoop pieces are installed in center holes of the pile head discs on the two sides of the formed composite pile, and a pipe pile body is formed through pouring. The formed composite
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117086999A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117086999A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117086999A3</originalsourceid><addsrcrecordid>eNrjZDB3zCvJTM4vKsovzszPUygpSk0syU3NK1HITS3JyE9RSMsvUiguyUxLU0jOzy0AKipJVSjIzEnlYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhuYGFmaWlpaOxsSoAQAgpS6h</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Anticorrosion treatment method for stiff composite pile</title><source>esp@cenet</source><creator>LI HUANHUAN ; GE JINLEI ; JIANG FUSHENG ; WANG BIN</creator><creatorcontrib>LI HUANHUAN ; GE JINLEI ; JIANG FUSHENG ; WANG BIN</creatorcontrib><description>The invention discloses an anti-corrosion treatment method for a stiff composite pile, and relates to the field of anti-corrosion of composite piles. Comprising the following steps that a steel mold system is designed and comprises an upper half mold, a lower half mold and an edge clamping structure; the formed composite pile comprises a reinforcement cage and a pile head disc. A reinforcement cage is placed in the lower half mold, pile head discs are connected to the two ends of the reinforcement cage, and the ends of the reinforcement cage penetrate through the pile head discs and are provided with fixing pieces for fixing; anti-corrosion coatings are sprayed on the inner walls of the upper half mold and the lower half mold, and mold closing is conducted through edge clamping structures after inspection and acceptance; spherical hoop pieces are installed in center holes of the pile head discs on the two sides of the formed composite pile, and a pipe pile body is formed through pouring. The formed composite</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; PERFORMING OPERATIONS ; SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG, OR MIXTURESCONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER ; SOIL SHIFTING ; TRANSPORTING ; UNDERGROUND OR UNDERWATER STRUCTURES ; WORKING CEMENT, CLAY, OR STONE</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20231121&amp;DB=EPODOC&amp;CC=CN&amp;NR=117086999A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20231121&amp;DB=EPODOC&amp;CC=CN&amp;NR=117086999A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LI HUANHUAN</creatorcontrib><creatorcontrib>GE JINLEI</creatorcontrib><creatorcontrib>JIANG FUSHENG</creatorcontrib><creatorcontrib>WANG BIN</creatorcontrib><title>Anticorrosion treatment method for stiff composite pile</title><description>The invention discloses an anti-corrosion treatment method for a stiff composite pile, and relates to the field of anti-corrosion of composite piles. Comprising the following steps that a steel mold system is designed and comprises an upper half mold, a lower half mold and an edge clamping structure; the formed composite pile comprises a reinforcement cage and a pile head disc. A reinforcement cage is placed in the lower half mold, pile head discs are connected to the two ends of the reinforcement cage, and the ends of the reinforcement cage penetrate through the pile head discs and are provided with fixing pieces for fixing; anti-corrosion coatings are sprayed on the inner walls of the upper half mold and the lower half mold, and mold closing is conducted through edge clamping structures after inspection and acceptance; spherical hoop pieces are installed in center holes of the pile head discs on the two sides of the formed composite pile, and a pipe pile body is formed through pouring. The formed composite</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>PERFORMING OPERATIONS</subject><subject>SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG, OR MIXTURESCONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER</subject><subject>SOIL SHIFTING</subject><subject>TRANSPORTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><subject>WORKING CEMENT, CLAY, OR STONE</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDB3zCvJTM4vKsovzszPUygpSk0syU3NK1HITS3JyE9RSMsvUiguyUxLU0jOzy0AKipJVSjIzEnlYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhuYGFmaWlpaOxsSoAQAgpS6h</recordid><startdate>20231121</startdate><enddate>20231121</enddate><creator>LI HUANHUAN</creator><creator>GE JINLEI</creator><creator>JIANG FUSHENG</creator><creator>WANG BIN</creator><scope>EVB</scope></search><sort><creationdate>20231121</creationdate><title>Anticorrosion treatment method for stiff composite pile</title><author>LI HUANHUAN ; GE JINLEI ; JIANG FUSHENG ; WANG BIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117086999A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>PERFORMING OPERATIONS</topic><topic>SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG, OR MIXTURESCONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER</topic><topic>SOIL SHIFTING</topic><topic>TRANSPORTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><topic>WORKING CEMENT, CLAY, OR STONE</topic><toplevel>online_resources</toplevel><creatorcontrib>LI HUANHUAN</creatorcontrib><creatorcontrib>GE JINLEI</creatorcontrib><creatorcontrib>JIANG FUSHENG</creatorcontrib><creatorcontrib>WANG BIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LI HUANHUAN</au><au>GE JINLEI</au><au>JIANG FUSHENG</au><au>WANG BIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Anticorrosion treatment method for stiff composite pile</title><date>2023-11-21</date><risdate>2023</risdate><abstract>The invention discloses an anti-corrosion treatment method for a stiff composite pile, and relates to the field of anti-corrosion of composite piles. Comprising the following steps that a steel mold system is designed and comprises an upper half mold, a lower half mold and an edge clamping structure; the formed composite pile comprises a reinforcement cage and a pile head disc. A reinforcement cage is placed in the lower half mold, pile head discs are connected to the two ends of the reinforcement cage, and the ends of the reinforcement cage penetrate through the pile head discs and are provided with fixing pieces for fixing; anti-corrosion coatings are sprayed on the inner walls of the upper half mold and the lower half mold, and mold closing is conducted through edge clamping structures after inspection and acceptance; spherical hoop pieces are installed in center holes of the pile head discs on the two sides of the formed composite pile, and a pipe pile body is formed through pouring. The formed composite</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN117086999A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
PERFORMING OPERATIONS
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG, OR MIXTURESCONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
SOIL SHIFTING
TRANSPORTING
UNDERGROUND OR UNDERWATER STRUCTURES
WORKING CEMENT, CLAY, OR STONE
title Anticorrosion treatment method for stiff composite pile
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-06T20%3A59%3A25IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LI%20HUANHUAN&rft.date=2023-11-21&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117086999A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true