Deep high ground stress roadway full-length anchoring pressure relief support cooperative control method and structure
The invention discloses a deep high ground stress roadway full-length anchoring pressure relief support cooperative control method and structure, and the method comprises the following steps: S1, drilling small hole pressure relief hole groups: drilling a plurality of small hole pressure relief hole...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!