Prefabricated road plate on construction site and manufacturing method thereof

The invention provides a construction site prefabricated road plate which comprises a plate body, the left side of the plate body is provided with a drainage area in the length direction of the plate body, the drainage area comprises a groove body, the inner bottom of the groove body is provided wit...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHU WEIXIN, CHEN GANG, ZHANG SHENGKAI, ZHANG SHAOFEI, DING SUDONG, ZENG JINGWEI, XIE DONGZHOU, SHI SHUHANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHU WEIXIN
CHEN GANG
ZHANG SHENGKAI
ZHANG SHAOFEI
DING SUDONG
ZENG JINGWEI
XIE DONGZHOU
SHI SHUHANG
description The invention provides a construction site prefabricated road plate which comprises a plate body, the left side of the plate body is provided with a drainage area in the length direction of the plate body, the drainage area comprises a groove body, the inner bottom of the groove body is provided with a plurality of pre-buried perforated collecting pipes, and the upper ends of the pre-buried perforated collecting pipes are provided with gravel filtering layers. A planting soil surface layer is arranged at the upper end of the gravel filtering layer, the pre-buried perforated collecting pipe is connected with a backwashing pipe, and the outer end of the backwashing pipe extends to the position above the tank body and is provided with a spraying opening. The temporary road level and the temporary drainage efficiency of the construction site can be remarkably improved. 本发明提供一种施工现场预制道路板,包括板本体,所述板本体的左侧沿其长度方向设有排水区,所述排水区包括槽体,所述槽体的内底部设有若干预埋穿孔收集管,所述预埋穿孔收集管的上端设有碎石过滤层,所述碎石过滤层的上端设有种植土面层,所述预埋穿孔收集管与反冲洗管相连接,所述反冲洗管的外端延伸至所述槽体的
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116695516A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116695516A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116695516A3</originalsourceid><addsrcrecordid>eNqNijEOwjAMRbMwIOAO5gAMFWokRlSBmCoG9sokDo3UOpHj3J8MHIDpv_f0t2Z8CgV8S3So5EESeshLY0gMLnFRqU5jkxJbRPawIteATqtE_sBKOicPOpNQCnuzCbgUOvx2Z47322t4nCiniUpGR0w6DWPXWXvp-85ez_98vlWPNx8</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Prefabricated road plate on construction site and manufacturing method thereof</title><source>esp@cenet</source><creator>ZHU WEIXIN ; CHEN GANG ; ZHANG SHENGKAI ; ZHANG SHAOFEI ; DING SUDONG ; ZENG JINGWEI ; XIE DONGZHOU ; SHI SHUHANG</creator><creatorcontrib>ZHU WEIXIN ; CHEN GANG ; ZHANG SHENGKAI ; ZHANG SHAOFEI ; DING SUDONG ; ZENG JINGWEI ; XIE DONGZHOU ; SHI SHUHANG</creatorcontrib><description>The invention provides a construction site prefabricated road plate which comprises a plate body, the left side of the plate body is provided with a drainage area in the length direction of the plate body, the drainage area comprises a groove body, the inner bottom of the groove body is provided with a plurality of pre-buried perforated collecting pipes, and the upper ends of the pre-buried perforated collecting pipes are provided with gravel filtering layers. A planting soil surface layer is arranged at the upper end of the gravel filtering layer, the pre-buried perforated collecting pipe is connected with a backwashing pipe, and the outer end of the backwashing pipe extends to the position above the tank body and is provided with a spraying opening. The temporary road level and the temporary drainage efficiency of the construction site can be remarkably improved. 本发明提供一种施工现场预制道路板,包括板本体,所述板本体的左侧沿其长度方向设有排水区,所述排水区包括槽体,所述槽体的内底部设有若干预埋穿孔收集管,所述预埋穿孔收集管的上端设有碎石过滤层,所述碎石过滤层的上端设有种植土面层,所述预埋穿孔收集管与反冲洗管相连接,所述反冲洗管的外端延伸至所述槽体的</description><language>chi ; eng</language><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE ; FIXED CONSTRUCTIONS ; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR ; PERFORMING OPERATIONS ; PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL ; SEPARATION ; SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG, OR MIXTURESCONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER ; TRANSPORTING ; WORKING CEMENT, CLAY, OR STONE</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230905&amp;DB=EPODOC&amp;CC=CN&amp;NR=116695516A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230905&amp;DB=EPODOC&amp;CC=CN&amp;NR=116695516A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHU WEIXIN</creatorcontrib><creatorcontrib>CHEN GANG</creatorcontrib><creatorcontrib>ZHANG SHENGKAI</creatorcontrib><creatorcontrib>ZHANG SHAOFEI</creatorcontrib><creatorcontrib>DING SUDONG</creatorcontrib><creatorcontrib>ZENG JINGWEI</creatorcontrib><creatorcontrib>XIE DONGZHOU</creatorcontrib><creatorcontrib>SHI SHUHANG</creatorcontrib><title>Prefabricated road plate on construction site and manufacturing method thereof</title><description>The invention provides a construction site prefabricated road plate which comprises a plate body, the left side of the plate body is provided with a drainage area in the length direction of the plate body, the drainage area comprises a groove body, the inner bottom of the groove body is provided with a plurality of pre-buried perforated collecting pipes, and the upper ends of the pre-buried perforated collecting pipes are provided with gravel filtering layers. A planting soil surface layer is arranged at the upper end of the gravel filtering layer, the pre-buried perforated collecting pipe is connected with a backwashing pipe, and the outer end of the backwashing pipe extends to the position above the tank body and is provided with a spraying opening. The temporary road level and the temporary drainage efficiency of the construction site can be remarkably improved. 本发明提供一种施工现场预制道路板,包括板本体,所述板本体的左侧沿其长度方向设有排水区,所述排水区包括槽体,所述槽体的内底部设有若干预埋穿孔收集管,所述预埋穿孔收集管的上端设有碎石过滤层,所述碎石过滤层的上端设有种植土面层,所述预埋穿孔收集管与反冲洗管相连接,所述反冲洗管的外端延伸至所述槽体的</description><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><subject>PERFORMING OPERATIONS</subject><subject>PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL</subject><subject>SEPARATION</subject><subject>SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG, OR MIXTURESCONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER</subject><subject>TRANSPORTING</subject><subject>WORKING CEMENT, CLAY, OR STONE</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNijEOwjAMRbMwIOAO5gAMFWokRlSBmCoG9sokDo3UOpHj3J8MHIDpv_f0t2Z8CgV8S3So5EESeshLY0gMLnFRqU5jkxJbRPawIteATqtE_sBKOicPOpNQCnuzCbgUOvx2Z47322t4nCiniUpGR0w6DWPXWXvp-85ez_98vlWPNx8</recordid><startdate>20230905</startdate><enddate>20230905</enddate><creator>ZHU WEIXIN</creator><creator>CHEN GANG</creator><creator>ZHANG SHENGKAI</creator><creator>ZHANG SHAOFEI</creator><creator>DING SUDONG</creator><creator>ZENG JINGWEI</creator><creator>XIE DONGZHOU</creator><creator>SHI SHUHANG</creator><scope>EVB</scope></search><sort><creationdate>20230905</creationdate><title>Prefabricated road plate on construction site and manufacturing method thereof</title><author>ZHU WEIXIN ; CHEN GANG ; ZHANG SHENGKAI ; ZHANG SHAOFEI ; DING SUDONG ; ZENG JINGWEI ; XIE DONGZHOU ; SHI SHUHANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116695516A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</topic><topic>PERFORMING OPERATIONS</topic><topic>PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL</topic><topic>SEPARATION</topic><topic>SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG, OR MIXTURESCONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER</topic><topic>TRANSPORTING</topic><topic>WORKING CEMENT, CLAY, OR STONE</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHU WEIXIN</creatorcontrib><creatorcontrib>CHEN GANG</creatorcontrib><creatorcontrib>ZHANG SHENGKAI</creatorcontrib><creatorcontrib>ZHANG SHAOFEI</creatorcontrib><creatorcontrib>DING SUDONG</creatorcontrib><creatorcontrib>ZENG JINGWEI</creatorcontrib><creatorcontrib>XIE DONGZHOU</creatorcontrib><creatorcontrib>SHI SHUHANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHU WEIXIN</au><au>CHEN GANG</au><au>ZHANG SHENGKAI</au><au>ZHANG SHAOFEI</au><au>DING SUDONG</au><au>ZENG JINGWEI</au><au>XIE DONGZHOU</au><au>SHI SHUHANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Prefabricated road plate on construction site and manufacturing method thereof</title><date>2023-09-05</date><risdate>2023</risdate><abstract>The invention provides a construction site prefabricated road plate which comprises a plate body, the left side of the plate body is provided with a drainage area in the length direction of the plate body, the drainage area comprises a groove body, the inner bottom of the groove body is provided with a plurality of pre-buried perforated collecting pipes, and the upper ends of the pre-buried perforated collecting pipes are provided with gravel filtering layers. A planting soil surface layer is arranged at the upper end of the gravel filtering layer, the pre-buried perforated collecting pipe is connected with a backwashing pipe, and the outer end of the backwashing pipe extends to the position above the tank body and is provided with a spraying opening. The temporary road level and the temporary drainage efficiency of the construction site can be remarkably improved. 本发明提供一种施工现场预制道路板,包括板本体,所述板本体的左侧沿其长度方向设有排水区,所述排水区包括槽体,所述槽体的内底部设有若干预埋穿孔收集管,所述预埋穿孔收集管的上端设有碎石过滤层,所述碎石过滤层的上端设有种植土面层,所述预埋穿孔收集管与反冲洗管相连接,所述反冲洗管的外端延伸至所述槽体的</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN116695516A
source esp@cenet
subjects CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE
FIXED CONSTRUCTIONS
MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
PERFORMING OPERATIONS
PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
SEPARATION
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG, OR MIXTURESCONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
TRANSPORTING
WORKING CEMENT, CLAY, OR STONE
title Prefabricated road plate on construction site and manufacturing method thereof
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-02T12%3A27%3A17IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHU%20WEIXIN&rft.date=2023-09-05&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116695516A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true