Special-shaped main tower winter construction method
The invention discloses a special-shaped main tower winter construction method, a cable-stayed bridge main tower comprises a construction section, and the method comprises the following steps that formwork erecting is conducted on the construction section, a formwork of the construction section is f...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | SUN SHULIANG CHANG YUNCHAO DUAN FENG ZHU SIHAI XUE XIAOHONG KANG SHIZUN BAI JUNQIANG ZHU JIANFENG SUN QUANYONG HOU HONGJIANG HUANG ZHENGYE LI ZHAOKUN |
description | The invention discloses a special-shaped main tower winter construction method, a cable-stayed bridge main tower comprises a construction section, and the method comprises the following steps that formwork erecting is conducted on the construction section, a formwork of the construction section is formed, and a heat preservation body and a heating assembly are installed on the periphery of the formwork of the construction section; forming tower column sections; arranging a first temperature measuring device at the tower column section to obtain a first temperature parameter; installing a second temperature measuring device in the thermal insulation body to obtain a second temperature parameter; a micro intelligent electric boiler is used for supplying heat to the interior of the heat preservation body; and according to the first temperature parameter and the second temperature parameter, the steam curing stage of the concrete in the formwork of the construction section is controlled. By means of the first tem |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116289586A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116289586A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116289586A3</originalsourceid><addsrcrecordid>eNrjZDAJLkhNzkzM0S3OSCxITVHITczMUyjJL08tUijPzCsBUsn5ecUlRaXJJZn5eQq5qSUZ-Sk8DKxpiTnFqbxQmptB0c01xNlDN7UgPz61uCAxOTUvtSTe2c_Q0MzIwtLUwszRmBg1AF7JLVU</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Special-shaped main tower winter construction method</title><source>esp@cenet</source><creator>SUN SHULIANG ; CHANG YUNCHAO ; DUAN FENG ; ZHU SIHAI ; XUE XIAOHONG ; KANG SHIZUN ; BAI JUNQIANG ; ZHU JIANFENG ; SUN QUANYONG ; HOU HONGJIANG ; HUANG ZHENGYE ; LI ZHAOKUN</creator><creatorcontrib>SUN SHULIANG ; CHANG YUNCHAO ; DUAN FENG ; ZHU SIHAI ; XUE XIAOHONG ; KANG SHIZUN ; BAI JUNQIANG ; ZHU JIANFENG ; SUN QUANYONG ; HOU HONGJIANG ; HUANG ZHENGYE ; LI ZHAOKUN</creatorcontrib><description>The invention discloses a special-shaped main tower winter construction method, a cable-stayed bridge main tower comprises a construction section, and the method comprises the following steps that formwork erecting is conducted on the construction section, a formwork of the construction section is formed, and a heat preservation body and a heating assembly are installed on the periphery of the formwork of the construction section; forming tower column sections; arranging a first temperature measuring device at the tower column section to obtain a first temperature parameter; installing a second temperature measuring device in the thermal insulation body to obtain a second temperature parameter; a micro intelligent electric boiler is used for supplying heat to the interior of the heat preservation body; and according to the first temperature parameter and the second temperature parameter, the steam curing stage of the concrete in the formwork of the construction section is controlled. By means of the first tem</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230623&DB=EPODOC&CC=CN&NR=116289586A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230623&DB=EPODOC&CC=CN&NR=116289586A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SUN SHULIANG</creatorcontrib><creatorcontrib>CHANG YUNCHAO</creatorcontrib><creatorcontrib>DUAN FENG</creatorcontrib><creatorcontrib>ZHU SIHAI</creatorcontrib><creatorcontrib>XUE XIAOHONG</creatorcontrib><creatorcontrib>KANG SHIZUN</creatorcontrib><creatorcontrib>BAI JUNQIANG</creatorcontrib><creatorcontrib>ZHU JIANFENG</creatorcontrib><creatorcontrib>SUN QUANYONG</creatorcontrib><creatorcontrib>HOU HONGJIANG</creatorcontrib><creatorcontrib>HUANG ZHENGYE</creatorcontrib><creatorcontrib>LI ZHAOKUN</creatorcontrib><title>Special-shaped main tower winter construction method</title><description>The invention discloses a special-shaped main tower winter construction method, a cable-stayed bridge main tower comprises a construction section, and the method comprises the following steps that formwork erecting is conducted on the construction section, a formwork of the construction section is formed, and a heat preservation body and a heating assembly are installed on the periphery of the formwork of the construction section; forming tower column sections; arranging a first temperature measuring device at the tower column section to obtain a first temperature parameter; installing a second temperature measuring device in the thermal insulation body to obtain a second temperature parameter; a micro intelligent electric boiler is used for supplying heat to the interior of the heat preservation body; and according to the first temperature parameter and the second temperature parameter, the steam curing stage of the concrete in the formwork of the construction section is controlled. By means of the first tem</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDAJLkhNzkzM0S3OSCxITVHITczMUyjJL08tUijPzCsBUsn5ecUlRaXJJZn5eQq5qSUZ-Sk8DKxpiTnFqbxQmptB0c01xNlDN7UgPz61uCAxOTUvtSTe2c_Q0MzIwtLUwszRmBg1AF7JLVU</recordid><startdate>20230623</startdate><enddate>20230623</enddate><creator>SUN SHULIANG</creator><creator>CHANG YUNCHAO</creator><creator>DUAN FENG</creator><creator>ZHU SIHAI</creator><creator>XUE XIAOHONG</creator><creator>KANG SHIZUN</creator><creator>BAI JUNQIANG</creator><creator>ZHU JIANFENG</creator><creator>SUN QUANYONG</creator><creator>HOU HONGJIANG</creator><creator>HUANG ZHENGYE</creator><creator>LI ZHAOKUN</creator><scope>EVB</scope></search><sort><creationdate>20230623</creationdate><title>Special-shaped main tower winter construction method</title><author>SUN SHULIANG ; CHANG YUNCHAO ; DUAN FENG ; ZHU SIHAI ; XUE XIAOHONG ; KANG SHIZUN ; BAI JUNQIANG ; ZHU JIANFENG ; SUN QUANYONG ; HOU HONGJIANG ; HUANG ZHENGYE ; LI ZHAOKUN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116289586A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>SUN SHULIANG</creatorcontrib><creatorcontrib>CHANG YUNCHAO</creatorcontrib><creatorcontrib>DUAN FENG</creatorcontrib><creatorcontrib>ZHU SIHAI</creatorcontrib><creatorcontrib>XUE XIAOHONG</creatorcontrib><creatorcontrib>KANG SHIZUN</creatorcontrib><creatorcontrib>BAI JUNQIANG</creatorcontrib><creatorcontrib>ZHU JIANFENG</creatorcontrib><creatorcontrib>SUN QUANYONG</creatorcontrib><creatorcontrib>HOU HONGJIANG</creatorcontrib><creatorcontrib>HUANG ZHENGYE</creatorcontrib><creatorcontrib>LI ZHAOKUN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SUN SHULIANG</au><au>CHANG YUNCHAO</au><au>DUAN FENG</au><au>ZHU SIHAI</au><au>XUE XIAOHONG</au><au>KANG SHIZUN</au><au>BAI JUNQIANG</au><au>ZHU JIANFENG</au><au>SUN QUANYONG</au><au>HOU HONGJIANG</au><au>HUANG ZHENGYE</au><au>LI ZHAOKUN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Special-shaped main tower winter construction method</title><date>2023-06-23</date><risdate>2023</risdate><abstract>The invention discloses a special-shaped main tower winter construction method, a cable-stayed bridge main tower comprises a construction section, and the method comprises the following steps that formwork erecting is conducted on the construction section, a formwork of the construction section is formed, and a heat preservation body and a heating assembly are installed on the periphery of the formwork of the construction section; forming tower column sections; arranging a first temperature measuring device at the tower column section to obtain a first temperature parameter; installing a second temperature measuring device in the thermal insulation body to obtain a second temperature parameter; a micro intelligent electric boiler is used for supplying heat to the interior of the heat preservation body; and according to the first temperature parameter and the second temperature parameter, the steam curing stage of the concrete in the formwork of the construction section is controlled. By means of the first tem</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN116289586A |
source | esp@cenet |
subjects | ASSEMBLY OF BRIDGES CONSTRUCTION OF BRIDGES CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES FIXED CONSTRUCTIONS OR VIADUCTS |
title | Special-shaped main tower winter construction method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-06T17%3A33%3A18IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SUN%20SHULIANG&rft.date=2023-06-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116289586A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |