Temporary reinforcing method for steel truss girder sections

The invention discloses a temporary reinforcing method of a steel truss girder segment, and relates to the technical field of temporary reinforcing of the steel truss girder segment, and the temporary reinforcing method comprises the following steps: S1, drawing up a supporting point of the steel tr...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHEN MING, ZOU MINYONG, WANG FAN, WANG XIAOPENG, CAI LUAN, PENG ZUI, MANDA TAMOTSU, WANG ZHONGBIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator CHEN MING
ZOU MINYONG
WANG FAN
WANG XIAOPENG
CAI LUAN
PENG ZUI
MANDA TAMOTSU
WANG ZHONGBIN
description The invention discloses a temporary reinforcing method of a steel truss girder segment, and relates to the technical field of temporary reinforcing of the steel truss girder segment, and the temporary reinforcing method comprises the following steps: S1, drawing up a supporting point of the steel truss girder segment in a construction stage; s2, whether the steel truss girder sections need to be reinforced or not is judged; s3, selecting a double-side reinforcing scheme or a single-side reinforcing scheme; s41, a first reinforcing piece or a second reinforcing piece is additionally arranged according to the pull rod design, and a third reinforcing piece is additionally arranged according to the pull-press rod design; s42, additionally arranging a first reinforcing member and a second reinforcing member according to the design of the pull rod, and optionally additionally arranging a third reinforcing member according to the design of the pull rod; s5, judging whether the stress and deformation of the steel tru
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116732909A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116732909A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116732909A3</originalsourceid><addsrcrecordid>eNrjZLAJSc0tyC9KLKpUKErNzEvLL0rOzEtXyE0tychPUQByFYpLUlNzFEqKSouLFdIzi1JSgUKpySWZ-XnFPAysaYk5xam8UJqbQdHNNcTZQze1ID8-tbggMTk1L7Uk3tnP0NDM3NjI0sDS0ZgYNQAzUTBz</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Temporary reinforcing method for steel truss girder sections</title><source>esp@cenet</source><creator>CHEN MING ; ZOU MINYONG ; WANG FAN ; WANG XIAOPENG ; CAI LUAN ; PENG ZUI ; MANDA TAMOTSU ; WANG ZHONGBIN</creator><creatorcontrib>CHEN MING ; ZOU MINYONG ; WANG FAN ; WANG XIAOPENG ; CAI LUAN ; PENG ZUI ; MANDA TAMOTSU ; WANG ZHONGBIN</creatorcontrib><description>The invention discloses a temporary reinforcing method of a steel truss girder segment, and relates to the technical field of temporary reinforcing of the steel truss girder segment, and the temporary reinforcing method comprises the following steps: S1, drawing up a supporting point of the steel truss girder segment in a construction stage; s2, whether the steel truss girder sections need to be reinforced or not is judged; s3, selecting a double-side reinforcing scheme or a single-side reinforcing scheme; s41, a first reinforcing piece or a second reinforcing piece is additionally arranged according to the pull rod design, and a third reinforcing piece is additionally arranged according to the pull-press rod design; s42, additionally arranging a first reinforcing member and a second reinforcing member according to the design of the pull rod, and optionally additionally arranging a third reinforcing member according to the design of the pull rod; s5, judging whether the stress and deformation of the steel tru</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230912&amp;DB=EPODOC&amp;CC=CN&amp;NR=116732909A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230912&amp;DB=EPODOC&amp;CC=CN&amp;NR=116732909A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHEN MING</creatorcontrib><creatorcontrib>ZOU MINYONG</creatorcontrib><creatorcontrib>WANG FAN</creatorcontrib><creatorcontrib>WANG XIAOPENG</creatorcontrib><creatorcontrib>CAI LUAN</creatorcontrib><creatorcontrib>PENG ZUI</creatorcontrib><creatorcontrib>MANDA TAMOTSU</creatorcontrib><creatorcontrib>WANG ZHONGBIN</creatorcontrib><title>Temporary reinforcing method for steel truss girder sections</title><description>The invention discloses a temporary reinforcing method of a steel truss girder segment, and relates to the technical field of temporary reinforcing of the steel truss girder segment, and the temporary reinforcing method comprises the following steps: S1, drawing up a supporting point of the steel truss girder segment in a construction stage; s2, whether the steel truss girder sections need to be reinforced or not is judged; s3, selecting a double-side reinforcing scheme or a single-side reinforcing scheme; s41, a first reinforcing piece or a second reinforcing piece is additionally arranged according to the pull rod design, and a third reinforcing piece is additionally arranged according to the pull-press rod design; s42, additionally arranging a first reinforcing member and a second reinforcing member according to the design of the pull rod, and optionally additionally arranging a third reinforcing member according to the design of the pull rod; s5, judging whether the stress and deformation of the steel tru</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLAJSc0tyC9KLKpUKErNzEvLL0rOzEtXyE0tychPUQByFYpLUlNzFEqKSouLFdIzi1JSgUKpySWZ-XnFPAysaYk5xam8UJqbQdHNNcTZQze1ID8-tbggMTk1L7Uk3tnP0NDM3NjI0sDS0ZgYNQAzUTBz</recordid><startdate>20230912</startdate><enddate>20230912</enddate><creator>CHEN MING</creator><creator>ZOU MINYONG</creator><creator>WANG FAN</creator><creator>WANG XIAOPENG</creator><creator>CAI LUAN</creator><creator>PENG ZUI</creator><creator>MANDA TAMOTSU</creator><creator>WANG ZHONGBIN</creator><scope>EVB</scope></search><sort><creationdate>20230912</creationdate><title>Temporary reinforcing method for steel truss girder sections</title><author>CHEN MING ; ZOU MINYONG ; WANG FAN ; WANG XIAOPENG ; CAI LUAN ; PENG ZUI ; MANDA TAMOTSU ; WANG ZHONGBIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116732909A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>CHEN MING</creatorcontrib><creatorcontrib>ZOU MINYONG</creatorcontrib><creatorcontrib>WANG FAN</creatorcontrib><creatorcontrib>WANG XIAOPENG</creatorcontrib><creatorcontrib>CAI LUAN</creatorcontrib><creatorcontrib>PENG ZUI</creatorcontrib><creatorcontrib>MANDA TAMOTSU</creatorcontrib><creatorcontrib>WANG ZHONGBIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHEN MING</au><au>ZOU MINYONG</au><au>WANG FAN</au><au>WANG XIAOPENG</au><au>CAI LUAN</au><au>PENG ZUI</au><au>MANDA TAMOTSU</au><au>WANG ZHONGBIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Temporary reinforcing method for steel truss girder sections</title><date>2023-09-12</date><risdate>2023</risdate><abstract>The invention discloses a temporary reinforcing method of a steel truss girder segment, and relates to the technical field of temporary reinforcing of the steel truss girder segment, and the temporary reinforcing method comprises the following steps: S1, drawing up a supporting point of the steel truss girder segment in a construction stage; s2, whether the steel truss girder sections need to be reinforced or not is judged; s3, selecting a double-side reinforcing scheme or a single-side reinforcing scheme; s41, a first reinforcing piece or a second reinforcing piece is additionally arranged according to the pull rod design, and a third reinforcing piece is additionally arranged according to the pull-press rod design; s42, additionally arranging a first reinforcing member and a second reinforcing member according to the design of the pull rod, and optionally additionally arranging a third reinforcing member according to the design of the pull rod; s5, judging whether the stress and deformation of the steel tru</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN116732909A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Temporary reinforcing method for steel truss girder sections
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-01T20%3A29%3A04IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHEN%20MING&rft.date=2023-09-12&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116732909A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true