Transformer area uncertainty on-site management scheduling method based on low-voltage flexible direct current interconnection

The invention discloses a transformer area uncertainty on-site management scheduling method based on low-voltage flexible direct-current interconnection. The method comprises the following steps: establishing an on-site management strategy considering transformer area uncertainty of flexible direct-...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG LONGJIANG, YU JUNXIA, PENG CHENG, LI XIAOZHI, DING CHAO, KONG PENG, REN LIANGLU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WANG LONGJIANG
YU JUNXIA
PENG CHENG
LI XIAOZHI
DING CHAO
KONG PENG
REN LIANGLU
description The invention discloses a transformer area uncertainty on-site management scheduling method based on low-voltage flexible direct-current interconnection. The method comprises the following steps: establishing an on-site management strategy considering transformer area uncertainty of flexible direct-current interconnection; establishing a day-ahead optimization model with the goal of minimizing the operation and maintenance cost of the transformer area; establishing a real-time optimization model with the minimum deviation of the power purchasing power of the transformer area in the two stages as a target; and based on the day-ahead-real-time two-stage optimization model, a commercial solver is adopted to solve the model. According to the method, on-site management of the uncertainty of the new energy power generation power can be realized, the influence of intermittency and volatility on a superior power grid is reduced, and tracking of a planned power purchase power curve is realized through a two-stage opti
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117039901A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117039901A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117039901A3</originalsourceid><addsrcrecordid>eNqNzL0OgkAQBGAaC6O-w_oAJBAKQ2mIxsqKnizHgJcce2Tv8Kfx2cXEB7CaZPLNrJN3rSyh9zpCiRVMsxhoZCvxRV7SYCNoZOEBIyRSMDd0s7My0Ih48x21HNAtlJx_pHfv4kKpd3ja1oE6qzCRzKz6nS-3UONFltJ62Sarnl3A7pebZH8-1dUlxeQbhIkNBLGprnl-yIqyzPJj8Y_5AFFYSdA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Transformer area uncertainty on-site management scheduling method based on low-voltage flexible direct current interconnection</title><source>esp@cenet</source><creator>WANG LONGJIANG ; YU JUNXIA ; PENG CHENG ; LI XIAOZHI ; DING CHAO ; KONG PENG ; REN LIANGLU</creator><creatorcontrib>WANG LONGJIANG ; YU JUNXIA ; PENG CHENG ; LI XIAOZHI ; DING CHAO ; KONG PENG ; REN LIANGLU</creatorcontrib><description>The invention discloses a transformer area uncertainty on-site management scheduling method based on low-voltage flexible direct-current interconnection. The method comprises the following steps: establishing an on-site management strategy considering transformer area uncertainty of flexible direct-current interconnection; establishing a day-ahead optimization model with the goal of minimizing the operation and maintenance cost of the transformer area; establishing a real-time optimization model with the minimum deviation of the power purchasing power of the transformer area in the two stages as a target; and based on the day-ahead-real-time two-stage optimization model, a commercial solver is adopted to solve the model. According to the method, on-site management of the uncertainty of the new energy power generation power can be realized, the influence of intermittency and volatility on a superior power grid is reduced, and tracking of a planned power purchase power curve is realized through a two-stage opti</description><language>chi ; eng</language><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; ELECTRICITY ; GENERATION ; SYSTEMS FOR STORING ELECTRIC ENERGY</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20231110&amp;DB=EPODOC&amp;CC=CN&amp;NR=117039901A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20231110&amp;DB=EPODOC&amp;CC=CN&amp;NR=117039901A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG LONGJIANG</creatorcontrib><creatorcontrib>YU JUNXIA</creatorcontrib><creatorcontrib>PENG CHENG</creatorcontrib><creatorcontrib>LI XIAOZHI</creatorcontrib><creatorcontrib>DING CHAO</creatorcontrib><creatorcontrib>KONG PENG</creatorcontrib><creatorcontrib>REN LIANGLU</creatorcontrib><title>Transformer area uncertainty on-site management scheduling method based on low-voltage flexible direct current interconnection</title><description>The invention discloses a transformer area uncertainty on-site management scheduling method based on low-voltage flexible direct-current interconnection. The method comprises the following steps: establishing an on-site management strategy considering transformer area uncertainty of flexible direct-current interconnection; establishing a day-ahead optimization model with the goal of minimizing the operation and maintenance cost of the transformer area; establishing a real-time optimization model with the minimum deviation of the power purchasing power of the transformer area in the two stages as a target; and based on the day-ahead-real-time two-stage optimization model, a commercial solver is adopted to solve the model. According to the method, on-site management of the uncertainty of the new energy power generation power can be realized, the influence of intermittency and volatility on a superior power grid is reduced, and tracking of a planned power purchase power curve is realized through a two-stage opti</description><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>ELECTRICITY</subject><subject>GENERATION</subject><subject>SYSTEMS FOR STORING ELECTRIC ENERGY</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNzL0OgkAQBGAaC6O-w_oAJBAKQ2mIxsqKnizHgJcce2Tv8Kfx2cXEB7CaZPLNrJN3rSyh9zpCiRVMsxhoZCvxRV7SYCNoZOEBIyRSMDd0s7My0Ih48x21HNAtlJx_pHfv4kKpd3ja1oE6qzCRzKz6nS-3UONFltJ62Sarnl3A7pebZH8-1dUlxeQbhIkNBLGprnl-yIqyzPJj8Y_5AFFYSdA</recordid><startdate>20231110</startdate><enddate>20231110</enddate><creator>WANG LONGJIANG</creator><creator>YU JUNXIA</creator><creator>PENG CHENG</creator><creator>LI XIAOZHI</creator><creator>DING CHAO</creator><creator>KONG PENG</creator><creator>REN LIANGLU</creator><scope>EVB</scope></search><sort><creationdate>20231110</creationdate><title>Transformer area uncertainty on-site management scheduling method based on low-voltage flexible direct current interconnection</title><author>WANG LONGJIANG ; YU JUNXIA ; PENG CHENG ; LI XIAOZHI ; DING CHAO ; KONG PENG ; REN LIANGLU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117039901A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>ELECTRICITY</topic><topic>GENERATION</topic><topic>SYSTEMS FOR STORING ELECTRIC ENERGY</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG LONGJIANG</creatorcontrib><creatorcontrib>YU JUNXIA</creatorcontrib><creatorcontrib>PENG CHENG</creatorcontrib><creatorcontrib>LI XIAOZHI</creatorcontrib><creatorcontrib>DING CHAO</creatorcontrib><creatorcontrib>KONG PENG</creatorcontrib><creatorcontrib>REN LIANGLU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG LONGJIANG</au><au>YU JUNXIA</au><au>PENG CHENG</au><au>LI XIAOZHI</au><au>DING CHAO</au><au>KONG PENG</au><au>REN LIANGLU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Transformer area uncertainty on-site management scheduling method based on low-voltage flexible direct current interconnection</title><date>2023-11-10</date><risdate>2023</risdate><abstract>The invention discloses a transformer area uncertainty on-site management scheduling method based on low-voltage flexible direct-current interconnection. The method comprises the following steps: establishing an on-site management strategy considering transformer area uncertainty of flexible direct-current interconnection; establishing a day-ahead optimization model with the goal of minimizing the operation and maintenance cost of the transformer area; establishing a real-time optimization model with the minimum deviation of the power purchasing power of the transformer area in the two stages as a target; and based on the day-ahead-real-time two-stage optimization model, a commercial solver is adopted to solve the model. According to the method, on-site management of the uncertainty of the new energy power generation power can be realized, the influence of intermittency and volatility on a superior power grid is reduced, and tracking of a planned power purchase power curve is realized through a two-stage opti</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN117039901A
source esp@cenet
subjects CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER
CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
ELECTRICITY
GENERATION
SYSTEMS FOR STORING ELECTRIC ENERGY
title Transformer area uncertainty on-site management scheduling method based on low-voltage flexible direct current interconnection
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-29T23%3A45%3A30IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20LONGJIANG&rft.date=2023-11-10&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117039901A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true