Double-column construction hoist and hoist control method

The invention discloses a double-column construction elevator and an elevator control method, and belongs to the field of elevators, the double-column construction elevator comprises two frame bodies and a suspension cage arranged between the two frame bodies, the frame bodies are provided with vert...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HUANG YUZHEN, LI YAODONG, XU YIQING, ZHENG FEIXIONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator HUANG YUZHEN
LI YAODONG
XU YIQING
ZHENG FEIXIONG
description The invention discloses a double-column construction elevator and an elevator control method, and belongs to the field of elevators, the double-column construction elevator comprises two frame bodies and a suspension cage arranged between the two frame bodies, the frame bodies are provided with vertically arranged racks, and a driving assembly is arranged between each frame body and the suspension cage; the driving assembly comprises a first sliding frame and a second sliding frame, the first sliding frame and the second sliding frame are arranged on the frame body in a sliding mode in the vertical direction, the cage is connected with the second sliding frame, the first sliding frame is provided with a power gear and a motor used for driving the power gear, and the power gear is meshed with the rack; an elastic component is connected between the first sliding frame and the second sliding frame. The frame body does not need to bear larger bending moment, so that the loading weight of the construction hoist is
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116281464A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116281464A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116281464A3</originalsourceid><addsrcrecordid>eNrjZLB0yS9NyknVTc7PKc3NU0jOzysuKSpNLsnMz1PIyM8sLlFIzEuBsoCSJUX5OQq5qSUZ-Sk8DKxpiTnFqbxQmptB0c01xNlDN7UgPz61uCAxOTUvtSTe2c_Q0MzIwtDEzMTRmBg1AHl2LyY</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Double-column construction hoist and hoist control method</title><source>esp@cenet</source><creator>HUANG YUZHEN ; LI YAODONG ; XU YIQING ; ZHENG FEIXIONG</creator><creatorcontrib>HUANG YUZHEN ; LI YAODONG ; XU YIQING ; ZHENG FEIXIONG</creatorcontrib><description>The invention discloses a double-column construction elevator and an elevator control method, and belongs to the field of elevators, the double-column construction elevator comprises two frame bodies and a suspension cage arranged between the two frame bodies, the frame bodies are provided with vertically arranged racks, and a driving assembly is arranged between each frame body and the suspension cage; the driving assembly comprises a first sliding frame and a second sliding frame, the first sliding frame and the second sliding frame are arranged on the frame body in a sliding mode in the vertical direction, the cage is connected with the second sliding frame, the first sliding frame is provided with a power gear and a motor used for driving the power gear, and the power gear is meshed with the rack; an elastic component is connected between the first sliding frame and the second sliding frame. The frame body does not need to bear larger bending moment, so that the loading weight of the construction hoist is</description><language>chi ; eng</language><subject>ELEVATORS ; ESCALATORS OR MOVING WALKWAYS ; HAULING ; HOISTING ; LIFTING ; PERFORMING OPERATIONS ; TRANSPORTING</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230623&amp;DB=EPODOC&amp;CC=CN&amp;NR=116281464A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230623&amp;DB=EPODOC&amp;CC=CN&amp;NR=116281464A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>HUANG YUZHEN</creatorcontrib><creatorcontrib>LI YAODONG</creatorcontrib><creatorcontrib>XU YIQING</creatorcontrib><creatorcontrib>ZHENG FEIXIONG</creatorcontrib><title>Double-column construction hoist and hoist control method</title><description>The invention discloses a double-column construction elevator and an elevator control method, and belongs to the field of elevators, the double-column construction elevator comprises two frame bodies and a suspension cage arranged between the two frame bodies, the frame bodies are provided with vertically arranged racks, and a driving assembly is arranged between each frame body and the suspension cage; the driving assembly comprises a first sliding frame and a second sliding frame, the first sliding frame and the second sliding frame are arranged on the frame body in a sliding mode in the vertical direction, the cage is connected with the second sliding frame, the first sliding frame is provided with a power gear and a motor used for driving the power gear, and the power gear is meshed with the rack; an elastic component is connected between the first sliding frame and the second sliding frame. The frame body does not need to bear larger bending moment, so that the loading weight of the construction hoist is</description><subject>ELEVATORS</subject><subject>ESCALATORS OR MOVING WALKWAYS</subject><subject>HAULING</subject><subject>HOISTING</subject><subject>LIFTING</subject><subject>PERFORMING OPERATIONS</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLB0yS9NyknVTc7PKc3NU0jOzysuKSpNLsnMz1PIyM8sLlFIzEuBsoCSJUX5OQq5qSUZ-Sk8DKxpiTnFqbxQmptB0c01xNlDN7UgPz61uCAxOTUvtSTe2c_Q0MzIwtDEzMTRmBg1AHl2LyY</recordid><startdate>20230623</startdate><enddate>20230623</enddate><creator>HUANG YUZHEN</creator><creator>LI YAODONG</creator><creator>XU YIQING</creator><creator>ZHENG FEIXIONG</creator><scope>EVB</scope></search><sort><creationdate>20230623</creationdate><title>Double-column construction hoist and hoist control method</title><author>HUANG YUZHEN ; LI YAODONG ; XU YIQING ; ZHENG FEIXIONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116281464A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ELEVATORS</topic><topic>ESCALATORS OR MOVING WALKWAYS</topic><topic>HAULING</topic><topic>HOISTING</topic><topic>LIFTING</topic><topic>PERFORMING OPERATIONS</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>HUANG YUZHEN</creatorcontrib><creatorcontrib>LI YAODONG</creatorcontrib><creatorcontrib>XU YIQING</creatorcontrib><creatorcontrib>ZHENG FEIXIONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>HUANG YUZHEN</au><au>LI YAODONG</au><au>XU YIQING</au><au>ZHENG FEIXIONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Double-column construction hoist and hoist control method</title><date>2023-06-23</date><risdate>2023</risdate><abstract>The invention discloses a double-column construction elevator and an elevator control method, and belongs to the field of elevators, the double-column construction elevator comprises two frame bodies and a suspension cage arranged between the two frame bodies, the frame bodies are provided with vertically arranged racks, and a driving assembly is arranged between each frame body and the suspension cage; the driving assembly comprises a first sliding frame and a second sliding frame, the first sliding frame and the second sliding frame are arranged on the frame body in a sliding mode in the vertical direction, the cage is connected with the second sliding frame, the first sliding frame is provided with a power gear and a motor used for driving the power gear, and the power gear is meshed with the rack; an elastic component is connected between the first sliding frame and the second sliding frame. The frame body does not need to bear larger bending moment, so that the loading weight of the construction hoist is</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN116281464A
source esp@cenet
subjects ELEVATORS
ESCALATORS OR MOVING WALKWAYS
HAULING
HOISTING
LIFTING
PERFORMING OPERATIONS
TRANSPORTING
title Double-column construction hoist and hoist control method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-28T19%3A40%3A35IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=HUANG%20YUZHEN&rft.date=2023-06-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116281464A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true