Building plan management method and device, electronic equipment and storage medium
The invention discloses a building plan management method and device, electronic equipment and a storage medium, and the method comprises the steps: obtaining a building construction plan which comprises at least one plan node, and the plan nodes are in one-to-one correspondence with construction pr...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | MI XIANGBIN WANG GUODONG YANG YU YANG JINHUI NI JIANGANG WANG MUMING SHEN LIXIA DUAN BAOQIANG GUO JIANFENG ZHANG HAIBIN CHENG XIN FENG XUE |
description | The invention discloses a building plan management method and device, electronic equipment and a storage medium, and the method comprises the steps: obtaining a building construction plan which comprises at least one plan node, and the plan nodes are in one-to-one correspondence with construction procedures; in response to the setting operation of the plan node, determining that the acceptance task of the construction process is completed, and when the acceptance of the construction process is completed, completing the plan node corresponding to the construction process; receiving an acceptance check completion message of the current construction process, and determining a next construction process of the current construction process; and pushing a construction reminding message to a construction party of the next construction process. According to the method, manual task reminding is not needed any more, automatic feedback of the process acceptance condition is achieved, and the efficiency of building plan m |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116245308A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116245308A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116245308A3</originalsourceid><addsrcrecordid>eNqNy8EOATEURuHZWAje4dqTGIPYMiFWNuwnN-0_o0l7W9PW8xviAazO5jvj4nbMxmojHQXLQo6FOzhIIof08JpYNGm8jMKCYKFS78UowjOb8HUfEJPvh294tMluWoxathGzXyfF_Hy615clgm8QAysIUlNfy3K33myr1f5Q_WPeUEI4ZQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Building plan management method and device, electronic equipment and storage medium</title><source>esp@cenet</source><creator>MI XIANGBIN ; WANG GUODONG ; YANG YU ; YANG JINHUI ; NI JIANGANG ; WANG MUMING ; SHEN LIXIA ; DUAN BAOQIANG ; GUO JIANFENG ; ZHANG HAIBIN ; CHENG XIN ; FENG XUE</creator><creatorcontrib>MI XIANGBIN ; WANG GUODONG ; YANG YU ; YANG JINHUI ; NI JIANGANG ; WANG MUMING ; SHEN LIXIA ; DUAN BAOQIANG ; GUO JIANFENG ; ZHANG HAIBIN ; CHENG XIN ; FENG XUE</creatorcontrib><description>The invention discloses a building plan management method and device, electronic equipment and a storage medium, and the method comprises the steps: obtaining a building construction plan which comprises at least one plan node, and the plan nodes are in one-to-one correspondence with construction procedures; in response to the setting operation of the plan node, determining that the acceptance task of the construction process is completed, and when the acceptance of the construction process is completed, completing the plan node corresponding to the construction process; receiving an acceptance check completion message of the current construction process, and determining a next construction process of the current construction process; and pushing a construction reminding message to a construction party of the next construction process. According to the method, manual task reminding is not needed any more, automatic feedback of the process acceptance condition is achieved, and the efficiency of building plan m</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230609&DB=EPODOC&CC=CN&NR=116245308A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230609&DB=EPODOC&CC=CN&NR=116245308A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>MI XIANGBIN</creatorcontrib><creatorcontrib>WANG GUODONG</creatorcontrib><creatorcontrib>YANG YU</creatorcontrib><creatorcontrib>YANG JINHUI</creatorcontrib><creatorcontrib>NI JIANGANG</creatorcontrib><creatorcontrib>WANG MUMING</creatorcontrib><creatorcontrib>SHEN LIXIA</creatorcontrib><creatorcontrib>DUAN BAOQIANG</creatorcontrib><creatorcontrib>GUO JIANFENG</creatorcontrib><creatorcontrib>ZHANG HAIBIN</creatorcontrib><creatorcontrib>CHENG XIN</creatorcontrib><creatorcontrib>FENG XUE</creatorcontrib><title>Building plan management method and device, electronic equipment and storage medium</title><description>The invention discloses a building plan management method and device, electronic equipment and a storage medium, and the method comprises the steps: obtaining a building construction plan which comprises at least one plan node, and the plan nodes are in one-to-one correspondence with construction procedures; in response to the setting operation of the plan node, determining that the acceptance task of the construction process is completed, and when the acceptance of the construction process is completed, completing the plan node corresponding to the construction process; receiving an acceptance check completion message of the current construction process, and determining a next construction process of the current construction process; and pushing a construction reminding message to a construction party of the next construction process. According to the method, manual task reminding is not needed any more, automatic feedback of the process acceptance condition is achieved, and the efficiency of building plan m</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNy8EOATEURuHZWAje4dqTGIPYMiFWNuwnN-0_o0l7W9PW8xviAazO5jvj4nbMxmojHQXLQo6FOzhIIof08JpYNGm8jMKCYKFS78UowjOb8HUfEJPvh294tMluWoxathGzXyfF_Hy615clgm8QAysIUlNfy3K33myr1f5Q_WPeUEI4ZQ</recordid><startdate>20230609</startdate><enddate>20230609</enddate><creator>MI XIANGBIN</creator><creator>WANG GUODONG</creator><creator>YANG YU</creator><creator>YANG JINHUI</creator><creator>NI JIANGANG</creator><creator>WANG MUMING</creator><creator>SHEN LIXIA</creator><creator>DUAN BAOQIANG</creator><creator>GUO JIANFENG</creator><creator>ZHANG HAIBIN</creator><creator>CHENG XIN</creator><creator>FENG XUE</creator><scope>EVB</scope></search><sort><creationdate>20230609</creationdate><title>Building plan management method and device, electronic equipment and storage medium</title><author>MI XIANGBIN ; WANG GUODONG ; YANG YU ; YANG JINHUI ; NI JIANGANG ; WANG MUMING ; SHEN LIXIA ; DUAN BAOQIANG ; GUO JIANFENG ; ZHANG HAIBIN ; CHENG XIN ; FENG XUE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116245308A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>MI XIANGBIN</creatorcontrib><creatorcontrib>WANG GUODONG</creatorcontrib><creatorcontrib>YANG YU</creatorcontrib><creatorcontrib>YANG JINHUI</creatorcontrib><creatorcontrib>NI JIANGANG</creatorcontrib><creatorcontrib>WANG MUMING</creatorcontrib><creatorcontrib>SHEN LIXIA</creatorcontrib><creatorcontrib>DUAN BAOQIANG</creatorcontrib><creatorcontrib>GUO JIANFENG</creatorcontrib><creatorcontrib>ZHANG HAIBIN</creatorcontrib><creatorcontrib>CHENG XIN</creatorcontrib><creatorcontrib>FENG XUE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>MI XIANGBIN</au><au>WANG GUODONG</au><au>YANG YU</au><au>YANG JINHUI</au><au>NI JIANGANG</au><au>WANG MUMING</au><au>SHEN LIXIA</au><au>DUAN BAOQIANG</au><au>GUO JIANFENG</au><au>ZHANG HAIBIN</au><au>CHENG XIN</au><au>FENG XUE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Building plan management method and device, electronic equipment and storage medium</title><date>2023-06-09</date><risdate>2023</risdate><abstract>The invention discloses a building plan management method and device, electronic equipment and a storage medium, and the method comprises the steps: obtaining a building construction plan which comprises at least one plan node, and the plan nodes are in one-to-one correspondence with construction procedures; in response to the setting operation of the plan node, determining that the acceptance task of the construction process is completed, and when the acceptance of the construction process is completed, completing the plan node corresponding to the construction process; receiving an acceptance check completion message of the current construction process, and determining a next construction process of the current construction process; and pushing a construction reminding message to a construction party of the next construction process. According to the method, manual task reminding is not needed any more, automatic feedback of the process acceptance condition is achieved, and the efficiency of building plan m</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN116245308A |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | Building plan management method and device, electronic equipment and storage medium |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-30T19%3A33%3A06IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=MI%20XIANGBIN&rft.date=2023-06-09&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116245308A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |