Shield construction method for crossing existing building

The invention relates to a shield construction method for crossing an existing building, which comprises the following steps of: establishing a pre-estimation model, simulating and predicting shield construction by utilizing the pre-estimation model according to a construction drawing, and modifying...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: REN TIELUN, JIAO XUEYANG, ZHOU QIANG, GUO JINGZHUO, HU ZHIPENG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator REN TIELUN
JIAO XUEYANG
ZHOU QIANG
GUO JINGZHUO
HU ZHIPENG
description The invention relates to a shield construction method for crossing an existing building, which comprises the following steps of: establishing a pre-estimation model, simulating and predicting shield construction by utilizing the pre-estimation model according to a construction drawing, and modifying a construction scheme according to a simulation result; shield tunneling is utilized, the excavation face pressure of a slurry shield is set according to construction parameters, the shield tail gap and the tunneling speed of the shield are controlled, and the pressure and flow of synchronous grouting are controlled; and the settlement amount of the stratum is analyzed through the pre-estimation model and the construction parameters, and secondary grouting and reinforcement are conducted according to the settlement amount. The problem that shield control is difficult under the working conditions of large gradient, small curvature and soft soil is effectively solved, the shield is accurately controlled, so that the
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116591702A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116591702A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116591702A3</originalsourceid><addsrcrecordid>eNrjZLAMzshMzUlRSM7PKy4pKk0uyczPU8hNLcnIT1FIyy9SSC7KLy7OzEtXSK3ILC4BMZJKM3NSgAweBta0xJziVF4ozc2g6OYa4uyhm1qQH59aXJCYnJqXWhLv7GdoaGZqaWhuYORoTIwaAIolL00</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Shield construction method for crossing existing building</title><source>esp@cenet</source><creator>REN TIELUN ; JIAO XUEYANG ; ZHOU QIANG ; GUO JINGZHUO ; HU ZHIPENG</creator><creatorcontrib>REN TIELUN ; JIAO XUEYANG ; ZHOU QIANG ; GUO JINGZHUO ; HU ZHIPENG</creatorcontrib><description>The invention relates to a shield construction method for crossing an existing building, which comprises the following steps of: establishing a pre-estimation model, simulating and predicting shield construction by utilizing the pre-estimation model according to a construction drawing, and modifying a construction scheme according to a simulation result; shield tunneling is utilized, the excavation face pressure of a slurry shield is set according to construction parameters, the shield tail gap and the tunneling speed of the shield are controlled, and the pressure and flow of synchronous grouting are controlled; and the settlement amount of the stratum is analyzed through the pre-estimation model and the construction parameters, and secondary grouting and reinforcement are conducted according to the settlement amount. The problem that shield control is difficult under the working conditions of large gradient, small curvature and soft soil is effectively solved, the shield is accurately controlled, so that the</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230815&amp;DB=EPODOC&amp;CC=CN&amp;NR=116591702A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230815&amp;DB=EPODOC&amp;CC=CN&amp;NR=116591702A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>REN TIELUN</creatorcontrib><creatorcontrib>JIAO XUEYANG</creatorcontrib><creatorcontrib>ZHOU QIANG</creatorcontrib><creatorcontrib>GUO JINGZHUO</creatorcontrib><creatorcontrib>HU ZHIPENG</creatorcontrib><title>Shield construction method for crossing existing building</title><description>The invention relates to a shield construction method for crossing an existing building, which comprises the following steps of: establishing a pre-estimation model, simulating and predicting shield construction by utilizing the pre-estimation model according to a construction drawing, and modifying a construction scheme according to a simulation result; shield tunneling is utilized, the excavation face pressure of a slurry shield is set according to construction parameters, the shield tail gap and the tunneling speed of the shield are controlled, and the pressure and flow of synchronous grouting are controlled; and the settlement amount of the stratum is analyzed through the pre-estimation model and the construction parameters, and secondary grouting and reinforcement are conducted according to the settlement amount. The problem that shield control is difficult under the working conditions of large gradient, small curvature and soft soil is effectively solved, the shield is accurately controlled, so that the</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLAMzshMzUlRSM7PKy4pKk0uyczPU8hNLcnIT1FIyy9SSC7KLy7OzEtXSK3ILC4BMZJKM3NSgAweBta0xJziVF4ozc2g6OYa4uyhm1qQH59aXJCYnJqXWhLv7GdoaGZqaWhuYORoTIwaAIolL00</recordid><startdate>20230815</startdate><enddate>20230815</enddate><creator>REN TIELUN</creator><creator>JIAO XUEYANG</creator><creator>ZHOU QIANG</creator><creator>GUO JINGZHUO</creator><creator>HU ZHIPENG</creator><scope>EVB</scope></search><sort><creationdate>20230815</creationdate><title>Shield construction method for crossing existing building</title><author>REN TIELUN ; JIAO XUEYANG ; ZHOU QIANG ; GUO JINGZHUO ; HU ZHIPENG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116591702A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>REN TIELUN</creatorcontrib><creatorcontrib>JIAO XUEYANG</creatorcontrib><creatorcontrib>ZHOU QIANG</creatorcontrib><creatorcontrib>GUO JINGZHUO</creatorcontrib><creatorcontrib>HU ZHIPENG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>REN TIELUN</au><au>JIAO XUEYANG</au><au>ZHOU QIANG</au><au>GUO JINGZHUO</au><au>HU ZHIPENG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Shield construction method for crossing existing building</title><date>2023-08-15</date><risdate>2023</risdate><abstract>The invention relates to a shield construction method for crossing an existing building, which comprises the following steps of: establishing a pre-estimation model, simulating and predicting shield construction by utilizing the pre-estimation model according to a construction drawing, and modifying a construction scheme according to a simulation result; shield tunneling is utilized, the excavation face pressure of a slurry shield is set according to construction parameters, the shield tail gap and the tunneling speed of the shield are controlled, and the pressure and flow of synchronous grouting are controlled; and the settlement amount of the stratum is analyzed through the pre-estimation model and the construction parameters, and secondary grouting and reinforcement are conducted according to the settlement amount. The problem that shield control is difficult under the working conditions of large gradient, small curvature and soft soil is effectively solved, the shield is accurately controlled, so that the</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN116591702A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
TUNNELS
title Shield construction method for crossing existing building
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-26T14%3A35%3A49IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=REN%20TIELUN&rft.date=2023-08-15&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116591702A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true