Construction method for large-section rectangular jacking pipe underneath passing through river shoal to meet obstacles and escape danger
The invention discloses a large-section rectangular jacking pipe underneath crossing river shoal obstacle encountering and danger avoiding construction method which comprises the following steps: S1, when the rectangular jacking pipe underneath crossing river shoal encounters the conditions that the...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHANG ZHIHUA GAO LEI YANG XIAOJUN QIN WEI YANG HAO LIN SHUO LIN BINGCHENG HU QIANHUA LI YONGZHI LI QIANG YIN CHEN |
description | The invention discloses a large-section rectangular jacking pipe underneath crossing river shoal obstacle encountering and danger avoiding construction method which comprises the following steps: S1, when the rectangular jacking pipe underneath crossing river shoal encounters the conditions that the current of a cutterhead and a screw machine stays at a high level and the torque of the cutterhead and the screw machine is sharply increased, reasons should be checked in time by means of forward and reverse rotation of the cutterhead, forward and reverse rotation of screw machine blades and the like; s2, the water flow of the river shoal is small, treatment can be conducted in a local excavation mode, and river water is guided before local excavation; s3, excavating and cleaning soil, filled stones and the like in the soil covering range of the riverbed in front of the pipe jacking machine by adopting an excavator, wherein the excavating depth is the soil covering depth from the top of the pipe jacking machine t |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116398162A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116398162A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116398162A3</originalsourceid><addsrcrecordid>eNqNjDEOgkAQRWksjHqH8QAUSEK0NERjZWVPxmVgUdzZzAzewVu7Rg9g9ZL3f948e9Uc1GRyNnCAB5nnFjoWGFF6ypW-gyRi6Kdk4YbuPoQe4hAJptCSBELzEFH1480LT70HGZ4koJ5xBOPUJgO-qqEbSQFDC6QOU6NNZZJlNutwVFr9uMjWx8OlPuUUuSGN6CiQNfW5KKpyty2qzb785_MG0BhNfQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method for large-section rectangular jacking pipe underneath passing through river shoal to meet obstacles and escape danger</title><source>esp@cenet</source><creator>ZHANG ZHIHUA ; GAO LEI ; YANG XIAOJUN ; QIN WEI ; YANG HAO ; LIN SHUO ; LIN BINGCHENG ; HU QIANHUA ; LI YONGZHI ; LI QIANG ; YIN CHEN</creator><creatorcontrib>ZHANG ZHIHUA ; GAO LEI ; YANG XIAOJUN ; QIN WEI ; YANG HAO ; LIN SHUO ; LIN BINGCHENG ; HU QIANHUA ; LI YONGZHI ; LI QIANG ; YIN CHEN</creatorcontrib><description>The invention discloses a large-section rectangular jacking pipe underneath crossing river shoal obstacle encountering and danger avoiding construction method which comprises the following steps: S1, when the rectangular jacking pipe underneath crossing river shoal encounters the conditions that the current of a cutterhead and a screw machine stays at a high level and the torque of the cutterhead and the screw machine is sharply increased, reasons should be checked in time by means of forward and reverse rotation of the cutterhead, forward and reverse rotation of screw machine blades and the like; s2, the water flow of the river shoal is small, treatment can be conducted in a local excavation mode, and river water is guided before local excavation; s3, excavating and cleaning soil, filled stones and the like in the soil covering range of the riverbed in front of the pipe jacking machine by adopting an excavator, wherein the excavating depth is the soil covering depth from the top of the pipe jacking machine t</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; GALLERIES ; HYDRAULIC ENGINEERING ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; SOIL SHIFTING ; TUNNELS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230707&DB=EPODOC&CC=CN&NR=116398162A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230707&DB=EPODOC&CC=CN&NR=116398162A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG ZHIHUA</creatorcontrib><creatorcontrib>GAO LEI</creatorcontrib><creatorcontrib>YANG XIAOJUN</creatorcontrib><creatorcontrib>QIN WEI</creatorcontrib><creatorcontrib>YANG HAO</creatorcontrib><creatorcontrib>LIN SHUO</creatorcontrib><creatorcontrib>LIN BINGCHENG</creatorcontrib><creatorcontrib>HU QIANHUA</creatorcontrib><creatorcontrib>LI YONGZHI</creatorcontrib><creatorcontrib>LI QIANG</creatorcontrib><creatorcontrib>YIN CHEN</creatorcontrib><title>Construction method for large-section rectangular jacking pipe underneath passing through river shoal to meet obstacles and escape danger</title><description>The invention discloses a large-section rectangular jacking pipe underneath crossing river shoal obstacle encountering and danger avoiding construction method which comprises the following steps: S1, when the