Substation secondary safety measure list generation method, device, equipment and medium

The invention provides a transformer substation secondary safety measure list generation method and device, equipment and a storage medium. The method comprises the following steps: constructing a transformer substation virtual secondary circuit model through a digital twinning technology; wherein t...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SUN DIFEI, LIN SUSHAN, ZHANG LIYI, FANG ZEHUA, LIU WEIWEI, CHEN HONGSHENG, XIAO YONG, ZHONG WEN, ZHU YUTING, CAI MIAO, WU CHUCHENG, XU JIN, HUANG KAILONG, ZHANG YONGXIAN, ZOU PEIFENG, XU HUIQIANG, GAO JIAWEI, LI WEIQIANG, ZENG WENYU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator SUN DIFEI
LIN SUSHAN
ZHANG LIYI
FANG ZEHUA
LIU WEIWEI
CHEN HONGSHENG
XIAO YONG
ZHONG WEN
ZHU YUTING
CAI MIAO
WU CHUCHENG
XU JIN
HUANG KAILONG
ZHANG YONGXIAN
ZOU PEIFENG
XU HUIQIANG
GAO JIAWEI
LI WEIQIANG
ZENG WENYU
description The invention provides a transformer substation secondary safety measure list generation method and device, equipment and a storage medium. The method comprises the following steps: constructing a transformer substation virtual secondary circuit model through a digital twinning technology; wherein the transformer substation virtual secondary circuit model has secondary circuit information consistent with that of an entity transformer substation; all operation steps needing to be executed by all objects involved in the work task and the operation sequence of all the operation steps are obtained; controlling the transformer substation virtual secondary circuit model to simulate and demonstrate each operation step according to the operation sequence; and receiving a feedback instruction of a user on the demonstration result, and generating a secondary safety measure list corresponding to the work task according to an operation sequence and operation steps indicated by the feedback instruction. According to the m
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117034631A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117034631A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117034631A3</originalsourceid><addsrcrecordid>eNqNjL0KwkAQBtNYiPoOax_BENFagmJlo4VdWHNf9CD3Y3ZPyNsb0AewmmKGmWa3S7qLstrgSdAEb7gfSLiFDuTAknpQZ0XpAY_-GzroM5icDN62QU54JRsdvBJ7M1pjk5tnk5Y7weLHWbY8Hq7VaYUYakjkZvxpXZ2LYrcuN9uy2Jf_NB_otTqi</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Substation secondary safety measure list generation method, device, equipment and medium</title><source>esp@cenet</source><creator>SUN DIFEI ; LIN SUSHAN ; ZHANG LIYI ; FANG ZEHUA ; LIU WEIWEI ; CHEN HONGSHENG ; XIAO YONG ; ZHONG WEN ; ZHU YUTING ; CAI MIAO ; WU CHUCHENG ; XU JIN ; HUANG KAILONG ; ZHANG YONGXIAN ; ZOU PEIFENG ; XU HUIQIANG ; GAO JIAWEI ; LI WEIQIANG ; ZENG WENYU</creator><creatorcontrib>SUN DIFEI ; LIN SUSHAN ; ZHANG LIYI ; FANG ZEHUA ; LIU WEIWEI ; CHEN HONGSHENG ; XIAO YONG ; ZHONG WEN ; ZHU YUTING ; CAI MIAO ; WU CHUCHENG ; XU JIN ; HUANG KAILONG ; ZHANG YONGXIAN ; ZOU PEIFENG ; XU HUIQIANG ; GAO JIAWEI ; LI WEIQIANG ; ZENG WENYU</creatorcontrib><description>The invention provides a transformer substation secondary safety measure list generation method and device, equipment and a storage medium. The method comprises the following steps: constructing a transformer substation virtual secondary circuit model through a digital twinning technology; wherein the transformer substation virtual secondary circuit model has secondary circuit information consistent with that of an entity transformer substation; all operation steps needing to be executed by all objects involved in the work task and the operation sequence of all the operation steps are obtained; controlling the transformer substation virtual secondary circuit model to simulate and demonstrate each operation step according to the operation sequence; and receiving a feedback instruction of a user on the demonstration result, and generating a secondary safety measure list corresponding to the work task according to an operation sequence and operation steps indicated by the feedback instruction. According to the m</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; ELECTRIC DIGITAL DATA PROCESSING ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20231110&amp;DB=EPODOC&amp;CC=CN&amp;NR=117034631A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20231110&amp;DB=EPODOC&amp;CC=CN&amp;NR=117034631A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SUN DIFEI</creatorcontrib><creatorcontrib>LIN SUSHAN</creatorcontrib><creatorcontrib>ZHANG LIYI</creatorcontrib><creatorcontrib>FANG ZEHUA</creatorcontrib><creatorcontrib>LIU WEIWEI</creatorcontrib><creatorcontrib>CHEN HONGSHENG</creatorcontrib><creatorcontrib>XIAO YONG</creatorcontrib><creatorcontrib>ZHONG WEN</creatorcontrib><creatorcontrib>ZHU YUTING</creatorcontrib><creatorcontrib>CAI MIAO</creatorcontrib><creatorcontrib>WU CHUCHENG</creatorcontrib><creatorcontrib>XU JIN</creatorcontrib><creatorcontrib>HUANG KAILONG</creatorcontrib><creatorcontrib>ZHANG YONGXIAN</creatorcontrib><creatorcontrib>ZOU PEIFENG</creatorcontrib><creatorcontrib>XU HUIQIANG</creatorcontrib><creatorcontrib>GAO JIAWEI</creatorcontrib><creatorcontrib>LI WEIQIANG</creatorcontrib><creatorcontrib>ZENG WENYU</creatorcontrib><title>Substation secondary safety measure list generation method, device, equipment and medium</title><description>The invention provides a transformer substation secondary safety measure list generation method and device, equipment and a