High formwork construction monitoring method based on Gaussian hybrid clustering algorithm
The invention provides a high-support formwork construction monitoring method based on a Gaussian hybrid clustering algorithm. The method comprises the following steps: firstly, dividing construction monitoring and safety early warning monitoring of a high-support formwork on a construction site int...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | YANG GUANG ZHANG YOULIANG HUANG JUNFENG CHEN WEIJIE ZHUANG WENSHENG |
description | The invention provides a high-support formwork construction monitoring method based on a Gaussian hybrid clustering algorithm. The method comprises the following steps: firstly, dividing construction monitoring and safety early warning monitoring of a high-support formwork on a construction site into monitoring of each divided area and monitoring of an overall structure; then, carrying out engineering mechanical analysis and risk hypothesis evaluation on each divided region and the overall structure of the high-support formwork to respectively obtain a complete life cycle data set capable of representing each divided region and the overall structure; and finally, processing the data information through a Gaussian hybrid clustering algorithm to obtain a posterior probability and a cluster division function of the Gaussian hybrid clustering algorithm representing each division region and the overall structure of the high-support formwork, automatically obtaining high-support formwork real-time data provided by |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117077535A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117077535A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117077535A3</originalsourceid><addsrcrecordid>eNqNi7EKwjAQQLs4iPoP5wcIllIyS1E7OTm5lDS9JsEkV3JXxL-3iB_g9Ib33rp4tN46GCnHF-UnGEoseTbiKUGk5IWyTxYiiqMBes04wKKuemb2OoF799kPYMLMgt9UB7s84uK2WI06MO5-3BT7y_netAecqEOetMGE0jW3slRHpeqqPlX_NB-snTwS</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>High formwork construction monitoring method based on Gaussian hybrid clustering algorithm</title><source>esp@cenet</source><creator>YANG GUANG ; ZHANG YOULIANG ; HUANG JUNFENG ; CHEN WEIJIE ; ZHUANG WENSHENG</creator><creatorcontrib>YANG GUANG ; ZHANG YOULIANG ; HUANG JUNFENG ; CHEN WEIJIE ; ZHUANG WENSHENG</creatorcontrib><description>The invention provides a high-support formwork construction monitoring method based on a Gaussian hybrid clustering algorithm. The method comprises the following steps: firstly, dividing construction monitoring and safety early warning monitoring of a high-support formwork on a construction site into monitoring of each divided area and monitoring of an overall structure; then, carrying out engineering mechanical analysis and risk hypothesis evaluation on each divided region and the overall structure of the high-support formwork to respectively obtain a complete life cycle data set capable of representing each divided region and the overall structure; and finally, processing the data information through a Gaussian hybrid clustering algorithm to obtain a posterior probability and a cluster division function of the Gaussian hybrid clustering algorithm representing each division region and the overall structure of the high-support formwork, automatically obtaining high-support formwork real-time data provided by</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; ELECTRIC DIGITAL DATA PROCESSING ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20231117&DB=EPODOC&CC=CN&NR=117077535A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76419</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20231117&DB=EPODOC&CC=CN&NR=117077535A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YANG GUANG</creatorcontrib><creatorcontrib>ZHANG YOULIANG</creatorcontrib><creatorcontrib>HUANG JUNFENG</creatorcontrib><creatorcontrib>CHEN WEIJIE</creatorcontrib><creatorcontrib>ZHUANG WENSHENG</creatorcontrib><title>High formwork construction monitoring method based on Gaussian hybrid clustering algorithm</title><description>The invention provides a high-support formwork construction monitoring method based on a Gaussian hybrid clustering algorithm. The method comprises the following steps: firstly, dividing construction monitoring and safety early warning monitoring of a high-support formwork on a construction site into monitoring of each divided area and monitoring of an overall structure; then, carrying out engineering mechanical analysis and risk hypothesis evaluation on each divided region and the overall structure of the high-support formwork to respectively obtain a complete life cycle data set capable of representing each divided region and the overall structure; and finally, processing the data information through a Gaussian hybrid clustering algorithm to obtain a posterior probability and a cluster division function of the Gaussian hybrid clustering algorithm representing each division region and the overall structure of the high-support formwork, automatically obtaining high-support formwork real-time data provided by</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>ELECTRIC DIGITAL DATA PROCESSING</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNi7EKwjAQQLs4iPoP5wcIllIyS1E7OTm5lDS9JsEkV3JXxL-3iB_g9Ib33rp4tN46GCnHF-UnGEoseTbiKUGk5IWyTxYiiqMBes04wKKuemb2OoF799kPYMLMgt9UB7s84uK2WI06MO5-3BT7y_netAecqEOetMGE0jW3slRHpeqqPlX_NB-snTwS</recordid><startdate>20231117</startdate><enddate>20231117</enddate><creator>YANG GUANG</creator><creator>ZHANG YOULIANG</creator><creator>HUANG JUNFENG</creator><creator>CHEN WEIJIE</creator><creator>ZHUANG WENSHENG</creator><scope>EVB</scope></search><sort><creationdate>20231117</creationdate><title>High formwork construction monitoring method based on Gaussian hybrid clustering algorithm</title><author>YANG GUANG ; ZHANG YOULIANG ; HUANG JUNFENG ; CHEN WEIJIE ; ZHUANG WENSHENG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117077535A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>ELECTRIC DIGITAL DATA PROCESSING</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>YANG GUANG</creatorcontrib><creatorcontrib>ZHANG YOULIANG</creatorcontrib><creatorcontrib>HUANG JUNFENG</creatorcontrib><creatorcontrib>CHEN WEIJIE</creatorcontrib><creatorcontrib>ZHUANG WENSHENG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YANG GUANG</au><au>ZHANG YOULIANG</au><au>HUANG JUNFENG</au><au>CHEN WEIJIE</au><au>ZHUANG WENSHENG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>High formwork construction monitoring method based on Gaussian hybrid clustering algorithm</title><date>2023-11-17</date><risdate>2023</risdate><abstract>The invention provides a high-support formwork construction monitoring method based on a Gaussian hybrid clustering algorithm. The method comprises the following steps: firstly, dividing construction monitoring and safety early warning monitoring of a high-support formwork on a construction site into monitoring of each divided area and monitoring of an overall structure; then, carrying out engineering mechanical analysis and risk hypothesis evaluation on each divided region and the overall structure of the high-support formwork to respectively obtain a complete life cycle data set capable of representing each divided region and the overall structure; and finally, processing the data information through a Gaussian hybrid clustering algorithm to obtain a posterior probability and a cluster division function of the Gaussian hybrid clustering algorithm representing each division region and the overall structure of the high-support formwork, automatically obtaining high-support formwork real-time data provided by</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN117077535A |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ELECTRIC DIGITAL DATA PROCESSING PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | High formwork construction monitoring method based on Gaussian hybrid clustering algorithm |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-07T22%3A57%3A45IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YANG%20GUANG&rft.date=2023-11-17&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117077535A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |