Double-column construction hoist and hoist control method
The invention discloses a double-column construction elevator and an elevator control method, and belongs to the field of elevators, the double-column construction elevator comprises two frame bodies and a suspension cage arranged between the two frame bodies, the frame bodies are provided with vert...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | HUANG YUZHEN LI YAODONG XU YIQING ZHENG FEIXIONG |
description | The invention discloses a double-column construction elevator and an elevator control method, and belongs to the field of elevators, the double-column construction elevator comprises two frame bodies and a suspension cage arranged between the two frame bodies, the frame bodies are provided with vertically arranged racks, and a driving assembly is arranged between each frame body and the suspension cage; the driving assembly comprises a first sliding frame and a second sliding frame, the first sliding frame and the second sliding frame are arranged on the frame body in a sliding mode in the vertical direction, the cage is connected with the second sliding frame, the first sliding frame is provided with a power gear and a motor used for driving the power gear, and the power gear is meshed with the rack; an elastic component is connected between the first sliding frame and the second sliding frame. The frame body does not need to bear larger bending moment, so that the loading weight of the construction hoist is |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116281464A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116281464A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116281464A3</originalsourceid><addsrcrecordid>eNrjZLB0yS9NyknVTc7PKc3NU0jOzysuKSpNLsnMz1PIyM8sLlFIzEuBsoCSJUX5OQq5qSUZ-Sk8DKxpiTnFqbxQmptB0c01xNlDN7UgPz61uCAxOTUvtSTe2c_Q0MzIwtDEzMTRmBg1AHl2LyY</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Double-column construction hoist and hoist control method</title><source>esp@cenet</source><creator>HUANG YUZHEN ; LI YAODONG ; XU YIQING ; ZHENG FEIXIONG</creator><creatorcontrib>HUANG YUZHEN ; LI YAODONG ; XU YIQING ; ZHENG FEIXIONG</creatorcontrib><description>The invention discloses a double-column construction elevator and an elevator control method, and belongs to the field of elevators, the double-column construction elevator comprises two frame bodies and a suspension cage arranged between the two frame bodies, the frame bodies are provided with vertically arranged racks, and a driving assembly is arranged between each frame body and the suspension cage; the driving assembly comprises a first sliding frame and a second sliding frame, the first sliding frame and the second sliding frame are arranged on the frame body in a sliding mode in the vertical direction, the cage is connected with the second sliding frame, the first sliding frame is provided with a power gear and a motor used for driving the power gear, and the power gear is meshed with the rack; an elastic component is connected between the first sliding frame and the second sliding frame. The frame body does not need to bear larger bending moment, so that the loading weight of the construction hoist is</description><language>chi ; eng</language><subject>ELEVATORS ; ESCALATORS OR MOVING WALKWAYS ; HAULING ; HOISTING ; LIFTING ; PERFORMING OPERATIONS ; TRANSPORTING</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230623&DB=EPODOC&CC=CN&NR=116281464A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230623&DB=EPODOC&CC=CN&NR=116281464A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>HUANG YUZHEN</creatorcontrib><creatorcontrib>LI YAODONG</creatorcontrib><creatorcontrib>XU YIQING</creatorcontrib><creatorcontrib>ZHENG FEIXIONG</creatorcontrib><title>Double-column construction hoist and hoist control method</title><description>The invention discloses a double-column construction elevator and an elevator control method, and belongs to the field of elevators, the double-column construction elevator comprises two frame bodies and a suspension cage arranged between the two frame bodies, the frame bodies are provided with vertically arranged racks, and a driving assembly is arranged between each frame body and the suspension cage; the driving assembly comprises a first sliding frame and a second sliding frame, the first sliding frame and the second sliding frame are arranged on the frame body in a sliding mode in the vertical direction, the cage is connected with the second sliding frame, the first sliding frame is provided with a power gear and a motor used for driving the power gear, and the power gear is meshed with the rack; an elastic component is connected between the first sliding frame and the second sliding frame. The frame body does not need to bear larger bending moment, so that the loading weight of the construction hoist is</description><subject>ELEVATORS</subject><subject>ESCALATORS OR MOVING WALKWAYS</subject><subject>HAULING</subject><subject>HOISTING</subject><subject>LIFTING</subject><subject>PERFORMING OPERATIONS</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLB0yS9NyknVTc7PKc3NU0jOzysuKSpNLsnMz1PIyM8sLlFIzEuBsoCSJUX5OQq5qSUZ-Sk8DKxpiTnFqbxQmptB0c01xNlDN7UgPz61uCAxOTUvtSTe2c_Q0MzIwtDEzMTRmBg1AHl2LyY</recordid><startdate>20230623</startdate><enddate>20230623</enddate><creator>HUANG YUZHEN</creator><creator>LI YAODONG</creator><creator>XU YIQING</creator><creator>ZHENG FEIXIONG</creator><scope>EVB</scope></search><sort><creationdate>20230623</creationdate><title>Double-column construction hoist and hoist control method</title><author>HUANG YUZHEN ; LI YAODONG ; XU YIQING ; ZHENG FEIXIONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116281464A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ELEVATORS</topic><topic>ESCALATORS OR MOVING WALKWAYS</topic><topic>HAULING</topic><topic>HOISTING</topic><topic>LIFTING</topic><topic>PERFORMING OPERATIONS</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>HUANG YUZHEN</creatorcontrib><creatorcontrib>LI YAODONG</creatorcontrib><creatorcontrib>XU YIQING</creatorcontrib><creatorcontrib>ZHENG FEIXIONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>HUANG YUZHEN</au><au>LI YAODONG</au><au>XU YIQING</au><au>ZHENG FEIXIONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Double-column construction hoist and hoist control method</title><date>2023-06-23</date><risdate>2023</risdate><abstract>The invention discloses a double-column construction elevator and an elevator control method, and belongs to the field of elevators, the double-column construction elevator comprises two frame bodies and a suspension cage arranged between the two frame bodies, the frame bodies are provided with vertically arranged racks, and a driving assembly is arranged between each frame body and the suspension cage; the driving assembly comprises a first sliding frame and a second sliding frame, the first sliding frame and the second sliding frame are arranged on the frame body in a sliding mode in the vertical direction, the cage is connected with the second sliding frame, the first sliding frame is provided with a power gear and a motor used for driving the power gear, and the power gear is meshed with the rack; an elastic component is connected between the first sliding frame and the second sliding frame. The frame body does not need to bear larger bending moment, so that the loading weight of the construction hoist is</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN116281464A |
source | esp@cenet |
subjects | ELEVATORS ESCALATORS OR MOVING WALKWAYS HAULING HOISTING LIFTING PERFORMING OPERATIONS TRANSPORTING |
title | Double-column construction hoist and hoist control method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-28T19%3A40%3A35IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=HUANG%20YUZHEN&rft.date=2023-06-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116281464A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |