Rapid construction method for space cable surface stay cable rear fulcrum hanging basket in typhoon-prone area

The invention discloses a typhoon-prone area space cable surface stay cable rear fulcrum hanging basket rapid construction method which comprises the steps that a hanging basket main truss component is transferred to a lower site where a hanging basket is used, and rod pieces and joints of the hangi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHEN QINGHUA, CHEN MING, YAN HUATANG, YANG YINGDONG, LIU ZHIJUN, DAI XIANGUO, LI YUNMING, JING JIACHI, ZENG LINGYE, ZHANG GUANGHUI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator CHEN QINGHUA
CHEN MING
YAN HUATANG
YANG YINGDONG
LIU ZHIJUN
DAI XIANGUO
LI YUNMING
JING JIACHI
ZENG LINGYE
ZHANG GUANGHUI
description The invention discloses a typhoon-prone area space cable surface stay cable rear fulcrum hanging basket rapid construction method which comprises the steps that a hanging basket main truss component is transferred to a lower site where a hanging basket is used, and rod pieces and joints of the hanging basket main truss component are elevated through I-shaped steel; node pins are driven in, and safety pins are installed; the vertical rods are connected with the upper and lower nodes through node pins; hoisting a front pull rod, sleeving an upper node, driving a node pin, closing the angles of the front pull rod and a front pressing rod by utilizing a chain block, driving the node pin, hoisting a rear pull rod and a rear pressing rod in sequence, and sleeving a rear node; a lifting point and a lifting appliance are selected and installed, and the lifting appliance is directly lifted to the position above a hanging basket rail to be installed; the hanging basket construction inner mold is integrally hoisted; pre
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116427297A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116427297A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116427297A3</originalsourceid><addsrcrecordid>eNqNjT0KwkAQRtNYiHqH8QApEkWxlKBYWYh9mGxmk8VkZtmdLXJ7f8gBrD7e48G3zPiB3rVghKOGZNQJw0jaSwtWAkSPhsBgMxDEFOyXouI0q0AYwKbBhDRCj9w57qDB-CIFx6CT70U490GYAD_1OltYHCJt5l1l2-vlWd1y8lLT741J6-peFId9eSxPx_Pun-YNwjxCmg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Rapid construction method for space cable surface stay cable rear fulcrum hanging basket in typhoon-prone area</title><source>esp@cenet</source><creator>CHEN QINGHUA ; CHEN MING ; YAN HUATANG ; YANG YINGDONG ; LIU ZHIJUN ; DAI XIANGUO ; LI YUNMING ; JING JIACHI ; ZENG LINGYE ; ZHANG GUANGHUI</creator><creatorcontrib>CHEN QINGHUA ; CHEN MING ; YAN HUATANG ; YANG YINGDONG ; LIU ZHIJUN ; DAI XIANGUO ; LI YUNMING ; JING JIACHI ; ZENG LINGYE ; ZHANG GUANGHUI</creatorcontrib><description>The invention discloses a typhoon-prone area space cable surface stay cable rear fulcrum hanging basket rapid construction method which comprises the steps that a hanging basket main truss component is transferred to a lower site where a hanging basket is used, and rod pieces and joints of the hanging basket main truss component are elevated through I-shaped steel; node pins are driven in, and safety pins are installed; the vertical rods are connected with the upper and lower nodes through node pins; hoisting a front pull rod, sleeving an upper node, driving a node pin, closing the angles of the front pull rod and a front pressing rod by utilizing a chain block, driving the node pin, hoisting a rear pull rod and a rear pressing rod in sequence, and sleeving a rear node; a lifting point and a lifting appliance are selected and installed, and the lifting appliance is directly lifted to the position above a hanging basket rail to be installed; the hanging basket construction inner mold is integrally hoisted; pre</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230714&amp;DB=EPODOC&amp;CC=CN&amp;NR=116427297A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230714&amp;DB=EPODOC&amp;CC=CN&amp;NR=116427297A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHEN QINGHUA</creatorcontrib><creatorcontrib>CHEN MING</creatorcontrib><creatorcontrib>YAN HUATANG</creatorcontrib><creatorcontrib>YANG YINGDONG</creatorcontrib><creatorcontrib>LIU ZHIJUN</creatorcontrib><creatorcontrib>DAI XIANGUO</creatorcontrib><creatorcontrib>LI YUNMING</creatorcontrib><creatorcontrib>JING JIACHI</creatorcontrib><creatorcontrib>ZENG LINGYE</creatorcontrib><creatorcontrib>ZHANG GUANGHUI</creatorcontrib><title>Rapid construction method for space cable surface stay cable rear fulcrum hanging basket in typhoon-prone area</title><description>The invention discloses a typhoon-prone area space cable surface stay cable rear fulcrum hanging basket rapid construction method which comprises the steps that a hanging basket main truss component is transferred to a lower site where a hanging basket is used, and rod pieces and joints of the hanging basket main truss component are elevated through I-shaped steel; node pins are driven in, and safety pins are installed; the vertical rods are connected with the upper and lower nodes through node pins; hoisting a front pull rod, sleeving an upper node, driving a node pin, closing the angles of the front pull rod and a front pressing rod by utilizing a chain block, driving the node pin, hoisting a rear pull rod and a rear pressing rod in sequence, and sleeving a rear node; a lifting point and a lifting appliance are selected and installed, and the lifting appliance is directly lifted to the position above a hanging basket rail to be installed; the hanging basket construction inner mold is integrally hoisted; pre</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjT0KwkAQRtNYiHqH8QApEkWxlKBYWYh9mGxmk8VkZtmdLXJ7f8gBrD7e48G3zPiB3rVghKOGZNQJw0jaSwtWAkSPhsBgMxDEFOyXouI0q0AYwKbBhDRCj9w57qDB-CIFx6CT70U490GYAD_1OltYHCJt5l1l2-vlWd1y8lLT741J6-peFId9eSxPx_Pun-YNwjxCmg</recordid><startdate>20230714</startdate><enddate>20230714</enddate><creator>CHEN QINGHUA</creator><creator>CHEN MING</creator><creator>YAN HUATANG</creator><creator>YANG YINGDONG</creator><creator>LIU ZHIJUN</creator><creator>DAI XIANGUO</creator><creator>LI YUNMING</creator><creator>JING JIACHI</creator><creator>ZENG LINGYE</creator><creator>ZHANG GUANGHUI</creator><scope>EVB</scope></search><sort><creationdate>20230714</creationdate><title>Rapid construction method for space cable surface stay cable rear fulcrum hanging basket in typhoon-prone area</title><author>CHEN QINGHUA ; CHEN MING ; YAN HUATANG ; YANG YINGDONG ; LIU ZHIJUN ; DAI XIANGUO ; LI YUNMING ; JING JIACHI ; ZENG LINGYE ; ZHANG GUANGHUI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116427297A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>CHEN QINGHUA</creatorcontrib><creatorcontrib>CHEN MING</creatorcontrib><creatorcontrib>YAN HUATANG</creatorcontrib><creatorcontrib>YANG YINGDONG</creatorcontrib><creatorcontrib>LIU ZHIJUN</creatorcontrib><creatorcontrib>DAI XIANGUO</creatorcontrib><creatorcontrib>LI YUNMING</creatorcontrib><creatorcontrib>JING JIACHI</creatorcontrib><creatorcontrib>ZENG LINGYE</creatorcontrib><creatorcontrib>ZHANG GUANGHUI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHEN QINGHUA</au><au>CHEN MING</au><au>YAN HUATANG</au><au>YANG YINGDONG</au><au>LIU ZHIJUN</au><au>DAI XIANGUO</au><au>LI YUNMING</au><au>JING JIACHI</au><au>ZENG LINGYE</au><au>ZHANG GUANGHUI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Rapid construction method for space cable surface stay cable rear fulcrum hanging basket in typhoon-prone area</title><date>2023-07-14</date><risdate>2023</risdate><abstract>The invention discloses a typhoon-prone area space cable surface stay cable rear fulcrum hanging basket rapid construction method which comprises the steps that a hanging basket main truss component is transferred to a lower site where a hanging basket is used, and rod pieces and joints of the hanging basket main truss component are elevated through I-shaped steel; node pins are driven in, and safety pins are installed; the vertical rods are connected with the upper and lower nodes through node pins; hoisting a front pull rod, sleeving an upper node, driving a node pin, closing the angles of the front pull rod and a front pressing rod by utilizing a chain block, driving the node pin, hoisting a rear pull rod and a rear pressing rod in sequence, and sleeving a rear node; a lifting point and a lifting appliance are selected and installed, and the lifting appliance is directly lifted to the position above a hanging basket rail to be installed; the hanging basket construction inner mold is integrally hoisted; pre</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN116427297A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Rapid construction method for space cable surface stay cable rear fulcrum hanging basket in typhoon-prone area
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-24T01%3A26%3A45IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHEN%20QINGHUA&rft.date=2023-07-14&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116427297A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true