storage medium. The method comprises the following steps: constructing a transformer substation virtual secondary circuit model through a digital twinning technology; wherein the transformer substation virtual secondary circuit model has secondary circuit information consistent with that of an entity transformer substation; all operation steps needing to be executed by all objects involved in the work task and the operation sequence of all the operation steps are obtained; controlling the transformer substation virtual secondary circuit model to simulate and demonstrate each operation step according to the operation sequence; and receiving a feedback instruction of a user on the demonstration result, and generating a secondary safety measure list corresponding to the work task according to an operation sequence and operation steps indicated by the feedback instruction. According to the m</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>ELECTRIC DIGITAL DATA PROCESSING</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjL0KwkAQBtNYiPoOax_BENFagmJlo4VdWHNf9CD3Y3ZPyNsb0AewmmKGmWa3S7qLstrgSdAEb7gfSLiFDuTAknpQZ0XpAY_-GzroM5icDN62QU54JRsdvBJ7M1pjk5tnk5Y7weLHWbY8Hq7VaYUYakjkZvxpXZ2LYrcuN9uy2Jf_NB_otTqi</recordid><startdate>20231110</startdate><enddate>20231110</enddate><creator>SUN DIFEI</creator><creator>LIN SUSHAN</creator><creator>ZHANG LIYI</creator><creator>FANG ZEHUA</creator><creator>LIU WEIWEI</creator><creator>CHEN HONGSHENG</creator><creator>XIAO YONG</creator><creator>ZHONG WEN</creator><creator>ZHU YUTING</creator><creator>CAI MIAO</creator><creator>WU CHUCHENG</creator><creator>XU JIN</creator><creator>HUANG KAILONG</creator><creator>ZHANG YONGXIAN</creator><creator>ZOU PEIFENG</creator><creator>XU HUIQIANG</creator><creator>GAO JIAWEI</creator><creator>LI WEIQIANG</creator><creator>ZENG WENYU</creator><scope>EVB</scope></search><sort><creationdate>20231110</creationdate><title>Substation secondary safety measure list generation method, device, equipment and medium</title><author>SUN DIFEI ; LIN SUSHAN ; ZHANG LIYI ; FANG ZEHUA ; LIU WEIWEI ; CHEN HONGSHENG ; XIAO YONG ; ZHONG WEN ; ZHU YUTING ; CAI MIAO ; WU CHUCHENG ; XU JIN ; HUANG KAILONG ; ZHANG YONGXIAN ; ZOU PEIFENG ; XU HUIQIANG ; GAO JIAWEI ; LI WEIQIANG ; ZENG WENYU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117034631A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>ELECTRIC DIGITAL DATA PROCESSING</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>SUN DIFEI</creatorcontrib><creatorcontrib>LIN SUSHAN</creatorcontrib><creatorcontrib>ZHANG LIYI</creatorcontrib><creatorcontrib>FANG ZEHUA</creatorcontrib><creatorcontrib>LIU WEIWEI</creatorcontrib><creatorcontrib>CHEN HONGSHENG</creatorcontrib><creatorcontrib>XIAO YONG</creatorcontrib><creatorcontrib>ZHONG WEN</creatorcontrib><creatorcontrib>ZHU YUTING</creatorcontrib><creatorcontrib>CAI MIAO</creatorcontrib><creatorcontrib>WU CHUCHENG</creatorcontrib><creatorcontrib>XU JIN</creatorcontrib><creatorcontrib>HUANG KAILONG</creatorcontrib><creatorcontrib>ZHANG YONGXIAN</creatorcontrib><creatorcontrib>ZOU PEIFENG</creatorcontrib><creatorcontrib>XU HUIQIANG</creatorcontrib><creatorcontrib>GAO JIAWEI</creatorcontrib><creatorcontrib>LI WEIQIANG</creatorcontrib><creatorcontrib>ZENG WENYU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SUN DIFEI</au><au>LIN SUSHAN</au><au>ZHANG LIYI</au><au>FANG ZEHUA</au><au>LIU WEIWEI</au><au>CHEN HONGSHENG</au><au>XIAO YONG</au><au>ZHONG WEN</au><au>ZHU YUTING</au><au>CAI MIAO</au><au>WU CHUCHENG</au><au>XU JIN</au><au>HUANG KAILONG</au><au>ZHANG YONGXIAN</au><au>ZOU PEIFENG</au><au>XU HUIQIANG</au><au>GAO JIAWEI</au><au>LI WEIQIANG</au><au>ZENG WENYU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Substation secondary safety measure list generation method, device, equipment and medium</title><date>2023-11-10</date><risdate>2023</risdate><abstract>The invention provides a transformer substation secondary safety measure list generation method and device, equipment and a storage medium. The method comprises the following steps: constructing a transformer substation virtual secondary circuit model through a digital twinning technology; wherein the transformer substation virtual secondary circuit model has secondary circuit information consistent with that of an entity transformer substation; all operation steps needing to be executed by all objects involved in the work task and the operation sequence of all the operation steps are obtained; controlling the transformer substation virtual secondary circuit model to simulate and demonstrate each operation step according to the operation sequence; and receiving a feedback instruction of a user on the demonstration result, and generating a secondary safety measure list corresponding to the work task according to an operation sequence and operation steps indicated by the feedback instruction. According to the m</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN117034631A
source esp@cenet
subjects CALCULATING
COMPUTING
COUNTING
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES
ELECTRIC DIGITAL DATA PROCESSING
PHYSICS
SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR
title Substation secondary safety measure list generation method, device, equipment and medium
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-30T22%3A28%3A02IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SUN%20DIFEI&rft.date=2023-11-10&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117034631A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true