Cascade hydropower station short-term power generation scheduling method, device and equipment and storage medium
The invention relates to a cascade hydropower station short-term power generation scheduling method, device and equipment and a storage medium, and the method comprises the steps: constructing an economic water level zone control model of a power station, obtaining the scheduling constraint conditio...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to a cascade hydropower station short-term power generation scheduling method, device and equipment and a storage medium, and the method comprises the steps: constructing an economic water level zone control model of a power station, obtaining the scheduling constraint condition of the power station and the working efficiency of each unit, sorting all units according to the working efficiency, and obtaining a scheduling constraint condition of the power station; calculating the ecological flow load of the power station according to the scheduling constraint condition; the single-machine ecological flow load serves as initial output, the estimated water level of each time period is calculated gradually from the initial dispatching time period to the final dispatching time period in a horizontal pushing mode, the average output of the power station is adjusted according to the estimated water level till the final dispatching time period is ended, and the estimated water level conforms to t |
---|