High-pressure jet grouting pile
The high-pressure jet grouting pile comprises a pile body, a plurality of sets of fixing assemblies are arranged on the side wall of the pile body, and each fixing assembly comprises a grounding rod connected to the pile body in a sliding mode; a triggering assembly is arranged at the bottom of the...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHANG HE ZHANG XINYU GUO ZHIQIANG LI XIN WEN FAN SUN KUNPENG HUANG YUNLAI ZHANG JUNCHUAN YAN HU JIANG MINGXING LUO QIDUAN YASUSHIDA TONG YANG KE YIFAN SONG RUI ZHANG HONGMENG SU PENGHUI YUAN JIANGBIN LIU YUBO CHEN YONGQING HONG YAO |
description | The high-pressure jet grouting pile comprises a pile body, a plurality of sets of fixing assemblies are arranged on the side wall of the pile body, and each fixing assembly comprises a grounding rod connected to the pile body in a sliding mode; a triggering assembly is arranged at the bottom of the pile body and is in transmission connection with the multiple sets of ground binding rods through a transmission assembly. When the pile body is installed in the base, the trigger assembly touches the ground, the multiple sets of ground binding rods are driven by the trigger assembly to slide synchronously, so that the ground binding rods are inserted into the base, and the pile body is fixed. When the pile body is installed in a base, the triggering assembly touches the ground, the multiple sets of ground binding rods are driven by the triggering assembly to slide synchronously, the ground binding rods are inserted into the base, the pile body is fixed, and therefore when the pile body is installed in the base, th |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116516942A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116516942A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116516942A3</originalsourceid><addsrcrecordid>eNrjZJD3yEzP0C0oSi0uLi1KVchKLVFIL8ovLcnMS1coyMxJ5WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hoZmpoZmliZGjsbEqAEAKZgk7g</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>High-pressure jet grouting pile</title><source>esp@cenet</source><creator>ZHANG HE ; ZHANG XINYU ; GUO ZHIQIANG ; LI XIN ; WEN FAN ; SUN KUNPENG ; HUANG YUNLAI ; ZHANG JUNCHUAN ; YAN HU ; JIANG MINGXING ; LUO QIDUAN ; YASUSHIDA ; TONG YANG ; KE YIFAN ; SONG RUI ; ZHANG HONGMENG ; SU PENGHUI ; YUAN JIANGBIN ; LIU YUBO ; CHEN YONGQING ; HONG YAO</creator><creatorcontrib>ZHANG HE ; ZHANG XINYU ; GUO ZHIQIANG ; LI XIN ; WEN FAN ; SUN KUNPENG ; HUANG YUNLAI ; ZHANG JUNCHUAN ; YAN HU ; JIANG MINGXING ; LUO QIDUAN ; YASUSHIDA ; TONG YANG ; KE YIFAN ; SONG RUI ; ZHANG HONGMENG ; SU PENGHUI ; YUAN JIANGBIN ; LIU YUBO ; CHEN YONGQING ; HONG YAO</creatorcontrib><description>The high-pressure jet grouting pile comprises a pile body, a plurality of sets of fixing assemblies are arranged on the side wall of the pile body, and each fixing assembly comprises a grounding rod connected to the pile body in a sliding mode; a triggering assembly is arranged at the bottom of the pile body and is in transmission connection with the multiple sets of ground binding rods through a transmission assembly. When the pile body is installed in the base, the trigger assembly touches the ground, the multiple sets of ground binding rods are driven by the trigger assembly to slide synchronously, so that the ground binding rods are inserted into the base, and the pile body is fixed. When the pile body is installed in a base, the triggering assembly touches the ground, the multiple sets of ground binding rods are driven by the triggering assembly to slide synchronously, the ground binding rods are inserted into the base, the pile body is fixed, and therefore when the pile body is installed in the base, th</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230801&DB=EPODOC&CC=CN&NR=116516942A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230801&DB=EPODOC&CC=CN&NR=116516942A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG HE</creatorcontrib><creatorcontrib>ZHANG XINYU</creatorcontrib><creatorcontrib>GUO ZHIQIANG</creatorcontrib><creatorcontrib>LI XIN</creatorcontrib><creatorcontrib>WEN FAN</creatorcontrib><creatorcontrib>SUN KUNPENG</creatorcontrib><creatorcontrib>HUANG YUNLAI</creatorcontrib><creatorcontrib>ZHANG JUNCHUAN</creatorcontrib><creatorcontrib>YAN HU</creatorcontrib><creatorcontrib>JIANG MINGXING</creatorcontrib><creatorcontrib>LUO QIDUAN</creatorcontrib><creatorcontrib>YASUSHIDA</creatorcontrib><creatorcontrib>TONG YANG</creatorcontrib><creatorcontrib>KE YIFAN</creatorcontrib><creatorcontrib>SONG RUI</creatorcontrib><creatorcontrib>ZHANG HONGMENG</creatorcontrib><creatorcontrib>SU PENGHUI</creatorcontrib><creatorcontrib>YUAN JIANGBIN</creatorcontrib><creatorcontrib>LIU YUBO</creatorcontrib><creatorcontrib>CHEN YONGQING</creatorcontrib><creatorcontrib>HONG YAO</creatorcontrib><title>High-pressure jet grouting pile</title><description>The high-pressure jet grouting pile comprises a pile body, a plurality of sets of fixing assemblies are arranged on the side wall of the pile body, and each fixing assembly comprises a grounding rod connected to the pile body in a sliding mode; a triggering assembly is arranged at the bottom of the pile body and is in transmission connection with the multiple sets of ground binding rods through a transmission assembly. When the pile body is installed in the base, the trigger assembly touches the ground, the multiple sets of ground binding rods are driven by the trigger assembly to slide synchronously, so that the ground binding rods are inserted into the base, and the pile body is fixed. When the pile body is installed in a base, the triggering assembly touches the ground, the multiple sets of ground binding rods are driven by the triggering assembly to slide synchronously, the ground binding rods are inserted into the base, the pile body is fixed, and therefore when the pile body is installed in the base, th</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZJD3yEzP0C0oSi0uLi1KVchKLVFIL8ovLcnMS1coyMxJ5WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hoZmpoZmliZGjsbEqAEAKZgk7g</recordid><startdate>20230801</startdate><enddate>20230801</enddate><creator>ZHANG HE</creator><creator>ZHANG XINYU</creator><creator>GUO ZHIQIANG</creator><creator>LI XIN</creator><creator>WEN FAN</creator><creator>SUN KUNPENG</creator><creator>HUANG YUNLAI</creator><creator>ZHANG JUNCHUAN</creator><creator>YAN HU</creator><creator>JIANG MINGXING</creator><creator>LUO QIDUAN</creator><creator>YASUSHIDA</creator><creator>TONG YANG</creator><creator>KE YIFAN</creator><creator>SONG RUI</creator><creator>ZHANG HONGMENG</creator><creator>SU PENGHUI</creator><creator>YUAN JIANGBIN</creator><creator>LIU YUBO</creator><creator>CHEN YONGQING</creator><creator>HONG YAO</creator><scope>EVB</scope></search><sort><creationdate>20230801</creationdate><title>High-pressure jet grouting pile</title><author>ZHANG HE ; ZHANG XINYU ; GUO ZHIQIANG ; LI XIN ; WEN FAN ; SUN KUNPENG ; HUANG YUNLAI ; ZHANG JUNCHUAN ; YAN HU ; JIANG MINGXING ; LUO QIDUAN ; YASUSHIDA ; TONG YANG ; KE YIFAN ; SONG RUI ; ZHANG HONGMENG ; SU PENGHUI ; YUAN JIANGBIN ; LIU YUBO ; CHEN YONGQING ; HONG YAO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116516942A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG HE</creatorcontrib><creatorcontrib>ZHANG XINYU</creatorcontrib><creatorcontrib>GUO ZHIQIANG</creatorcontrib><creatorcontrib>LI XIN</creatorcontrib><creatorcontrib>WEN FAN</creatorcontrib><creatorcontrib>SUN KUNPENG</creatorcontrib><creatorcontrib>HUANG YUNLAI</creatorcontrib><creatorcontrib>ZHANG JUNCHUAN</creatorcontrib><creatorcontrib>YAN HU</creatorcontrib><creatorcontrib>JIANG MINGXING</creatorcontrib><creatorcontrib>LUO QIDUAN</creatorcontrib><creatorcontrib>YASUSHIDA</creatorcontrib><creatorcontrib>TONG YANG</creatorcontrib><creatorcontrib>KE YIFAN</creatorcontrib><creatorcontrib>SONG RUI</creatorcontrib><creatorcontrib>ZHANG HONGMENG</creatorcontrib><creatorcontrib>SU PENGHUI</creatorcontrib><creatorcontrib>YUAN JIANGBIN</creatorcontrib><creatorcontrib>LIU YUBO</creatorcontrib><creatorcontrib>CHEN YONGQING</creatorcontrib><creatorcontrib>HONG YAO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG HE</au><au>ZHANG XINYU</au><au>GUO ZHIQIANG</au><au>LI XIN</au><au>WEN FAN</au><au>SUN KUNPENG</au><au>HUANG YUNLAI</au><au>ZHANG JUNCHUAN</au><au>YAN HU</au><au>JIANG MINGXING</au><au>LUO QIDUAN</au><au>YASUSHIDA</au><au>TONG YANG</au><au>KE YIFAN</au><au>SONG RUI</au><au>ZHANG HONGMENG</au><au>SU PENGHUI</au><au>YUAN JIANGBIN</au><au>LIU YUBO</au><au>CHEN YONGQING</au><au>HONG YAO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>High-pressure jet grouting pile</title><date>2023-08-01</date><risdate>2023</risdate><abstract>The high-pressure jet grouting pile comprises a pile body, a plurality of sets of fixing assemblies are arranged on the side wall of the pile body, and each fixing assembly comprises a grounding rod connected to the pile body in a sliding mode; a triggering assembly is arranged at the bottom of the pile body and is in transmission connection with the multiple sets of ground binding rods through a transmission assembly. When the pile body is installed in the base, the trigger assembly touches the ground, the multiple sets of ground binding rods are driven by the trigger assembly to slide synchronously, so that the ground binding rods are inserted into the base, and the pile body is fixed. When the pile body is installed in a base, the triggering assembly touches the ground, the multiple sets of ground binding rods are driven by the triggering assembly to slide synchronously, the ground binding rods are inserted into the base, the pile body is fixed, and therefore when the pile body is installed in the base, th</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN116516942A |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | High-pressure jet grouting pile |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T20%3A22%3A28IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20HE&rft.date=2023-08-01&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116516942A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |