Construction method for steel sheet pile cofferdam in complex geology

The invention provides a complex geology steel sheet pile cofferdam construction method which comprises the following steps: surveying and setting out; steel sheet piles are inserted and driven through the steel casings until a cofferdam structure is formed by surrounding and folding; mucky soil in...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHU JIAHUAN, LIU ZHIYONG, LI QINGBIN, ZHANG XINSHENG, ZHOU HAIFENG, DING DEZHI, XU TIAN'AI, ZHU PINGHUA, YAN PENGMIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHU JIAHUAN
LIU ZHIYONG
LI QINGBIN
ZHANG XINSHENG
ZHOU HAIFENG
DING DEZHI
XU TIAN'AI
ZHU PINGHUA
YAN PENGMIN
description The invention provides a complex geology steel sheet pile cofferdam construction method which comprises the following steps: surveying and setting out; steel sheet piles are inserted and driven through the steel casings until a cofferdam structure is formed by surrounding and folding; mucky soil in a sludge area in the cofferdam structure is removed, and underwater bottom sealing pouring is conducted on the sludge area for the first time; after the first-time bottom sealing pouring reaches the design strength, layer-by-layer water pumping operation is conducted, and meanwhile a plurality of steel enclosing purlins and inner supports are installed layer by layer from top to bottom; after all the inner supports are installed, ground straining beams are excavated and poured in a segmented mode on the hard soil area in the cofferdam structure, remaining hard soil is excavated, secondary dry operation bottom sealing pouring is conducted on the hard soil area, and the construction procedure of bottom sealing with h
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116290042A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116290042A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116290042A3</originalsourceid><addsrcrecordid>eNrjZHB1zs8rLikqTS7JzM9TyE0tychPUUjLL1IoLklNzVEozkhNLVEoyMxJVUjOT0tLLUpJzFXIzANycgtyUisU0lPzc_LTK3kYWNMSc4pTeaE0N4Oim2uIs4duakF-fGpxQWJyal5qSbyzn6GhmZGlgYGJkaMxMWoAE60zXQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method for steel sheet pile cofferdam in complex geology</title><source>esp@cenet</source><creator>ZHU JIAHUAN ; LIU ZHIYONG ; LI QINGBIN ; ZHANG XINSHENG ; ZHOU HAIFENG ; DING DEZHI ; XU TIAN'AI ; ZHU PINGHUA ; YAN PENGMIN</creator><creatorcontrib>ZHU JIAHUAN ; LIU ZHIYONG ; LI QINGBIN ; ZHANG XINSHENG ; ZHOU HAIFENG ; DING DEZHI ; XU TIAN'AI ; ZHU PINGHUA ; YAN PENGMIN</creatorcontrib><description>The invention provides a complex geology steel sheet pile cofferdam construction method which comprises the following steps: surveying and setting out; steel sheet piles are inserted and driven through the steel casings until a cofferdam structure is formed by surrounding and folding; mucky soil in a sludge area in the cofferdam structure is removed, and underwater bottom sealing pouring is conducted on the sludge area for the first time; after the first-time bottom sealing pouring reaches the design strength, layer-by-layer water pumping operation is conducted, and meanwhile a plurality of steel enclosing purlins and inner supports are installed layer by layer from top to bottom; after all the inner supports are installed, ground straining beams are excavated and poured in a segmented mode on the hard soil area in the cofferdam structure, remaining hard soil is excavated, secondary dry operation bottom sealing pouring is conducted on the hard soil area, and the construction procedure of bottom sealing with h</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230623&amp;DB=EPODOC&amp;CC=CN&amp;NR=116290042A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230623&amp;DB=EPODOC&amp;CC=CN&amp;NR=116290042A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHU JIAHUAN</creatorcontrib><creatorcontrib>LIU ZHIYONG</creatorcontrib><creatorcontrib>LI QINGBIN</creatorcontrib><creatorcontrib>ZHANG XINSHENG</creatorcontrib><creatorcontrib>ZHOU HAIFENG</creatorcontrib><creatorcontrib>DING DEZHI</creatorcontrib><creatorcontrib>XU TIAN'AI</creatorcontrib><creatorcontrib>ZHU PINGHUA</creatorcontrib><creatorcontrib>YAN PENGMIN</creatorcontrib><title>Construction method for steel sheet pile cofferdam in complex geology</title><description>The invention provides a complex geology steel sheet pile cofferdam construction method which comprises the following steps: surveying and setting out; steel sheet piles are inserted and driven through the steel casings until a cofferdam structure is formed by surrounding and folding; mucky soil in a sludge area in the cofferdam structure is removed, and underwater bottom sealing pouring is conducted on the sludge area for the first time; after the first-time bottom sealing pouring reaches the design strength, layer-by-layer water pumping operation is conducted, and meanwhile a plurality of steel enclosing purlins and inner supports are installed layer by layer from top to bottom; after all the inner supports are installed, ground straining beams are excavated and poured in a segmented mode on the hard soil area in the cofferdam structure, remaining hard soil is excavated, secondary dry operation bottom sealing pouring is conducted on the hard soil area, and the construction procedure of bottom sealing with h</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHB1zs8rLikqTS7JzM9TyE0tychPUUjLL1IoLklNzVEozkhNLVEoyMxJVUjOT0tLLUpJzFXIzANycgtyUisU0lPzc_LTK3kYWNMSc4pTeaE0N4Oim2uIs4duakF-fGpxQWJyal5qSbyzn6GhmZGlgYGJkaMxMWoAE60zXQ</recordid><startdate>20230623</startdate><enddate>20230623</enddate><creator>ZHU JIAHUAN</creator><creator>LIU ZHIYONG</creator><creator>LI QINGBIN</creator><creator>ZHANG XINSHENG</creator><creator>ZHOU HAIFENG</creator><creator>DING DEZHI</creator><creator>XU TIAN'AI</creator><creator>ZHU PINGHUA</creator><creator>YAN PENGMIN</creator><scope>EVB</scope></search><sort><creationdate>20230623</creationdate><title>Construction method for steel sheet pile cofferdam in complex geology</title><author>ZHU JIAHUAN ; LIU ZHIYONG ; LI QINGBIN ; ZHANG XINSHENG ; ZHOU HAIFENG ; DING DEZHI ; XU TIAN'AI ; ZHU PINGHUA ; YAN PENGMIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116290042A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHU JIAHUAN</creatorcontrib><creatorcontrib>LIU ZHIYONG</creatorcontrib><creatorcontrib>LI QINGBIN</creatorcontrib><creatorcontrib>ZHANG XINSHENG</creatorcontrib><creatorcontrib>ZHOU HAIFENG</creatorcontrib><creatorcontrib>DING DEZHI</creatorcontrib><creatorcontrib>XU TIAN'AI</creatorcontrib><creatorcontrib>ZHU PINGHUA</creatorcontrib><creatorcontrib>YAN PENGMIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHU JIAHUAN</au><au>LIU ZHIYONG</au><au>LI QINGBIN</au><au>ZHANG XINSHENG</au><au>ZHOU HAIFENG</au><au>DING DEZHI</au><au>XU TIAN'AI</au><au>ZHU PINGHUA</au><au>YAN PENGMIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method for steel sheet pile cofferdam in complex geology</title><date>2023-06-23</date><risdate>2023</risdate><abstract>The invention provides a complex geology steel sheet pile cofferdam construction method which comprises the following steps: surveying and setting out; steel sheet piles are inserted and driven through the steel casings until a cofferdam structure is formed by surrounding and folding; mucky soil in a sludge area in the cofferdam structure is removed, and underwater bottom sealing pouring is conducted on the sludge area for the first time; after the first-time bottom sealing pouring reaches the design strength, layer-by-layer water pumping operation is conducted, and meanwhile a plurality of steel enclosing purlins and inner supports are installed layer by layer from top to bottom; after all the inner supports are installed, ground straining beams are excavated and poured in a segmented mode on the hard soil area in the cofferdam structure, remaining hard soil is excavated, secondary dry operation bottom sealing pouring is conducted on the hard soil area, and the construction procedure of bottom sealing with h</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN116290042A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Construction method for steel sheet pile cofferdam in complex geology
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-24T19%3A36%3A01IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHU%20JIAHUAN&rft.date=2023-06-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116290042A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true