Construction method for double-sliding installation of super-tonnage spherical support of high-speed railway
The invention provides a construction method for double-sliding installation of a super-tonnage spherical support of a high-speed railway. The construction method comprises the following construction steps that scabbling is conducted on the contact face of the top of a support padstone, and the cent...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | TIAN FEIHU LYU CHAO DU YILING WANG SHENGLI GUO ZHIQI ZHANG CHANGXUAN ZHAO XIAODONG LI GUOPING HAN KAIKAI LI CHAO ZHANG JINWANG WANG GUANGSONG DUAN CHANGXIN |
description | The invention provides a construction method for double-sliding installation of a super-tonnage spherical support of a high-speed railway. The construction method comprises the following construction steps that scabbling is conducted on the contact face of the top of a support padstone, and the center line of the support is drawn; mounting a cushion stone top fine flat steel plate; installing a transverse sliding I-shaped steel beam, and fixing the transverse sliding I-shaped steel beam with a pier top embedded bolt; a double-spliced transverse sliding bailey beam is installed, the double-spliced bailey beam is assembled on the pier top, four I-shaped steel bolts are connected to form a frame beam, and the rear portion of the frame beam is anchored to the pier top embedded bolts; mounting a bailey beam top longitudinal sliding lifting frame and a lifting system; the support is placed on a pier bottom lifting platform, and the support is lifted to the position above the top elevation of a padstone through a li |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116289584A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116289584A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116289584A3</originalsourceid><addsrcrecordid>eNqNyk0KwjAQQOFuXIh6h_EAWdQ_2qUUxZUr92Vsps3AmAlJinh7rXgAVw8e37yQRn3Kcewyq4cHZacWeo1gdbwLmSRs2Q_AH4Ui-GXaQxoDRZPVexwIUnAUuUOZftCYJ-J4cCYFIgsRWZ74WhazHiXR6tdFsT6fbs3FUNCWUsCOPOW2uZblYVPV-2p33P5j3sJCQuM</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method for double-sliding installation of super-tonnage spherical support of high-speed railway</title><source>esp@cenet</source><creator>TIAN FEIHU ; LYU CHAO ; DU YILING ; WANG SHENGLI ; GUO ZHIQI ; ZHANG CHANGXUAN ; ZHAO XIAODONG ; LI GUOPING ; HAN KAIKAI ; LI CHAO ; ZHANG JINWANG ; WANG GUANGSONG ; DUAN CHANGXIN</creator><creatorcontrib>TIAN FEIHU ; LYU CHAO ; DU YILING ; WANG SHENGLI ; GUO ZHIQI ; ZHANG CHANGXUAN ; ZHAO XIAODONG ; LI GUOPING ; HAN KAIKAI ; LI CHAO ; ZHANG JINWANG ; WANG GUANGSONG ; DUAN CHANGXIN</creatorcontrib><description>The invention provides a construction method for double-sliding installation of a super-tonnage spherical support of a high-speed railway. The construction method comprises the following construction steps that scabbling is conducted on the contact face of the top of a support padstone, and the center line of the support is drawn; mounting a cushion stone top fine flat steel plate; installing a transverse sliding I-shaped steel beam, and fixing the transverse sliding I-shaped steel beam with a pier top embedded bolt; a double-spliced transverse sliding bailey beam is installed, the double-spliced bailey beam is assembled on the pier top, four I-shaped steel bolts are connected to form a frame beam, and the rear portion of the frame beam is anchored to the pier top embedded bolts; mounting a bailey beam top longitudinal sliding lifting frame and a lifting system; the support is placed on a pier bottom lifting platform, and the support is lifted to the position above the top elevation of a padstone through a li</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230623&DB=EPODOC&CC=CN&NR=116289584A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230623&DB=EPODOC&CC=CN&NR=116289584A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>TIAN FEIHU</creatorcontrib><creatorcontrib>LYU CHAO</creatorcontrib><creatorcontrib>DU YILING</creatorcontrib><creatorcontrib>WANG SHENGLI</creatorcontrib><creatorcontrib>GUO ZHIQI</creatorcontrib><creatorcontrib>ZHANG CHANGXUAN</creatorcontrib><creatorcontrib>ZHAO XIAODONG</creatorcontrib><creatorcontrib>LI GUOPING</creatorcontrib><creatorcontrib>HAN KAIKAI</creatorcontrib><creatorcontrib>LI CHAO</creatorcontrib><creatorcontrib>ZHANG JINWANG</creatorcontrib><creatorcontrib>WANG GUANGSONG</creatorcontrib><creatorcontrib>DUAN CHANGXIN</creatorcontrib><title>Construction method for double-sliding installation of super-tonnage spherical support of high-speed railway</title><description>The invention provides a construction method for double-sliding installation of a super-tonnage spherical support of a high-speed railway. The construction method comprises the following construction steps that scabbling is conducted on the contact face of the top of a support padstone, and the center line of the support is drawn; mounting a cushion stone top fine flat steel plate; installing a transverse sliding I-shaped steel beam, and fixing the transverse sliding I-shaped steel beam with a pier top embedded bolt; a double-spliced transverse sliding bailey beam is installed, the double-spliced bailey beam is assembled on the pier top, four I-shaped steel bolts are connected to form a frame beam, and the rear portion of the frame beam is anchored to the pier top embedded bolts; mounting a bailey beam top longitudinal sliding lifting frame and a lifting system; the support is placed on a pier bottom lifting platform, and the support is lifted to the position above the top elevation of a padstone through a li</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyk0KwjAQQOFuXIh6h_EAWdQ_2qUUxZUr92Vsps3AmAlJinh7rXgAVw8e37yQRn3Kcewyq4cHZacWeo1gdbwLmSRs2Q_AH4Ui-GXaQxoDRZPVexwIUnAUuUOZftCYJ-J4cCYFIgsRWZ74WhazHiXR6tdFsT6fbs3FUNCWUsCOPOW2uZblYVPV-2p33P5j3sJCQuM</recordid><startdate>20230623</startdate><enddate>20230623</enddate><creator>TIAN FEIHU</creator><creator>LYU CHAO</creator><creator>DU YILING</creator><creator>WANG SHENGLI</creator><creator>GUO ZHIQI</creator><creator>ZHANG CHANGXUAN</creator><creator>ZHAO XIAODONG</creator><creator>LI GUOPING</creator><creator>HAN KAIKAI</creator><creator>LI CHAO</creator><creator>ZHANG JINWANG</creator><creator>WANG GUANGSONG</creator><creator>DUAN CHANGXIN</creator><scope>EVB</scope></search><sort><creationdate>20230623</creationdate><title>Construction method for double-sliding installation of super-tonnage spherical support of high-speed railway</title><author>TIAN FEIHU ; LYU CHAO ; DU YILING ; WANG SHENGLI ; GUO ZHIQI ; ZHANG CHANGXUAN ; ZHAO XIAODONG ; LI GUOPING ; HAN KAIKAI ; LI CHAO ; ZHANG JINWANG ; WANG GUANGSONG ; DUAN CHANGXIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116289584A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>TIAN FEIHU</creatorcontrib><creatorcontrib>LYU CHAO</creatorcontrib><creatorcontrib>DU YILING</creatorcontrib><creatorcontrib>WANG SHENGLI</creatorcontrib><creatorcontrib>GUO ZHIQI</creatorcontrib><creatorcontrib>ZHANG CHANGXUAN</creatorcontrib><creatorcontrib>ZHAO XIAODONG</creatorcontrib><creatorcontrib>LI GUOPING</creatorcontrib><creatorcontrib>HAN KAIKAI</creatorcontrib><creatorcontrib>LI CHAO</creatorcontrib><creatorcontrib>ZHANG JINWANG</creatorcontrib><creatorcontrib>WANG GUANGSONG</creatorcontrib><creatorcontrib>DUAN CHANGXIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>TIAN FEIHU</au><au>LYU CHAO</au><au>DU YILING</au><au>WANG SHENGLI</au><au>GUO ZHIQI</au><au>ZHANG CHANGXUAN</au><au>ZHAO XIAODONG</au><au>LI GUOPING</au><au>HAN KAIKAI</au><au>LI CHAO</au><au>ZHANG JINWANG</au><au>WANG GUANGSONG</au><au>DUAN CHANGXIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method for double-sliding installation of super-tonnage spherical support of high-speed railway</title><date>2023-06-23</date><risdate>2023</risdate><abstract>The invention provides a construction method for double-sliding installation of a super-tonnage spherical support of a high-speed railway. The construction method comprises the following construction steps that scabbling is conducted on the contact face of the top of a support padstone, and the center line of the support is drawn; mounting a cushion stone top fine flat steel plate; installing a transverse sliding I-shaped steel beam, and fixing the transverse sliding I-shaped steel beam with a pier top embedded bolt; a double-spliced transverse sliding bailey beam is installed, the double-spliced bailey beam is assembled on the pier top, four I-shaped steel bolts are connected to form a frame beam, and the rear portion of the frame beam is anchored to the pier top embedded bolts; mounting a bailey beam top longitudinal sliding lifting frame and a lifting system; the support is placed on a pier bottom lifting platform, and the support is lifted to the position above the top elevation of a padstone through a li</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN116289584A |
source | esp@cenet |
subjects | ASSEMBLY OF BRIDGES CONSTRUCTION OF BRIDGES CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES FIXED CONSTRUCTIONS OR VIADUCTS |
title | Construction method for double-sliding installation of super-tonnage spherical support of high-speed railway |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T08%3A38%3A11IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=TIAN%20FEIHU&rft.date=2023-06-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116289584A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |