Column jacking deviation correction construction technology
The invention relates to a column body jacking deviation rectifying construction technology. The technology comprises the steps that s1, a terrace on the peripheral side of a main column body is chiseled away and hollowed out; s2, a foundation platform is poured on the outer wall of the root of the...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | CHEN QIANRAN PAN JINGBIN CHEN WEIJIAN LIN QIHUI CHEN SHENG |
description | The invention relates to a column body jacking deviation rectifying construction technology. The technology comprises the steps that s1, a terrace on the peripheral side of a main column body is chiseled away and hollowed out; s2, a foundation platform is poured on the outer wall of the root of the main column body for forming; s3, a newly-poured counter-force platform is poured on the peripheral side of the main column body for forming; s4, the area, located between the foundation platform and the newly-poured counter-force platform, of the main column body is cut off and chiseled away, and the main column body is divided into an upper column body and a lower column body; s5, a jacking driving piece is installed between the foundation platform and the newly-poured counter-force platform; s6, a jacking driving piece is driven to jack the newly poured counter-force platform and the upper column body; s7, a steel wedge is added between the foundation platform and the newly-poured counter-force platform to serve |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116815836A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116815836A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116815836A3</originalsourceid><addsrcrecordid>eNrjZLB2zs8pzc1TyEpMzs7MS1dISS3LTCzJzM9TSM4vKkpNhjLzikuKSiGcktTkjLz8nPz0Sh4G1rTEnOJUXijNzaDo5hri7KGbWpAfn1pckJicmpdaEu_sZ2hoZmFoamFs5mhMjBoAGkQwdw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Column jacking deviation correction construction technology</title><source>esp@cenet</source><creator>CHEN QIANRAN ; PAN JINGBIN ; CHEN WEIJIAN ; LIN QIHUI ; CHEN SHENG</creator><creatorcontrib>CHEN QIANRAN ; PAN JINGBIN ; CHEN WEIJIAN ; LIN QIHUI ; CHEN SHENG</creatorcontrib><description>The invention relates to a column body jacking deviation rectifying construction technology. The technology comprises the steps that s1, a terrace on the peripheral side of a main column body is chiseled away and hollowed out; s2, a foundation platform is poured on the outer wall of the root of the main column body for forming; s3, a newly-poured counter-force platform is poured on the peripheral side of the main column body for forming; s4, the area, located between the foundation platform and the newly-poured counter-force platform, of the main column body is cut off and chiseled away, and the main column body is divided into an upper column body and a lower column body; s5, a jacking driving piece is installed between the foundation platform and the newly-poured counter-force platform; s6, a jacking driving piece is driven to jack the newly poured counter-force platform and the upper column body; s7, a steel wedge is added between the foundation platform and the newly-poured counter-force platform to serve</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FORMS ; FOUNDATIONS ; HANDLING BUILDING MATERIALS ON THE SITE ; HYDRAULIC ENGINEERING ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230929&DB=EPODOC&CC=CN&NR=116815836A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25555,76308</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230929&DB=EPODOC&CC=CN&NR=116815836A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHEN QIANRAN</creatorcontrib><creatorcontrib>PAN JINGBIN</creatorcontrib><creatorcontrib>CHEN WEIJIAN</creatorcontrib><creatorcontrib>LIN QIHUI</creatorcontrib><creatorcontrib>CHEN SHENG</creatorcontrib><title>Column jacking deviation correction construction technology</title><description>The invention relates to a column body jacking deviation rectifying construction technology. The technology comprises the steps that s1, a terrace on the peripheral side of a main column body is chiseled away and hollowed out; s2, a foundation platform is poured on the outer wall of the root of the main column body for forming; s3, a newly-poured counter-force platform is poured on the peripheral side of the main column body for forming; s4, the area, located between the foundation platform and the newly-poured counter-force platform, of the main column body is cut off and chiseled away, and the main column body is divided into an upper column body and a lower column body; s5, a jacking driving piece is installed between the foundation platform and the newly-poured counter-force platform; s6, a jacking driving piece is driven to jack the newly poured counter-force platform and the upper column body; s7, a steel wedge is added between the foundation platform and the newly-poured counter-force platform to serve</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>FOUNDATIONS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>HYDRAULIC ENGINEERING</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLB2zs8pzc1TyEpMzs7MS1dISS3LTCzJzM9TSM4vKkpNhjLzikuKSiGcktTkjLz8nPz0Sh4G1rTEnOJUXijNzaDo5hri7KGbWpAfn1pckJicmpdaEu_sZ2hoZmFoamFs5mhMjBoAGkQwdw</recordid><startdate>20230929</startdate><enddate>20230929</enddate><creator>CHEN QIANRAN</creator><creator>PAN JINGBIN</creator><creator>CHEN WEIJIAN</creator><creator>LIN QIHUI</creator><creator>CHEN SHENG</creator><scope>EVB</scope></search><sort><creationdate>20230929</creationdate><title>Column jacking deviation correction construction technology</title><author>CHEN QIANRAN ; PAN JINGBIN ; CHEN WEIJIAN ; LIN QIHUI ; CHEN SHENG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116815836A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>FOUNDATIONS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>HYDRAULIC ENGINEERING</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>CHEN QIANRAN</creatorcontrib><creatorcontrib>PAN JINGBIN</creatorcontrib><creatorcontrib>CHEN WEIJIAN</creatorcontrib><creatorcontrib>LIN QIHUI</creatorcontrib><creatorcontrib>CHEN SHENG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHEN QIANRAN</au><au>PAN JINGBIN</au><au>CHEN WEIJIAN</au><au>LIN QIHUI</au><au>CHEN SHENG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Column jacking deviation correction construction technology</title><date>2023-09-29</date><risdate>2023</risdate><abstract>The invention relates to a column body jacking deviation rectifying construction technology. The technology comprises the steps that s1, a terrace on the peripheral side of a main column body is chiseled away and hollowed out; s2, a foundation platform is poured on the outer wall of the root of the main column body for forming; s3, a newly-poured counter-force platform is poured on the peripheral side of the main column body for forming; s4, the area, located between the foundation platform and the newly-poured counter-force platform, of the main column body is cut off and chiseled away, and the main column body is divided into an upper column body and a lower column body; s5, a jacking driving piece is installed between the foundation platform and the newly-poured counter-force platform; s6, a jacking driving piece is driven to jack the newly poured counter-force platform and the upper column body; s7, a steel wedge is added between the foundation platform and the newly-poured counter-force platform to serve</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN116815836A |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FORMS FOUNDATIONS HANDLING BUILDING MATERIALS ON THE SITE HYDRAULIC ENGINEERING REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SHUTTERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Column jacking deviation correction construction technology |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-15T00%3A03%3A05IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHEN%20QIANRAN&rft.date=2023-09-29&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116815836A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |