Data access management method and system for new energy equipment

The invention provides a data access management method and system for new energy equipment, which can solve the problem of slow data access response caused by explosive increase of data volume along with continuous access of the new energy equipment, and comprises the following steps: acquiring a re...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG WEI, XIANG TONGWEI, HUANG LIZHE, WANG PENG, CAO JING, TAN GUONING, LIU MEICEN, BAO ZICHEN, DU CHUANG, YU MIAO, LIU ZHENJIE, YE LIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WANG WEI
XIANG TONGWEI
HUANG LIZHE
WANG PENG
CAO JING
TAN GUONING
LIU MEICEN
BAO ZICHEN
DU CHUANG
YU MIAO
LIU ZHENJIE
YE LIN
description The invention provides a data access management method and system for new energy equipment, which can solve the problem of slow data access response caused by explosive increase of data volume along with continuous access of the new energy equipment, and comprises the following steps: acquiring a request record in a data access process, and storing to obtain historical request data; constructing a rule analysis model based on a deep learning algorithm, training the rule analysis model through historical request data, and optimizing model parameters; aggregation operation is carried out on data generated in the operation process of the new energy equipment through the trained rule analysis model, different aggregation data sets are generated, and the aggregation data sets and the original data sets are stored in a partitioned mode; and analyzing newly accessed access request data through the trained rule analysis model, if the access pre-aggregation data condition is met, routing the access request to the corr
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116662333A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116662333A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116662333A3</originalsourceid><addsrcrecordid>eNrjZHB0SSxJVEhMTk4tLlbITcxLTE_NTc0rUchNLcnIT1FIzEtRKK4sLknNVUjLL1LISy1XSM1LLUqvVEgtLM0sACnlYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyUAdJfHOfoaGZmZmRsbGxo7GxKgBAPHIMZs</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Data access management method and system for new energy equipment</title><source>esp@cenet</source><creator>WANG WEI ; XIANG TONGWEI ; HUANG LIZHE ; WANG PENG ; CAO JING ; TAN GUONING ; LIU MEICEN ; BAO ZICHEN ; DU CHUANG ; YU MIAO ; LIU ZHENJIE ; YE LIN</creator><creatorcontrib>WANG WEI ; XIANG TONGWEI ; HUANG LIZHE ; WANG PENG ; CAO JING ; TAN GUONING ; LIU MEICEN ; BAO ZICHEN ; DU CHUANG ; YU MIAO ; LIU ZHENJIE ; YE LIN</creatorcontrib><description>The invention provides a data access management method and system for new energy equipment, which can solve the problem of slow data access response caused by explosive increase of data volume along with continuous access of the new energy equipment, and comprises the following steps: acquiring a request record in a data access process, and storing to obtain historical request data; constructing a rule analysis model based on a deep learning algorithm, training the rule analysis model through historical request data, and optimizing model parameters; aggregation operation is carried out on data generated in the operation process of the new energy equipment through the trained rule analysis model, different aggregation data sets are generated, and the aggregation data sets and the original data sets are stored in a partitioned mode; and analyzing newly accessed access request data through the trained rule analysis model, if the access pre-aggregation data condition is met, routing the access request to the corr</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; ELECTRIC DIGITAL DATA PROCESSING ; PHYSICS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230829&amp;DB=EPODOC&amp;CC=CN&amp;NR=116662333A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230829&amp;DB=EPODOC&amp;CC=CN&amp;NR=116662333A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG WEI</creatorcontrib><creatorcontrib>XIANG TONGWEI</creatorcontrib><creatorcontrib>HUANG LIZHE</creatorcontrib><creatorcontrib>WANG PENG</creatorcontrib><creatorcontrib>CAO JING</creatorcontrib><creatorcontrib>TAN GUONING</creatorcontrib><creatorcontrib>LIU MEICEN</creatorcontrib><creatorcontrib>BAO ZICHEN</creatorcontrib><creatorcontrib>DU CHUANG</creatorcontrib><creatorcontrib>YU MIAO</creatorcontrib><creatorcontrib>LIU ZHENJIE</creatorcontrib><creatorcontrib>YE LIN</creatorcontrib><title>Data access management method and system for new energy equipment</title><description>The invention provides a data access management method and system for new energy equipment, which can solve the problem of slow data access response caused by explosive increase of data volume along with continuous access of the new energy equipment, and comprises the following steps: acquiring a request record in a data access process, and storing to obtain historical request data; constructing a rule analysis model based on a deep learning algorithm, training the rule analysis model through historical request data, and optimizing model parameters; aggregation operation is carried out on data generated in the operation process of the new energy equipment through the trained rule analysis model, different aggregation data sets are generated, and the aggregation data sets and the original data sets are stored in a partitioned mode; and analyzing newly accessed access request data through the trained rule analysis model, if the access pre-aggregation data condition is met, routing the access request to the corr</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>ELECTRIC DIGITAL DATA PROCESSING</subject><subject>PHYSICS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHB0SSxJVEhMTk4tLlbITcxLTE_NTc0rUchNLcnIT1FIzEtRKK4sLknNVUjLL1LISy1XSM1LLUqvVEgtLM0sACnlYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyUAdJfHOfoaGZmZmRsbGxo7GxKgBAPHIMZs</recordid><startdate>20230829</startdate><enddate>20230829</enddate><creator>WANG WEI</creator><creator>XIANG TONGWEI</creator><creator>HUANG LIZHE</creator><creator>WANG PENG</creator><creator>CAO JING</creator><creator>TAN GUONING</creator><creator>LIU MEICEN</creator><creator>BAO ZICHEN</creator><creator>DU CHUANG</creator><creator>YU MIAO</creator><creator>LIU ZHENJIE</creator><creator>YE LIN</creator><scope>EVB</scope></search><sort><creationdate>20230829</creationdate><title>Data access management method and system for new energy equipment</title><author>WANG WEI ; XIANG TONGWEI ; HUANG LIZHE ; WANG PENG ; CAO JING ; TAN GUONING ; LIU MEICEN ; BAO ZICHEN ; DU CHUANG ; YU MIAO ; LIU ZHENJIE ; YE LIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116662333A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>ELECTRIC DIGITAL DATA PROCESSING</topic><topic>PHYSICS</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG WEI</creatorcontrib><creatorcontrib>XIANG TONGWEI</creatorcontrib><creatorcontrib>HUANG LIZHE</creatorcontrib><creatorcontrib>WANG PENG</creatorcontrib><creatorcontrib>CAO JING</creatorcontrib><creatorcontrib>TAN GUONING</creatorcontrib><creatorcontrib>LIU MEICEN</creatorcontrib><creatorcontrib>BAO ZICHEN</creatorcontrib><creatorcontrib>DU CHUANG</creatorcontrib><creatorcontrib>YU MIAO</creatorcontrib><creatorcontrib>LIU ZHENJIE</creatorcontrib><creatorcontrib>YE LIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG WEI</au><au>XIANG TONGWEI</au><au>HUANG LIZHE</au><au>WANG PENG</au><au>CAO JING</au><au>TAN GUONING</au><au>LIU MEICEN</au><au>BAO ZICHEN</au><au>DU CHUANG</au><au>YU MIAO</au><au>LIU ZHENJIE</au><au>YE LIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Data access management method and system for new energy equipment</title><date>2023-08-29</date><risdate>2023</risdate><abstract>The invention provides a data access management method and system for new energy equipment, which can solve the problem of slow data access response caused by explosive increase of data volume along with continuous access of the new energy equipment, and comprises the following steps: acquiring a request record in a data access process, and storing to obtain historical request data; constructing a rule analysis model based on a deep learning algorithm, training the rule analysis model through historical request data, and optimizing model parameters; aggregation operation is carried out on data generated in the operation process of the new energy equipment through the trained rule analysis model, different aggregation data sets are generated, and the aggregation data sets and the original data sets are stored in a partitioned mode; and analyzing newly accessed access request data through the trained rule analysis model, if the access pre-aggregation data condition is met, routing the access request to the corr</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN116662333A
source esp@cenet
subjects CALCULATING
COMPUTING
COUNTING
ELECTRIC DIGITAL DATA PROCESSING
PHYSICS
title Data access management method and system for new energy equipment
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-03T08%3A10%3A33IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20WEI&rft.date=2023-08-29&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116662333A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true