rectangular jacking pipe underneath crossing river shoal encounters the conditions that the current of a cutterhead and a screw machine stays at a high level and the torque of the cutterhead and the screw machine is sharply increased, reasons should be checked in time by means of forward and reverse rotation of the cutterhead, forward and reverse rotation of screw machine blades and the like; s2, the water flow of the river shoal is small, treatment can be conducted in a local excavation mode, and river water is guided before local excavation; s3, excavating and cleaning soil, filled stones and the like in the soil covering range of the riverbed in front of the pipe jacking machine by adopting an excavator, wherein the excavating depth is the soil covering depth from the top of the pipe jacking machine t</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>GALLERIES</subject><subject>HYDRAULIC ENGINEERING</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>SOIL SHIFTING</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjDEOgkAQRWksjHqH8QAUSEK0NERjZWVPxmVgUdzZzAzewVu7Rg9g9ZL3f948e9Uc1GRyNnCAB5nnFjoWGFF6ypW-gyRi6Kdk4YbuPoQe4hAJptCSBELzEFH1480LT70HGZ4koJ5xBOPUJgO-qqEbSQFDC6QOU6NNZZJlNutwVFr9uMjWx8OlPuUUuSGN6CiQNfW5KKpyty2qzb785_MG0BhNfQ</recordid><startdate>20230707</startdate><enddate>20230707</enddate><creator>ZHANG ZHIHUA</creator><creator>GAO LEI</creator><creator>YANG XIAOJUN</creator><creator>QIN WEI</creator><creator>YANG HAO</creator><creator>LIN SHUO</creator><creator>LIN BINGCHENG</creator><creator>HU QIANHUA</creator><creator>LI YONGZHI</creator><creator>LI QIANG</creator><creator>YIN CHEN</creator><scope>EVB</scope></search><sort><creationdate>20230707</creationdate><title>Construction method for large-section rectangular jacking pipe underneath passing through river shoal to meet obstacles and escape danger</title><author>ZHANG ZHIHUA ; GAO LEI ; YANG XIAOJUN ; QIN WEI ; YANG HAO ; LIN SHUO ; LIN BINGCHENG ; HU QIANHUA ; LI YONGZHI ; LI QIANG ; YIN CHEN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116398162A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>GALLERIES</topic><topic>HYDRAULIC ENGINEERING</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>SOIL SHIFTING</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG ZHIHUA</creatorcontrib><creatorcontrib>GAO LEI</creatorcontrib><creatorcontrib>YANG XIAOJUN</creatorcontrib><creatorcontrib>QIN WEI</creatorcontrib><creatorcontrib>YANG HAO</creatorcontrib><creatorcontrib>LIN SHUO</creatorcontrib><creatorcontrib>LIN BINGCHENG</creatorcontrib><creatorcontrib>HU QIANHUA</creatorcontrib><creatorcontrib>LI YONGZHI</creatorcontrib><creatorcontrib>LI QIANG</creatorcontrib><creatorcontrib>YIN CHEN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG ZHIHUA</au><au>GAO LEI</au><au>YANG XIAOJUN</au><au>QIN WEI</au><au>YANG HAO</au><au>LIN SHUO</au><au>LIN BINGCHENG</au><au>HU QIANHUA</au><au>LI YONGZHI</au><au>LI QIANG</au><au>YIN CHEN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method for large-section rectangular jacking pipe underneath passing through river shoal to meet obstacles and escape danger</title><date>2023-07-07</date><risdate>2023</risdate><abstract>The invention discloses a large-section rectangular jacking pipe underneath crossing river shoal obstacle encountering and danger avoiding construction method which comprises the following steps: S1, when the rectangular jacking pipe underneath crossing river shoal encounters the conditions that the current of a cutterhead and a screw machine stays at a high level and the torque of the cutterhead and the screw machine is sharply increased, reasons should be checked in time by means of forward and reverse rotation of the cutterhead, forward and reverse rotation of screw machine blades and the like; s2, the water flow of the river shoal is small, treatment can be conducted in a local excavation mode, and river water is guided before local excavation; s3, excavating and cleaning soil, filled stones and the like in the soil covering range of the riverbed in front of the pipe jacking machine by adopting an excavator, wherein the excavating depth is the soil covering depth from the top of the pipe jacking machine t</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN116398162A |
source | esp@cenet |
subjects | EARTH DRILLING FIXED CONSTRUCTIONS FOUNDATIONS GALLERIES HYDRAULIC ENGINEERING LARGE UNDERGROUND CHAMBERS MINING SHAFTS SOIL SHIFTING TUNNELS |
title | Construction method for large-section rectangular jacking pipe underneath passing through river shoal to meet obstacles and escape danger |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-28T13%3A19%3A22IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20ZHIHUA&rft.date=2023-07-07&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116398162A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |