Method for predicting temporary occupied area of mechanical construction tower footing area in hilly region

The invention relates to a method for predicting the temporary occupied area of a tower footing area in mechanical construction in a hilly area, and belongs to the technical field of power construction methods. According to the technical scheme, a high-low leg tower footing of a single-side slope is...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: XIA LIANG, DENG JUN, ZHENG SHUO, WANG FEI, YANG XUESONG, YAN RONGHUA, HAN FEI, LIANG YIOU, XIAO YUNYING, YANG DONGXING, WANG YAN, YU HAIFENG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator XIA LIANG
DENG JUN
ZHENG SHUO
WANG FEI
YANG XUESONG
YAN RONGHUA
HAN FEI
LIANG YIOU
XIAO YUNYING
YANG DONGXING
WANG YAN
YU HAIFENG
description The invention relates to a method for predicting the temporary occupied area of a tower footing area in mechanical construction in a hilly area, and belongs to the technical field of power construction methods. According to the technical scheme, a high-low leg tower footing of a single-side slope is used as a research object, residual soil generated by field leveling of each tower leg before foundation excavation and earthwork excavated by a mechanical construction rotary drilling rig and the like are used as main measurement and calculation objects, a half-excavation and half-filling mode is adopted for construction channels, earthwork self-balancing is not calculated, and the construction efficiency is improved. Other excavation residual soil is stacked along the boundary of the construction channel, area prediction is conducted according to the situation that residual soil stacking measures are strictly executed, the residual soil with the small terrain gradient is stacked along the slope, and blocking mea
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN117033854A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN117033854A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN117033854A3</originalsourceid><addsrcrecordid>eNqNzDEKwkAQheFtLES9w3gAwRBFWwmKjVb2YZhMsoubnWV2g-T2huABrF7zvX9p3g_OVhpoRSEqN46yCx1k7qMo6ghCNETHDaAygrTQM1kMjtADSUhZh-kiAbJ8WKeOzIFZuwDWeT-CcjeRtVm06BNvfrsy29v1Vd13HKXmFJE4cK6rZ1Gc9mV5Ph4u5T_mCyW5Qe0</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Method for predicting temporary occupied area of mechanical construction tower footing area in hilly region</title><source>esp@cenet</source><creator>XIA LIANG ; DENG JUN ; ZHENG SHUO ; WANG FEI ; YANG XUESONG ; YAN RONGHUA ; HAN FEI ; LIANG YIOU ; XIAO YUNYING ; YANG DONGXING ; WANG YAN ; YU HAIFENG</creator><creatorcontrib>XIA LIANG ; DENG JUN ; ZHENG SHUO ; WANG FEI ; YANG XUESONG ; YAN RONGHUA ; HAN FEI ; LIANG YIOU ; XIAO YUNYING ; YANG DONGXING ; WANG YAN ; YU HAIFENG</creatorcontrib><description>The invention relates to a method for predicting the temporary occupied area of a tower footing area in mechanical construction in a hilly area, and belongs to the technical field of power construction methods. According to the technical scheme, a high-low leg tower footing of a single-side slope is used as a research object, residual soil generated by field leveling of each tower leg before foundation excavation and earthwork excavated by a mechanical construction rotary drilling rig and the like are used as main measurement and calculation objects, a half-excavation and half-filling mode is adopted for construction channels, earthwork self-balancing is not calculated, and the construction efficiency is improved. Other excavation residual soil is stacked along the boundary of the construction channel, area prediction is conducted according to the situation that residual soil stacking measures are strictly executed, the residual soil with the small terrain gradient is stacked along the slope, and blocking mea</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; ELECTRIC DIGITAL DATA PROCESSING ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; PHYSICS ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20231110&amp;DB=EPODOC&amp;CC=CN&amp;NR=117033854A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20231110&amp;DB=EPODOC&amp;CC=CN&amp;NR=117033854A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>XIA LIANG</creatorcontrib><creatorcontrib>DENG JUN</creatorcontrib><creatorcontrib>ZHENG SHUO</creatorcontrib><creatorcontrib>WANG FEI</creatorcontrib><creatorcontrib>YANG XUESONG</creatorcontrib><creatorcontrib>YAN RONGHUA</creatorcontrib><creatorcontrib>HAN FEI</creatorcontrib><creatorcontrib>LIANG YIOU</creatorcontrib><creatorcontrib>XIAO YUNYING</creatorcontrib><creatorcontrib>YANG DONGXING</creatorcontrib><creatorcontrib>WANG YAN</creatorcontrib><creatorcontrib>YU HAIFENG</creatorcontrib><title>Method for predicting temporary occupied area of mechanical construction tower footing area in hilly region</title><description>The invention relates to a method for predicting the temporary occupied area of a tower footing area in mechanical construction in a hilly area, and belongs to the technical field of power construction methods. According to the technical scheme, a high-low leg tower footing of a single-side slope is used as a research object, residual soil generated by field leveling of each tower leg before foundation excavation and earthwork excavated by a mechanical construction rotary drilling rig and the like are used as main measurement and calculation objects, a half-excavation and half-filling mode is adopted for construction channels, earthwork self-balancing is not calculated, and the construction efficiency is improved. Other excavation residual soil is stacked along the boundary of the construction channel, area prediction is conducted according to the situation that residual soil stacking measures are strictly executed, the residual soil with the small terrain gradient is stacked along the slope, and blocking mea</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>ELECTRIC DIGITAL DATA PROCESSING</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>PHYSICS</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNzDEKwkAQheFtLES9w3gAwRBFWwmKjVb2YZhMsoubnWV2g-T2huABrF7zvX9p3g_OVhpoRSEqN46yCx1k7qMo6ghCNETHDaAygrTQM1kMjtADSUhZh-kiAbJ8WKeOzIFZuwDWeT-CcjeRtVm06BNvfrsy29v1Vd13HKXmFJE4cK6rZ1Gc9mV5Ph4u5T_mCyW5Qe0</recordid><startdate>20231110</startdate><enddate>20231110</enddate><creator>XIA LIANG</creator><creator>DENG JUN</creator><creator>ZHENG SHUO</creator><creator>WANG FEI</creator><creator>YANG XUESONG</creator><creator>YAN RONGHUA</creator><creator>HAN FEI</creator><creator>LIANG YIOU</creator><creator>XIAO YUNYING</creator><creator>YANG DONGXING</creator><creator>WANG YAN</creator><creator>YU HAIFENG</creator><scope>EVB</scope></search><sort><creationdate>20231110</creationdate><title>Method for predicting temporary occupied area of mechanical construction tower footing area in hilly region</title><author>XIA LIANG ; DENG JUN ; ZHENG SHUO ; WANG FEI ; YANG XUESONG ; YAN RONGHUA ; HAN FEI ; LIANG YIOU ; XIAO YUNYING ; YANG DONGXING ; WANG YAN ; YU HAIFENG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN117033854A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>ELECTRIC DIGITAL DATA PROCESSING</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>PHYSICS</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>XIA LIANG</creatorcontrib><creatorcontrib>DENG JUN</creatorcontrib><creatorcontrib>ZHENG SHUO</creatorcontrib><creatorcontrib>WANG FEI</creatorcontrib><creatorcontrib>YANG XUESONG</creatorcontrib><creatorcontrib>YAN RONGHUA</creatorcontrib><creatorcontrib>HAN FEI</creatorcontrib><creatorcontrib>LIANG YIOU</creatorcontrib><creatorcontrib>XIAO YUNYING</creatorcontrib><creatorcontrib>YANG DONGXING</creatorcontrib><creatorcontrib>WANG YAN</creatorcontrib><creatorcontrib>YU HAIFENG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>XIA LIANG</au><au>DENG JUN</au><au>ZHENG SHUO</au><au>WANG FEI</au><au>YANG XUESONG</au><au>YAN RONGHUA</au><au>HAN FEI</au><au>LIANG YIOU</au><au>XIAO YUNYING</au><au>YANG DONGXING</au><au>WANG YAN</au><au>YU HAIFENG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Method for predicting temporary occupied area of mechanical construction tower footing area in hilly region</title><date>2023-11-10</date><risdate>2023</risdate><abstract>The invention relates to a method for predicting the temporary occupied area of a tower footing area in mechanical construction in a hilly area, and belongs to the technical field of power construction methods. According to the technical scheme, a high-low leg tower footing of a single-side slope is used as a research object, residual soil generated by field leveling of each tower leg before foundation excavation and earthwork excavated by a mechanical construction rotary drilling rig and the like are used as main measurement and calculation objects, a half-excavation and half-filling mode is adopted for construction channels, earthwork self-balancing is not calculated, and the construction efficiency is improved. Other excavation residual soil is stacked along the boundary of the construction channel, area prediction is conducted according to the situation that residual soil stacking measures are strictly executed, the residual soil with the small terrain gradient is stacked along the slope, and blocking mea</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN117033854A
source esp@cenet
subjects CALCULATING
COMPUTING
COUNTING
ELECTRIC DIGITAL DATA PROCESSING
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
PHYSICS
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Method for predicting temporary occupied area of mechanical construction tower footing area in hilly region
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-02T22%3A46%3A08IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=XIA%20LIANG&rft.date=2023-11-10&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN117033854A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true