High-speed railway soft rock deep cutting roadbed long-term deformation blocking structure and design method
The invention discloses a high-speed railway soft rock deep cutting roadbed long-term deformation blocking structure which comprises flexible blocking structures arranged on the two sides of a roadbed at intervals in the longitudinal direction of a line, and the flexible blocking structures are form...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHONG ZHIBIN YONG POH BOON CHEN XU LYU LEI LI ANHONG LIU ZHICHENG LI TIANBIN DU YONG WANG WENPO FENG JIE WU PEIPEI DENG RONGGUI ZHANG JIN JIAO TONG FAN XUANMEI |
description | The invention discloses a high-speed railway soft rock deep cutting roadbed long-term deformation blocking structure which comprises flexible blocking structures arranged on the two sides of a roadbed at intervals in the longitudinal direction of a line, and the flexible blocking structures are formed by filling deep grooves excavated in foundation rock mass with flexible composite materials. The flexible composite material is formed by mixing polystyrene (EPS) foam particles, waste tire rubber particles and polyurethane resin (PU), the polyurethane resin (PU) is a cementing material, the polystyrene (EPS) foam particles and the waste tire rubber particles can be effectively cemented into a composite material with good compression resistance and tensile strength, and the composite material is also a waterproof material. Groundwater permeation can be prevented, a waterproof curtain is formed, and polystyrene (EPS) foam particles serve as coarse aggregate of the flexible composite material.
本发明公开了高速铁路软岩深路堑路基长期变 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116556115A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116556115A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116556115A3</originalsourceid><addsrcrecordid>eNqNy0EKwjAQBdBuXIh6h_EAXQRp91IqXblyX6bJNA2mmZBMEW9vBA_g6sP_7-8rPzi71DkSGUjo_AvfkHkWSKyfYIgi6E3EBVsaNFNhnoOthdJa5pnTiuI4wOTL4cuypE3LlggwmEKyswFWkoXNsdrN6DOdfnmozrf-0Q01RR4pR9QUSMburlTbNK1SzfXyj_kAPSVCFQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>High-speed railway soft rock deep cutting roadbed long-term deformation blocking structure and design method</title><source>esp@cenet</source><creator>ZHONG ZHIBIN ; YONG POH BOON ; CHEN XU ; LYU LEI ; LI ANHONG ; LIU ZHICHENG ; LI TIANBIN ; DU YONG ; WANG WENPO ; FENG JIE ; WU PEIPEI ; DENG RONGGUI ; ZHANG JIN ; JIAO TONG ; FAN XUANMEI</creator><creatorcontrib>ZHONG ZHIBIN ; YONG POH BOON ; CHEN XU ; LYU LEI ; LI ANHONG ; LIU ZHICHENG ; LI TIANBIN ; DU YONG ; WANG WENPO ; FENG JIE ; WU PEIPEI ; DENG RONGGUI ; ZHANG JIN ; JIAO TONG ; FAN XUANMEI</creatorcontrib><description>The invention discloses a high-speed railway soft rock deep cutting roadbed long-term deformation blocking structure which comprises flexible blocking structures arranged on the two sides of a roadbed at intervals in the longitudinal direction of a line, and the flexible blocking structures are formed by filling deep grooves excavated in foundation rock mass with flexible composite materials. The flexible composite material is formed by mixing polystyrene (EPS) foam particles, waste tire rubber particles and polyurethane resin (PU), the polyurethane resin (PU) is a cementing material, the polystyrene (EPS) foam particles and the waste tire rubber particles can be effectively cemented into a composite material with good compression resistance and tensile strength, and the composite material is also a waterproof material. Groundwater permeation can be prevented, a waterproof curtain is formed, and polystyrene (EPS) foam particles serve as coarse aggregate of the flexible composite material.
本发明公开了高速铁路软岩深路堑路基长期变</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; COUNTING ; ELECTRIC DIGITAL DATA PROCESSING ; FIXED CONSTRUCTIONS ; MACHINES FOR MAKING RAILWAYS OF ALL KINDS ; PERMANENT WAY ; PERMANENT-WAY TOOLS ; PHYSICS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230808&DB=EPODOC&CC=CN&NR=116556115A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230808&DB=EPODOC&CC=CN&NR=116556115A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHONG ZHIBIN</creatorcontrib><creatorcontrib>YONG POH BOON</creatorcontrib><creatorcontrib>CHEN XU</creatorcontrib><creatorcontrib>LYU LEI</creatorcontrib><creatorcontrib>LI ANHONG</creatorcontrib><creatorcontrib>LIU ZHICHENG</creatorcontrib><creatorcontrib>LI TIANBIN</creatorcontrib><creatorcontrib>DU YONG</creatorcontrib><creatorcontrib>WANG WENPO</creatorcontrib><creatorcontrib>FENG JIE</creatorcontrib><creatorcontrib>WU PEIPEI</creatorcontrib><creatorcontrib>DENG RONGGUI</creatorcontrib><creatorcontrib>ZHANG JIN</creatorcontrib><creatorcontrib>JIAO TONG</creatorcontrib><creatorcontrib>FAN XUANMEI</creatorcontrib><title>High-speed railway soft rock deep cutting roadbed long-term deformation blocking structure and design method</title><description>The invention discloses a high-speed railway soft rock deep cutting roadbed long-term deformation blocking structure which comprises flexible blocking structures arranged on the two sides of a roadbed at intervals in the longitudinal direction of a line, and the flexible blocking structures are formed by filling deep grooves excavated in foundation rock mass with flexible composite materials. The flexible composite material is formed by mixing polystyrene (EPS) foam particles, waste tire rubber particles and polyurethane resin (PU), the polyurethane resin (PU) is a cementing material, the polystyrene (EPS) foam particles and the waste tire rubber particles can be effectively cemented into a composite material with good compression resistance and tensile strength, and the composite material is also a waterproof material. Groundwater permeation can be prevented, a waterproof curtain is formed, and polystyrene (EPS) foam particles serve as coarse aggregate of the flexible composite material.
本发明公开了高速铁路软岩深路堑路基长期变</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>COUNTING</subject><subject>ELECTRIC DIGITAL DATA PROCESSING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MACHINES FOR MAKING RAILWAYS OF ALL KINDS</subject><subject>PERMANENT WAY</subject><subject>PERMANENT-WAY TOOLS</subject><subject>PHYSICS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNy0EKwjAQBdBuXIh6h_EAXQRp91IqXblyX6bJNA2mmZBMEW9vBA_g6sP_7-8rPzi71DkSGUjo_AvfkHkWSKyfYIgi6E3EBVsaNFNhnoOthdJa5pnTiuI4wOTL4cuypE3LlggwmEKyswFWkoXNsdrN6DOdfnmozrf-0Q01RR4pR9QUSMburlTbNK1SzfXyj_kAPSVCFQ</recordid><startdate>20230808</startdate><enddate>20230808</enddate><creator>ZHONG ZHIBIN</creator><creator>YONG POH BOON</creator><creator>CHEN XU</creator><creator>LYU LEI</creator><creator>LI ANHONG</creator><creator>LIU ZHICHENG</creator><creator>LI TIANBIN</creator><creator>DU YONG</creator><creator>WANG WENPO</creator><creator>FENG JIE</creator><creator>WU PEIPEI</creator><creator>DENG RONGGUI</creator><creator>ZHANG JIN</creator><creator>JIAO TONG</creator><creator>FAN XUANMEI</creator><scope>EVB</scope></search><sort><creationdate>20230808</creationdate><title>High-speed railway soft rock deep cutting roadbed long-term deformation blocking structure and design method</title><author>ZHONG ZHIBIN ; YONG POH BOON ; CHEN XU ; LYU LEI ; LI ANHONG ; LIU ZHICHENG ; LI TIANBIN ; DU YONG ; WANG WENPO ; FENG JIE ; WU PEIPEI ; DENG RONGGUI ; ZHANG JIN ; JIAO TONG ; FAN XUANMEI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116556115A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>COUNTING</topic><topic>ELECTRIC DIGITAL DATA PROCESSING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MACHINES FOR MAKING RAILWAYS OF ALL KINDS</topic><topic>PERMANENT WAY</topic><topic>PERMANENT-WAY TOOLS</topic><topic>PHYSICS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHONG ZHIBIN</creatorcontrib><creatorcontrib>YONG POH BOON</creatorcontrib><creatorcontrib>CHEN XU</creatorcontrib><creatorcontrib>LYU LEI</creatorcontrib><creatorcontrib>LI ANHONG</creatorcontrib><creatorcontrib>LIU ZHICHENG</creatorcontrib><creatorcontrib>LI TIANBIN</creatorcontrib><creatorcontrib>DU YONG</creatorcontrib><creatorcontrib>WANG WENPO</creatorcontrib><creatorcontrib>FENG JIE</creatorcontrib><creatorcontrib>WU PEIPEI</creatorcontrib><creatorcontrib>DENG RONGGUI</creatorcontrib><creatorcontrib>ZHANG JIN</creatorcontrib><creatorcontrib>JIAO TONG</creatorcontrib><creatorcontrib>FAN XUANMEI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHONG ZHIBIN</au><au>YONG POH BOON</au><au>CHEN XU</au><au>LYU LEI</au><au>LI ANHONG</au><au>LIU ZHICHENG</au><au>LI TIANBIN</au><au>DU YONG</au><au>WANG WENPO</au><au>FENG JIE</au><au>WU PEIPEI</au><au>DENG RONGGUI</au><au>ZHANG JIN</au><au>JIAO TONG</au><au>FAN XUANMEI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>High-speed railway soft rock deep cutting roadbed long-term deformation blocking structure and design method</title><date>2023-08-08</date><risdate>2023</risdate><abstract>The invention discloses a high-speed railway soft rock deep cutting roadbed long-term deformation blocking structure which comprises flexible blocking structures arranged on the two sides of a roadbed at intervals in the longitudinal direction of a line, and the flexible blocking structures are formed by filling deep grooves excavated in foundation rock mass with flexible composite materials. The flexible composite material is formed by mixing polystyrene (EPS) foam particles, waste tire rubber particles and polyurethane resin (PU), the polyurethane resin (PU) is a cementing material, the polystyrene (EPS) foam particles and the waste tire rubber particles can be effectively cemented into a composite material with good compression resistance and tensile strength, and the composite material is also a waterproof material. Groundwater permeation can be prevented, a waterproof curtain is formed, and polystyrene (EPS) foam particles serve as coarse aggregate of the flexible composite material.
本发明公开了高速铁路软岩深路堑路基长期变</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN116556115A |
source | esp@cenet |
subjects | CALCULATING COMPUTING CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES COUNTING ELECTRIC DIGITAL DATA PROCESSING FIXED CONSTRUCTIONS MACHINES FOR MAKING RAILWAYS OF ALL KINDS PERMANENT WAY PERMANENT-WAY TOOLS PHYSICS |
title | High-speed railway soft rock deep cutting roadbed long-term deformation blocking structure and design method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-07T16%3A30%3A46IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHONG%20ZHIBIN&rft.date=2023-08-08&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116556115A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |