Construction method applied to assembly type precast concrete beam and special construction equipment thereof
The invention discloses a construction method applied to assembly type precast concrete beams and special construction equipment thereof. The construction method comprises the following steps that the precast concrete beams are transferred to a preset position of a construction floor after being man...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | JIANG KAIXUAN TAN HUIWEN KANG SHAOBO DU HE YANG XIUCHUAN LIU JIEPENG LI JIANG |
description | The invention discloses a construction method applied to assembly type precast concrete beams and special construction equipment thereof. The construction method comprises the following steps that the precast concrete beams are transferred to a preset position of a construction floor after being manufactured in a standardized mode in a unified mode through a prefabrication factory, and the precast concrete beams are stacked on sole timbers in order; the special construction equipment is transferred to a construction floor; the lifting mechanism and the lifting mechanism are used for lifting the beam body; a movable limiting plate is controlled to be tightened so as to limit and fix the beam body, and the orientation of the special construction equipment is preliminarily adjusted according to the position of an overhanging bracket on the supporting column; the beam body continues to be lifted to the preset elevation through the lifting mechanism; the horizontal position and the pitching angle of the beam body |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116838116A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116838116A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116838116A3</originalsourceid><addsrcrecordid>eNqNjLsKwkAQRdNYiPoP4wdYhICklaBYWdmHyeYGF_Yx7kyK_L0Kgq3NPcU53HUVu5zUyuzM50QR9sgjsUjwGMkysSriEBayRUBS4FiNXE6uwEADOBKnkVTgPIeP-d3hOXuJSEb2QEGettVq4qDYfbmp9pfzvbseILmHCjskWN_d6vrYNu17T80_zQsGAUNI</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method applied to assembly type precast concrete beam and special construction equipment thereof</title><source>esp@cenet</source><creator>JIANG KAIXUAN ; TAN HUIWEN ; KANG SHAOBO ; DU HE ; YANG XIUCHUAN ; LIU JIEPENG ; LI JIANG</creator><creatorcontrib>JIANG KAIXUAN ; TAN HUIWEN ; KANG SHAOBO ; DU HE ; YANG XIUCHUAN ; LIU JIEPENG ; LI JIANG</creatorcontrib><description>The invention discloses a construction method applied to assembly type precast concrete beams and special construction equipment thereof. The construction method comprises the following steps that the precast concrete beams are transferred to a preset position of a construction floor after being manufactured in a standardized mode in a unified mode through a prefabrication factory, and the precast concrete beams are stacked on sole timbers in order; the special construction equipment is transferred to a construction floor; the lifting mechanism and the lifting mechanism are used for lifting the beam body; a movable limiting plate is controlled to be tightened so as to limit and fix the beam body, and the orientation of the special construction equipment is preliminarily adjusted according to the position of an overhanging bracket on the supporting column; the beam body continues to be lifted to the preset elevation through the lifting mechanism; the horizontal position and the pitching angle of the beam body</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20231003&DB=EPODOC&CC=CN&NR=116838116A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20231003&DB=EPODOC&CC=CN&NR=116838116A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>JIANG KAIXUAN</creatorcontrib><creatorcontrib>TAN HUIWEN</creatorcontrib><creatorcontrib>KANG SHAOBO</creatorcontrib><creatorcontrib>DU HE</creatorcontrib><creatorcontrib>YANG XIUCHUAN</creatorcontrib><creatorcontrib>LIU JIEPENG</creatorcontrib><creatorcontrib>LI JIANG</creatorcontrib><title>Construction method applied to assembly type precast concrete beam and special construction equipment thereof</title><description>The invention discloses a construction method applied to assembly type precast concrete beams and special construction equipment thereof. The construction method comprises the following steps that the precast concrete beams are transferred to a preset position of a construction floor after being manufactured in a standardized mode in a unified mode through a prefabrication factory, and the precast concrete beams are stacked on sole timbers in order; the special construction equipment is transferred to a construction floor; the lifting mechanism and the lifting mechanism are used for lifting the beam body; a movable limiting plate is controlled to be tightened so as to limit and fix the beam body, and the orientation of the special construction equipment is preliminarily adjusted according to the position of an overhanging bracket on the supporting column; the beam body continues to be lifted to the preset elevation through the lifting mechanism; the horizontal position and the pitching angle of the beam body</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjLsKwkAQRdNYiPoP4wdYhICklaBYWdmHyeYGF_Yx7kyK_L0Kgq3NPcU53HUVu5zUyuzM50QR9sgjsUjwGMkysSriEBayRUBS4FiNXE6uwEADOBKnkVTgPIeP-d3hOXuJSEb2QEGettVq4qDYfbmp9pfzvbseILmHCjskWN_d6vrYNu17T80_zQsGAUNI</recordid><startdate>20231003</startdate><enddate>20231003</enddate><creator>JIANG KAIXUAN</creator><creator>TAN HUIWEN</creator><creator>KANG SHAOBO</creator><creator>DU HE</creator><creator>YANG XIUCHUAN</creator><creator>LIU JIEPENG</creator><creator>LI JIANG</creator><scope>EVB</scope></search><sort><creationdate>20231003</creationdate><title>Construction method applied to assembly type precast concrete beam and special construction equipment thereof</title><author>JIANG KAIXUAN ; TAN HUIWEN ; KANG SHAOBO ; DU HE ; YANG XIUCHUAN ; LIU JIEPENG ; LI JIANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116838116A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><toplevel>online_resources</toplevel><creatorcontrib>JIANG KAIXUAN</creatorcontrib><creatorcontrib>TAN HUIWEN</creatorcontrib><creatorcontrib>KANG SHAOBO</creatorcontrib><creatorcontrib>DU HE</creatorcontrib><creatorcontrib>YANG XIUCHUAN</creatorcontrib><creatorcontrib>LIU JIEPENG</creatorcontrib><creatorcontrib>LI JIANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>JIANG KAIXUAN</au><au>TAN HUIWEN</au><au>KANG SHAOBO</au><au>DU HE</au><au>YANG XIUCHUAN</au><au>LIU JIEPENG</au><au>LI JIANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method applied to assembly type precast concrete beam and special construction equipment thereof</title><date>2023-10-03</date><risdate>2023</risdate><abstract>The invention discloses a construction method applied to assembly type precast concrete beams and special construction equipment thereof. The construction method comprises the following steps that the precast concrete beams are transferred to a preset position of a construction floor after being manufactured in a standardized mode in a unified mode through a prefabrication factory, and the precast concrete beams are stacked on sole timbers in order; the special construction equipment is transferred to a construction floor; the lifting mechanism and the lifting mechanism are used for lifting the beam body; a movable limiting plate is controlled to be tightened so as to limit and fix the beam body, and the orientation of the special construction equipment is preliminarily adjusted according to the position of an overhanging bracket on the supporting column; the beam body continues to be lifted to the preset elevation through the lifting mechanism; the horizontal position and the pitching angle of the beam body</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN116838116A |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE FIXED CONSTRUCTIONS FORMS HANDLING BUILDING MATERIALS ON THE SITE REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SHUTTERING |
title | Construction method applied to assembly type precast concrete beam and special construction equipment thereof |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-24T21%3A54%3A11IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=JIANG%20KAIXUAN&rft.date=2023-10-03&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116838116A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |