Construction method for double-sliding installation of super-tonnage spherical support of high-speed railway

The invention provides a construction method for double-sliding installation of a super-tonnage spherical support of a high-speed railway. The construction method comprises the following construction steps that scabbling is conducted on the contact face of the top of a support padstone, and the cent...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: TIAN FEIHU, LYU CHAO, DU YILING, WANG SHENGLI, GUO ZHIQI, ZHANG CHANGXUAN, ZHAO XIAODONG, LI GUOPING, HAN KAIKAI, LI CHAO, ZHANG JINWANG, WANG GUANGSONG, DUAN CHANGXIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator TIAN FEIHU
LYU CHAO
DU YILING
WANG SHENGLI
GUO ZHIQI
ZHANG CHANGXUAN
ZHAO XIAODONG
LI GUOPING
HAN KAIKAI
LI CHAO
ZHANG JINWANG
WANG GUANGSONG
DUAN CHANGXIN
description The invention provides a construction method for double-sliding installation of a super-tonnage spherical support of a high-speed railway. The construction method comprises the following construction steps that scabbling is conducted on the contact face of the top of a support padstone, and the center line of the support is drawn; mounting a cushion stone top fine flat steel plate; installing a transverse sliding I-shaped steel beam, and fixing the transverse sliding I-shaped steel beam with a pier top embedded bolt; a double-spliced transverse sliding bailey beam is installed, the double-spliced bailey beam is assembled on the pier top, four I-shaped steel bolts are connected to form a frame beam, and the rear portion of the frame beam is anchored to the pier top embedded bolts; mounting a bailey beam top longitudinal sliding lifting frame and a lifting system; the support is placed on a pier bottom lifting platform, and the support is lifted to the position above the top elevation of a padstone through a li
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116289584A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116289584A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116289584A3</originalsourceid><addsrcrecordid>eNqNyk0KwjAQQOFuXIh6h_EAWdQ_2qUUxZUr92Vsps3AmAlJinh7rXgAVw8e37yQRn3Kcewyq4cHZacWeo1gdbwLmSRs2Q_AH4Ui-GXaQxoDRZPVexwIUnAUuUOZftCYJ-J4cCYFIgsRWZ74WhazHiXR6tdFsT6fbs3FUNCWUsCOPOW2uZblYVPV-2p33P5j3sJCQuM</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method for double-sliding installation of super-tonnage spherical support of high-speed railway</title><source>esp@cenet</source><creator>TIAN FEIHU ; LYU CHAO ; DU YILING ; WANG SHENGLI ; GUO ZHIQI ; ZHANG CHANGXUAN ; ZHAO XIAODONG ; LI GUOPING ; HAN KAIKAI ; LI CHAO ; ZHANG JINWANG ; WANG GUANGSONG ; DUAN CHANGXIN</creator><creatorcontrib>TIAN FEIHU ; LYU CHAO ; DU YILING ; WANG SHENGLI ; GUO ZHIQI ; ZHANG CHANGXUAN ; ZHAO XIAODONG ; LI GUOPING ; HAN KAIKAI ; LI CHAO ; ZHANG JINWANG ; WANG GUANGSONG ; DUAN CHANGXIN</creatorcontrib><description>The invention provides a construction method for double-sliding installation of a super-tonnage spherical support of a high-speed railway. The construction method comprises the following construction steps that scabbling is conducted on the contact face of the top of a support padstone, and the center line of the support is drawn; mounting a cushion stone top fine flat steel plate; installing a transverse sliding I-shaped steel beam, and fixing the transverse sliding I-shaped steel beam with a pier top embedded bolt; a double-spliced transverse sliding bailey beam is installed, the double-spliced bailey beam is assembled on the pier top, four I-shaped steel bolts are connected to form a frame beam, and the rear portion of the frame beam is anchored to the pier top embedded bolts; mounting a bailey beam top longitudinal sliding lifting frame and a lifting system; the support is placed on a pier bottom lifting platform, and the support is lifted to the position above the top elevation of a padstone through a li</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230623&amp;DB=EPODOC&amp;CC=CN&amp;NR=116289584A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230623&amp;DB=EPODOC&amp;CC=CN&amp;NR=116289584A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>TIAN FEIHU</creatorcontrib><creatorcontrib>LYU CHAO</creatorcontrib><creatorcontrib>DU YILING</creatorcontrib><creatorcontrib>WANG SHENGLI</creatorcontrib><creatorcontrib>GUO ZHIQI</creatorcontrib><creatorcontrib>ZHANG CHANGXUAN</creatorcontrib><creatorcontrib>ZHAO XIAODONG</creatorcontrib><creatorcontrib>LI GUOPING</creatorcontrib><creatorcontrib>HAN KAIKAI</creatorcontrib><creatorcontrib>LI CHAO</creatorcontrib><creatorcontrib>ZHANG JINWANG</creatorcontrib><creatorcontrib>WANG GUANGSONG</creatorcontrib><creatorcontrib>DUAN CHANGXIN</creatorcontrib><title>Construction method for double-sliding installation of super-tonnage spherical support of high-speed railway</title><description>The invention provides a construction method for double-sliding installation of a super-tonnage spherical support of a high-speed railway. The construction method comprises the following construction steps that scabbling is conducted on the contact face of the top of a support padstone, and the center line of the support is drawn; mounting a cushion stone top fine flat steel plate; installing a transverse sliding I-shaped steel beam, and fixing the transverse sliding I-shaped steel beam with a pier top embedded bolt; a double-spliced transverse sliding bailey beam is installed, the double-spliced bailey beam is assembled on the pier top, four I-shaped steel bolts are connected to form a frame beam, and the rear portion of the frame beam is anchored to the pier top embedded bolts; mounting a bailey beam top longitudinal sliding lifting frame and a lifting system; the support is placed on a pier bottom lifting platform, and the support is lifted to the position above the top elevation of a padstone through a li</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyk0KwjAQQOFuXIh6h_EAWdQ_2qUUxZUr92Vsps3AmAlJinh7rXgAVw8e37yQRn3Kcewyq4cHZacWeo1gdbwLmSRs2Q_AH4Ui-GXaQxoDRZPVexwIUnAUuUOZftCYJ-J4cCYFIgsRWZ74WhazHiXR6tdFsT6fbs3FUNCWUsCOPOW2uZblYVPV-2p33P5j3sJCQuM</recordid><startdate>20230623</startdate><enddate>20230623</enddate><creator>TIAN FEIHU</creator><creator>LYU CHAO</creator><creator>DU YILING</creator><creator>WANG SHENGLI</creator><creator>GUO ZHIQI</creator><creator>ZHANG CHANGXUAN</creator><creator>ZHAO XIAODONG</creator><creator>LI GUOPING</creator><creator>HAN KAIKAI</creator><creator>LI CHAO</creator><creator>ZHANG JINWANG</creator><creator>WANG GUANGSONG</creator><creator>DUAN CHANGXIN</creator><scope>EVB</scope></search><sort><creationdate>20230623</creationdate><title>Construction method for double-sliding installation of super-tonnage spherical support of high-speed railway</title><author>TIAN FEIHU ; LYU CHAO ; DU YILING ; WANG SHENGLI ; GUO ZHIQI ; ZHANG CHANGXUAN ; ZHAO XIAODONG ; LI GUOPING ; HAN KAIKAI ; LI CHAO ; ZHANG JINWANG ; WANG GUANGSONG ; DUAN CHANGXIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116289584A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>TIAN FEIHU</creatorcontrib><creatorcontrib>LYU CHAO</creatorcontrib><creatorcontrib>DU YILING</creatorcontrib><creatorcontrib>WANG SHENGLI</creatorcontrib><creatorcontrib>GUO ZHIQI</creatorcontrib><creatorcontrib>ZHANG CHANGXUAN</creatorcontrib><creatorcontrib>ZHAO XIAODONG</creatorcontrib><creatorcontrib>LI GUOPING</creatorcontrib><creatorcontrib>HAN KAIKAI</creatorcontrib><creatorcontrib>LI CHAO</creatorcontrib><creatorcontrib>ZHANG JINWANG</creatorcontrib><creatorcontrib>WANG GUANGSONG</creatorcontrib><creatorcontrib>DUAN CHANGXIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>TIAN FEIHU</au><au>LYU CHAO</au><au>DU YILING</au><au>WANG SHENGLI</au><au>GUO ZHIQI</au><au>ZHANG CHANGXUAN</au><au>ZHAO XIAODONG</au><au>LI GUOPING</au><au>HAN KAIKAI</au><au>LI CHAO</au><au>ZHANG JINWANG</au><au>WANG GUANGSONG</au><au>DUAN CHANGXIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method for double-sliding installation of super-tonnage spherical support of high-speed railway</title><date>2023-06-23</date><risdate>2023</risdate><abstract>The invention provides a construction method for double-sliding installation of a super-tonnage spherical support of a high-speed railway. The construction method comprises the following construction steps that scabbling is conducted on the contact face of the top of a support padstone, and the center line of the support is drawn; mounting a cushion stone top fine flat steel plate; installing a transverse sliding I-shaped steel beam, and fixing the transverse sliding I-shaped steel beam with a pier top embedded bolt; a double-spliced transverse sliding bailey beam is installed, the double-spliced bailey beam is assembled on the pier top, four I-shaped steel bolts are connected to form a frame beam, and the rear portion of the frame beam is anchored to the pier top embedded bolts; mounting a bailey beam top longitudinal sliding lifting frame and a lifting system; the support is placed on a pier bottom lifting platform, and the support is lifted to the position above the top elevation of a padstone through a li</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN116289584A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Construction method for double-sliding installation of super-tonnage spherical support of high-speed railway
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T08%3A38%3A11IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=TIAN%20FEIHU&rft.date=2023-06-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116289584A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true