Power plant water system intelligent linkage control method and system based on fault early warning

The invention discloses a power plant water system intelligent linkage control method and system based on fault early warning, and the method comprises the steps: 1), transmitting early warning information when fault equipment exists; 2) maintaining the current operation of the fault equipment, redu...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHANG MINGLI, ZHANG CHEN, PU JIANGUO, WANG TAO, GAO JINGHUI, AN ZONGWU, LI ZHAO, LIAO JUNLIN, GUO YUNFEI, HE WEIFEI, LI XIAOFEI, YAN WENCHEN, ZHANG QUAN, WU QINGYUN, LI ZHENGKUAN, TAN XIANGSHUAI, YAO ZHI, ZHAO WEI, LIN YICUN, WU GANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHANG MINGLI
ZHANG CHEN
PU JIANGUO
WANG TAO
GAO JINGHUI
AN ZONGWU
LI ZHAO
LIAO JUNLIN
GUO YUNFEI
HE WEIFEI
LI XIAOFEI
YAN WENCHEN
ZHANG QUAN
WU QINGYUN
LI ZHENGKUAN
TAN XIANGSHUAI
YAO ZHI
ZHAO WEI
LIN YICUN
WU GANG
description The invention discloses a power plant water system intelligent linkage control method and system based on fault early warning, and the method comprises the steps: 1), transmitting early warning information when fault equipment exists; 2) maintaining the current operation of the fault equipment, reducing the power to operate or switching the equipment to operate; 3) judging whether the internal fault of the system where the fault equipment is located is self-healed or not, when the internal fault of the system where the fault equipment is located cannot be self-healed, sending a linkage instruction to an upstream system and a downstream system associated with the system where the fault equipment is located, taking autonomous control measures on the fault equipment, and selecting a proper equipment operation mode; 4) after the autonomous control of the faulty equipment is finished, judging whether the fault is eliminated, and when the fault is eliminated, recovering the original operation mode of the faulty equ
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116909214A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116909214A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116909214A3</originalsourceid><addsrcrecordid>eNqNjDEKwkAQRdNYiHqH8QCCURFSSlCsxMI-jMlPsjiZDbsjIbc3hfZW_8F7_HlS3v2AQL2wGg1sE8cxGjpyahBxDSYhTl_cgEqvFrxQB2t9RazVr35yREVeqea3GIGDjNNfUKfNMpnVLBGr7y6S9eX8yK8b9L5A7LmEwor8lqbHbJvt0sNp_0_zAd7YPt8</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Power plant water system intelligent linkage control method and system based on fault early warning</title><source>esp@cenet</source><creator>ZHANG MINGLI ; ZHANG CHEN ; PU JIANGUO ; WANG TAO ; GAO JINGHUI ; AN ZONGWU ; LI ZHAO ; LIAO JUNLIN ; GUO YUNFEI ; HE WEIFEI ; LI XIAOFEI ; YAN WENCHEN ; ZHANG QUAN ; WU QINGYUN ; LI ZHENGKUAN ; TAN XIANGSHUAI ; YAO ZHI ; ZHAO WEI ; LIN YICUN ; WU GANG</creator><creatorcontrib>ZHANG MINGLI ; ZHANG CHEN ; PU JIANGUO ; WANG TAO ; GAO JINGHUI ; AN ZONGWU ; LI ZHAO ; LIAO JUNLIN ; GUO YUNFEI ; HE WEIFEI ; LI XIAOFEI ; YAN WENCHEN ; ZHANG QUAN ; WU QINGYUN ; LI ZHENGKUAN ; TAN XIANGSHUAI ; YAO ZHI ; ZHAO WEI ; LIN YICUN ; WU GANG</creatorcontrib><description>The invention discloses a power plant water system intelligent linkage control method and system based on fault early warning, and the method comprises the steps: 1), transmitting early warning information when fault equipment exists; 2) maintaining the current operation of the fault equipment, reducing the power to operate or switching the equipment to operate; 3) judging whether the internal fault of the system where the fault equipment is located is self-healed or not, when the internal fault of the system where the fault equipment is located cannot be self-healed, sending a linkage instruction to an upstream system and a downstream system associated with the system where the fault equipment is located, taking autonomous control measures on the fault equipment, and selecting a proper equipment operation mode; 4) after the autonomous control of the faulty equipment is finished, judging whether the fault is eliminated, and when the fault is eliminated, recovering the original operation mode of the faulty equ</description><language>chi ; eng</language><subject>CONTROL OR REGULATING SYSTEMS IN GENERAL ; CONTROLLING ; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS ; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS ; PHYSICS ; REGULATING</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20231020&amp;DB=EPODOC&amp;CC=CN&amp;NR=116909214A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20231020&amp;DB=EPODOC&amp;CC=CN&amp;NR=116909214A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG MINGLI</creatorcontrib><creatorcontrib>ZHANG CHEN</creatorcontrib><creatorcontrib>PU JIANGUO</creatorcontrib><creatorcontrib>WANG TAO</creatorcontrib><creatorcontrib>GAO JINGHUI</creatorcontrib><creatorcontrib>AN ZONGWU</creatorcontrib><creatorcontrib>LI ZHAO</creatorcontrib><creatorcontrib>LIAO JUNLIN</creatorcontrib><creatorcontrib>GUO YUNFEI</creatorcontrib><creatorcontrib>HE WEIFEI</creatorcontrib><creatorcontrib>LI XIAOFEI</creatorcontrib><creatorcontrib>YAN WENCHEN</creatorcontrib><creatorcontrib>ZHANG QUAN</creatorcontrib><creatorcontrib>WU QINGYUN</creatorcontrib><creatorcontrib>LI ZHENGKUAN</creatorcontrib><creatorcontrib>TAN XIANGSHUAI</creatorcontrib><creatorcontrib>YAO ZHI</creatorcontrib><creatorcontrib>ZHAO WEI</creatorcontrib><creatorcontrib>LIN YICUN</creatorcontrib><creatorcontrib>WU GANG</creatorcontrib><title>Power plant water system intelligent linkage control method and system based on fault early warning</title><description>The invention discloses a power plant water system intelligent linkage control method and system based on fault early warning, and the method comprises the steps: 1), transmitting early warning information when fault equipment exists; 2) maintaining the current operation of the fault equipment, reducing the power to operate or switching the equipment to operate; 3) judging whether the internal fault of the system where the fault equipment is located is self-healed or not, when the internal fault of the system where the fault equipment is located cannot be self-healed, sending a linkage instruction to an upstream system and a downstream system associated with the system where the fault equipment is located, taking autonomous control measures on the fault equipment, and selecting a proper equipment operation mode; 4) after the autonomous control of the faulty equipment is finished, judging whether the fault is eliminated, and when the fault is eliminated, recovering the original operation mode of the faulty equ</description><subject>CONTROL OR REGULATING SYSTEMS IN GENERAL</subject><subject>CONTROLLING</subject><subject>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</subject><subject>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</subject><subject>PHYSICS</subject><subject>REGULATING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjDEKwkAQRdNYiHqH8QCCURFSSlCsxMI-jMlPsjiZDbsjIbc3hfZW_8F7_HlS3v2AQL2wGg1sE8cxGjpyahBxDSYhTl_cgEqvFrxQB2t9RazVr35yREVeqea3GIGDjNNfUKfNMpnVLBGr7y6S9eX8yK8b9L5A7LmEwor8lqbHbJvt0sNp_0_zAd7YPt8</recordid><startdate>20231020</startdate><enddate>20231020</enddate><creator>ZHANG MINGLI</creator><creator>ZHANG CHEN</creator><creator>PU JIANGUO</creator><creator>WANG TAO</creator><creator>GAO JINGHUI</creator><creator>AN ZONGWU</creator><creator>LI ZHAO</creator><creator>LIAO JUNLIN</creator><creator>GUO YUNFEI</creator><creator>HE WEIFEI</creator><creator>LI XIAOFEI</creator><creator>YAN WENCHEN</creator><creator>ZHANG QUAN</creator><creator>WU QINGYUN</creator><creator>LI ZHENGKUAN</creator><creator>TAN XIANGSHUAI</creator><creator>YAO ZHI</creator><creator>ZHAO WEI</creator><creator>LIN YICUN</creator><creator>WU GANG</creator><scope>EVB</scope></search><sort><creationdate>20231020</creationdate><title>Power plant water system intelligent linkage control method and system based on fault early warning</title><author>ZHANG MINGLI ; ZHANG CHEN ; PU JIANGUO ; WANG TAO ; GAO JINGHUI ; AN ZONGWU ; LI ZHAO ; LIAO JUNLIN ; GUO YUNFEI ; HE WEIFEI ; LI XIAOFEI ; YAN WENCHEN ; ZHANG QUAN ; WU QINGYUN ; LI ZHENGKUAN ; TAN XIANGSHUAI ; YAO ZHI ; ZHAO WEI ; LIN YICUN ; WU GANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116909214A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>CONTROL OR REGULATING SYSTEMS IN GENERAL</topic><topic>CONTROLLING</topic><topic>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</topic><topic>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</topic><topic>PHYSICS</topic><topic>REGULATING</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG MINGLI</creatorcontrib><creatorcontrib>ZHANG CHEN</creatorcontrib><creatorcontrib>PU JIANGUO</creatorcontrib><creatorcontrib>WANG TAO</creatorcontrib><creatorcontrib>GAO JINGHUI</creatorcontrib><creatorcontrib>AN ZONGWU</creatorcontrib><creatorcontrib>LI ZHAO</creatorcontrib><creatorcontrib>LIAO JUNLIN</creatorcontrib><creatorcontrib>GUO YUNFEI</creatorcontrib><creatorcontrib>HE WEIFEI</creatorcontrib><creatorcontrib>LI XIAOFEI</creatorcontrib><creatorcontrib>YAN WENCHEN</creatorcontrib><creatorcontrib>ZHANG QUAN</creatorcontrib><creatorcontrib>WU QINGYUN</creatorcontrib><creatorcontrib>LI ZHENGKUAN</creatorcontrib><creatorcontrib>TAN XIANGSHUAI</creatorcontrib><creatorcontrib>YAO ZHI</creatorcontrib><creatorcontrib>ZHAO WEI</creatorcontrib><creatorcontrib>LIN YICUN</creatorcontrib><creatorcontrib>WU GANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG MINGLI</au><au>ZHANG CHEN</au><au>PU JIANGUO</au><au>WANG TAO</au><au>GAO JINGHUI</au><au>AN ZONGWU</au><au>LI ZHAO</au><au>LIAO JUNLIN</au><au>GUO YUNFEI</au><au>HE WEIFEI</au><au>LI XIAOFEI</au><au>YAN WENCHEN</au><au>ZHANG QUAN</au><au>WU QINGYUN</au><au>LI ZHENGKUAN</au><au>TAN XIANGSHUAI</au><au>YAO ZHI</au><au>ZHAO WEI</au><au>LIN YICUN</au><au>WU GANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Power plant water system intelligent linkage control method and system based on fault early warning</title><date>2023-10-20</date><risdate>2023</risdate><abstract>The invention discloses a power plant water system intelligent linkage control method and system based on fault early warning, and the method comprises the steps: 1), transmitting early warning information when fault equipment exists; 2) maintaining the current operation of the fault equipment, reducing the power to operate or switching the equipment to operate; 3) judging whether the internal fault of the system where the fault equipment is located is self-healed or not, when the internal fault of the system where the fault equipment is located cannot be self-healed, sending a linkage instruction to an upstream system and a downstream system associated with the system where the fault equipment is located, taking autonomous control measures on the fault equipment, and selecting a proper equipment operation mode; 4) after the autonomous control of the faulty equipment is finished, judging whether the fault is eliminated, and when the fault is eliminated, recovering the original operation mode of the faulty equ</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN116909214A
source esp@cenet
subjects CONTROL OR REGULATING SYSTEMS IN GENERAL
CONTROLLING
FUNCTIONAL ELEMENTS OF SUCH SYSTEMS
MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS
PHYSICS
REGULATING
title Power plant water system intelligent linkage control method and system based on fault early warning
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-26T21%3A56%3A01IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20MINGLI&rft.date=2023-10-20&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116909214A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true