Cover excavation top beam and temporary pile column structure for pile foundation underpinning and construction method

The invention discloses a cover excavation top beam and temporary pile column structure for pile foundation underpinning and a construction method.The cover excavation top beam and temporary pile column structure comprises a transverse supporting beam, a longitudinal supporting beam, a temporary pil...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: NIE ZIYUN, HOU JINGYU, ZHOU JITAO, WANG YIMENG, WANG MINGSHENG, GUO JIAXING, WANG LINHUI, JING JIALIANG, LI AIDONG, ZHANG CHUNLEI, ZENG JIALIANG, LI BO, ZHANG PENG, JIN XIN, ZHAO ZHITAO, GUO XIANZHAO, ZHANG JIQING, ZHANG HAOLIANG, ZHANG XIXUN, FEI RUIZHEN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator NIE ZIYUN
HOU JINGYU
ZHOU JITAO
WANG YIMENG
WANG MINGSHENG
GUO JIAXING
WANG LINHUI
JING JIALIANG
LI AIDONG
ZHANG CHUNLEI
ZENG JIALIANG
LI BO
ZHANG PENG
JIN XIN
ZHAO ZHITAO
GUO XIANZHAO
ZHANG JIQING
ZHANG HAOLIANG
ZHANG XIXUN
FEI RUIZHEN
description The invention discloses a cover excavation top beam and temporary pile column structure for pile foundation underpinning and a construction method.The cover excavation top beam and temporary pile column structure comprises a transverse supporting beam, a longitudinal supporting beam, a temporary pile column and an enclosure structure which are arranged around an existing pile foundation bearing platform structure, the existing pile foundation bearing platform structure is connected with the transverse supporting beam and the longitudinal supporting beam, and the two ends of the transverse supporting beam are connected with the enclosure structure; the two ends of the longitudinal joists are connected with the transverse joists, and the temporary piles are arranged between the existing pile foundation bearing platform structure and the enclosure structure. The invention further provides a construction method aiming at the structure, the design concept of'covering and excavation of the top beam and temporary pi
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116905551A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116905551A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116905551A3</originalsourceid><addsrcrecordid>eNqNjEsKwkAQRLNxIeod2gMIBongUoLiypX70E46OjDTPXR6gt7eTzyAqyp4VW9aDLUMpEAPhwOaFwaTBFfCCMgtGMUkivqE5AOBk5AjQ2-anWUl6ERH0knmdhS8C2nyzJ5vX4kTHh8fGsnu0s6LSYehp8UvZ8XyeLjUpxUlaahP6IjJmvpcltvduqqqcr_5Z_MCqfFGrw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Cover excavation top beam and temporary pile column structure for pile foundation underpinning and construction method</title><source>esp@cenet</source><creator>NIE ZIYUN ; HOU JINGYU ; ZHOU JITAO ; WANG YIMENG ; WANG MINGSHENG ; GUO JIAXING ; WANG LINHUI ; JING JIALIANG ; LI AIDONG ; ZHANG CHUNLEI ; ZENG JIALIANG ; LI BO ; ZHANG PENG ; JIN XIN ; ZHAO ZHITAO ; GUO XIANZHAO ; ZHANG JIQING ; ZHANG HAOLIANG ; ZHANG XIXUN ; FEI RUIZHEN</creator><creatorcontrib>NIE ZIYUN ; HOU JINGYU ; ZHOU JITAO ; WANG YIMENG ; WANG MINGSHENG ; GUO JIAXING ; WANG LINHUI ; JING JIALIANG ; LI AIDONG ; ZHANG CHUNLEI ; ZENG JIALIANG ; LI BO ; ZHANG PENG ; JIN XIN ; ZHAO ZHITAO ; GUO XIANZHAO ; ZHANG JIQING ; ZHANG HAOLIANG ; ZHANG XIXUN ; FEI RUIZHEN</creatorcontrib><description>The invention discloses a cover excavation top beam and temporary pile column structure for pile foundation underpinning and a construction method.The cover excavation top beam and temporary pile column structure comprises a transverse supporting beam, a longitudinal supporting beam, a temporary pile column and an enclosure structure which are arranged around an existing pile foundation bearing platform structure, the existing pile foundation bearing platform structure is connected with the transverse supporting beam and the longitudinal supporting beam, and the two ends of the transverse supporting beam are connected with the enclosure structure; the two ends of the longitudinal joists are connected with the transverse joists, and the temporary piles are arranged between the existing pile foundation bearing platform structure and the enclosure structure. The invention further provides a construction method aiming at the structure, the design concept of'covering and excavation of the top beam and temporary pi</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20231020&amp;DB=EPODOC&amp;CC=CN&amp;NR=116905551A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25569,76552</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20231020&amp;DB=EPODOC&amp;CC=CN&amp;NR=116905551A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>NIE ZIYUN</creatorcontrib><creatorcontrib>HOU JINGYU</creatorcontrib><creatorcontrib>ZHOU JITAO</creatorcontrib><creatorcontrib>WANG YIMENG</creatorcontrib><creatorcontrib>WANG MINGSHENG</creatorcontrib><creatorcontrib>GUO JIAXING</creatorcontrib><creatorcontrib>WANG LINHUI</creatorcontrib><creatorcontrib>JING JIALIANG</creatorcontrib><creatorcontrib>LI AIDONG</creatorcontrib><creatorcontrib>ZHANG CHUNLEI</creatorcontrib><creatorcontrib>ZENG JIALIANG</creatorcontrib><creatorcontrib>LI BO</creatorcontrib><creatorcontrib>ZHANG PENG</creatorcontrib><creatorcontrib>JIN XIN</creatorcontrib><creatorcontrib>ZHAO ZHITAO</creatorcontrib><creatorcontrib>GUO XIANZHAO</creatorcontrib><creatorcontrib>ZHANG JIQING</creatorcontrib><creatorcontrib>ZHANG HAOLIANG</creatorcontrib><creatorcontrib>ZHANG XIXUN</creatorcontrib><creatorcontrib>FEI RUIZHEN</creatorcontrib><title>Cover excavation top beam and temporary pile column structure for pile foundation underpinning and construction method</title><description>The invention discloses a cover excavation top beam and temporary pile column structure for pile foundation underpinning and a construction method.The cover excavation top beam and temporary pile column structure comprises a transverse supporting beam, a longitudinal supporting beam, a temporary pile column and an enclosure structure which are arranged around an existing pile foundation bearing platform structure, the existing pile foundation bearing platform structure is connected with the transverse supporting beam and the longitudinal supporting beam, and the two ends of the transverse supporting beam are connected with the enclosure structure; the two ends of the longitudinal joists are connected with the transverse joists, and the temporary piles are arranged between the existing pile foundation bearing platform structure and the enclosure structure. The invention further provides a construction method aiming at the structure, the design concept of'covering and excavation of the top beam and temporary pi</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjEsKwkAQRLNxIeod2gMIBongUoLiypX70E46OjDTPXR6gt7eTzyAqyp4VW9aDLUMpEAPhwOaFwaTBFfCCMgtGMUkivqE5AOBk5AjQ2-anWUl6ERH0knmdhS8C2nyzJ5vX4kTHh8fGsnu0s6LSYehp8UvZ8XyeLjUpxUlaahP6IjJmvpcltvduqqqcr_5Z_MCqfFGrw</recordid><startdate>20231020</startdate><enddate>20231020</enddate><creator>NIE ZIYUN</creator><creator>HOU JINGYU</creator><creator>ZHOU JITAO</creator><creator>WANG YIMENG</creator><creator>WANG MINGSHENG</creator><creator>GUO JIAXING</creator><creator>WANG LINHUI</creator><creator>JING JIALIANG</creator><creator>LI AIDONG</creator><creator>ZHANG CHUNLEI</creator><creator>ZENG JIALIANG</creator><creator>LI BO</creator><creator>ZHANG PENG</creator><creator>JIN XIN</creator><creator>ZHAO ZHITAO</creator><creator>GUO XIANZHAO</creator><creator>ZHANG JIQING</creator><creator>ZHANG HAOLIANG</creator><creator>ZHANG XIXUN</creator><creator>FEI RUIZHEN</creator><scope>EVB</scope></search><sort><creationdate>20231020</creationdate><title>Cover excavation top beam and temporary pile column structure for pile foundation underpinning and construction method</title><author>NIE ZIYUN ; HOU JINGYU ; ZHOU JITAO ; WANG YIMENG ; WANG MINGSHENG ; GUO JIAXING ; WANG LINHUI ; JING JIALIANG ; LI AIDONG ; ZHANG CHUNLEI ; ZENG JIALIANG ; LI BO ; ZHANG PENG ; JIN XIN ; ZHAO ZHITAO ; GUO XIANZHAO ; ZHANG JIQING ; ZHANG HAOLIANG ; ZHANG XIXUN ; FEI RUIZHEN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116905551A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>NIE ZIYUN</creatorcontrib><creatorcontrib>HOU JINGYU</creatorcontrib><creatorcontrib>ZHOU JITAO</creatorcontrib><creatorcontrib>WANG YIMENG</creatorcontrib><creatorcontrib>WANG MINGSHENG</creatorcontrib><creatorcontrib>GUO JIAXING</creatorcontrib><creatorcontrib>WANG LINHUI</creatorcontrib><creatorcontrib>JING JIALIANG</creatorcontrib><creatorcontrib>LI AIDONG</creatorcontrib><creatorcontrib>ZHANG CHUNLEI</creatorcontrib><creatorcontrib>ZENG JIALIANG</creatorcontrib><creatorcontrib>LI BO</creatorcontrib><creatorcontrib>ZHANG PENG</creatorcontrib><creatorcontrib>JIN XIN</creatorcontrib><creatorcontrib>ZHAO ZHITAO</creatorcontrib><creatorcontrib>GUO XIANZHAO</creatorcontrib><creatorcontrib>ZHANG JIQING</creatorcontrib><creatorcontrib>ZHANG HAOLIANG</creatorcontrib><creatorcontrib>ZHANG XIXUN</creatorcontrib><creatorcontrib>FEI RUIZHEN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>NIE ZIYUN</au><au>HOU JINGYU</au><au>ZHOU JITAO</au><au>WANG YIMENG</au><au>WANG MINGSHENG</au><au>GUO JIAXING</au><au>WANG LINHUI</au><au>JING JIALIANG</au><au>LI AIDONG</au><au>ZHANG CHUNLEI</au><au>ZENG JIALIANG</au><au>LI BO</au><au>ZHANG PENG</au><au>JIN XIN</au><au>ZHAO ZHITAO</au><au>GUO XIANZHAO</au><au>ZHANG JIQING</au><au>ZHANG HAOLIANG</au><au>ZHANG XIXUN</au><au>FEI RUIZHEN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Cover excavation top beam and temporary pile column structure for pile foundation underpinning and construction method</title><date>2023-10-20</date><risdate>2023</risdate><abstract>The invention discloses a cover excavation top beam and temporary pile column structure for pile foundation underpinning and a construction method.The cover excavation top beam and temporary pile column structure comprises a transverse supporting beam, a longitudinal supporting beam, a temporary pile column and an enclosure structure which are arranged around an existing pile foundation bearing platform structure, the existing pile foundation bearing platform structure is connected with the transverse supporting beam and the longitudinal supporting beam, and the two ends of the transverse supporting beam are connected with the enclosure structure; the two ends of the longitudinal joists are connected with the transverse joists, and the temporary piles are arranged between the existing pile foundation bearing platform structure and the enclosure structure. The invention further provides a construction method aiming at the structure, the design concept of'covering and excavation of the top beam and temporary pi</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN116905551A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Cover excavation top beam and temporary pile column structure for pile foundation underpinning and construction method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-13T07%3A53%3A11IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=NIE%20ZIYUN&rft.date=2023-10-20&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116905551A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true