Synchronous construction method for steel structure frame and reinforced concrete core tube

The invention relates to the technical field of steel structure building engineering construction, in particular to a synchronous construction method for a steel structure frame and a reinforced concrete core tube. By adjusting the construction sequence, the steel frame columns and the steel frame b...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG WEI, JIA CHENGJIE, ZHONG JIANG, JIANG WEN, WANG PENGCHONG, REN ZEJUN, WANG CHAODI, YANG ZHENWEI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WANG WEI
JIA CHENGJIE
ZHONG JIANG
JIANG WEN
WANG PENGCHONG
REN ZEJUN
WANG CHAODI
YANG ZHENWEI
description The invention relates to the technical field of steel structure building engineering construction, in particular to a synchronous construction method for a steel structure frame and a reinforced concrete core tube. By adjusting the construction sequence, the steel frame columns and the steel frame beams except for the connecting span part in the mixed structure are independently constructed, and construction of components at the connecting span part is delayed, so that the situation that the overall progress of a steel structure frame is lagged due to the fact that core tube concrete does not reach the design strength, and an outer frame occupies the operation space is avoided. According to the construction method, the overall construction period of a project can be effectively shortened, the construction progress of the steel structure frame part is accelerated, a favorable environment is created for subsequent secondary structure and decoration project construction, and the construction method is particular
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116220384A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116220384A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116220384A3</originalsourceid><addsrcrecordid>eNqNy7EKwkAQBNA0FqL-w_oBgklEbCUoVjbaWYTzMkcCyW7Y2yv8eyP6AVYzMG_m2eP2Yt-qsKRIXjiaJm-dMA2wVhoKohQN6Ok7JQUFdQPIcUOKjifh0XzOXmGYykQsPbHMZsH1EatfLrL1-XSvLhuMUiOOzoNhdXXN831RbMvD7lj-Y94CJzxP</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Synchronous construction method for steel structure frame and reinforced concrete core tube</title><source>esp@cenet</source><creator>WANG WEI ; JIA CHENGJIE ; ZHONG JIANG ; JIANG WEN ; WANG PENGCHONG ; REN ZEJUN ; WANG CHAODI ; YANG ZHENWEI</creator><creatorcontrib>WANG WEI ; JIA CHENGJIE ; ZHONG JIANG ; JIANG WEN ; WANG PENGCHONG ; REN ZEJUN ; WANG CHAODI ; YANG ZHENWEI</creatorcontrib><description>The invention relates to the technical field of steel structure building engineering construction, in particular to a synchronous construction method for a steel structure frame and a reinforced concrete core tube. By adjusting the construction sequence, the steel frame columns and the steel frame beams except for the connecting span part in the mixed structure are independently constructed, and construction of components at the connecting span part is delayed, so that the situation that the overall progress of a steel structure frame is lagged due to the fact that core tube concrete does not reach the design strength, and an outer frame occupies the operation space is avoided. According to the construction method, the overall construction period of a project can be effectively shortened, the construction progress of the steel structure frame part is accelerated, a favorable environment is created for subsequent secondary structure and decoration project construction, and the construction method is particular</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; CEILINGS ; FIXED CONSTRUCTIONS ; FLOORS ; FORMS ; GENERAL BUILDING CONSTRUCTIONS ; HANDLING BUILDING MATERIALS ON THE SITE ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; ROOFS ; SCAFFOLDING ; SHUTTERING ; WALLS, e.g. PARTITIONS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230606&amp;DB=EPODOC&amp;CC=CN&amp;NR=116220384A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230606&amp;DB=EPODOC&amp;CC=CN&amp;NR=116220384A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG WEI</creatorcontrib><creatorcontrib>JIA CHENGJIE</creatorcontrib><creatorcontrib>ZHONG JIANG</creatorcontrib><creatorcontrib>JIANG WEN</creatorcontrib><creatorcontrib>WANG PENGCHONG</creatorcontrib><creatorcontrib>REN ZEJUN</creatorcontrib><creatorcontrib>WANG CHAODI</creatorcontrib><creatorcontrib>YANG ZHENWEI</creatorcontrib><title>Synchronous construction method for steel structure frame and reinforced concrete core tube</title><description>The invention relates to the technical field of steel structure building engineering construction, in particular to a synchronous construction method for a steel structure frame and a reinforced concrete core tube. By adjusting the construction sequence, the steel frame columns and the steel frame beams except for the connecting span part in the mixed structure are independently constructed, and construction of components at the connecting span part is delayed, so that the situation that the overall progress of a steel structure frame is lagged due to the fact that core tube concrete does not reach the design strength, and an outer frame occupies the operation space is avoided. According to the construction method, the overall construction period of a project can be effectively shortened, the construction progress of the steel structure frame part is accelerated, a favorable environment is created for subsequent secondary structure and decoration project construction, and the construction method is particular</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>CEILINGS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>FORMS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>ROOFS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNy7EKwkAQBNA0FqL-w_oBgklEbCUoVjbaWYTzMkcCyW7Y2yv8eyP6AVYzMG_m2eP2Yt-qsKRIXjiaJm-dMA2wVhoKohQN6Ok7JQUFdQPIcUOKjifh0XzOXmGYykQsPbHMZsH1EatfLrL1-XSvLhuMUiOOzoNhdXXN831RbMvD7lj-Y94CJzxP</recordid><startdate>20230606</startdate><enddate>20230606</enddate><creator>WANG WEI</creator><creator>JIA CHENGJIE</creator><creator>ZHONG JIANG</creator><creator>JIANG WEN</creator><creator>WANG PENGCHONG</creator><creator>REN ZEJUN</creator><creator>WANG CHAODI</creator><creator>YANG ZHENWEI</creator><scope>EVB</scope></search><sort><creationdate>20230606</creationdate><title>Synchronous construction method for steel structure frame and reinforced concrete core tube</title><author>WANG WEI ; JIA CHENGJIE ; ZHONG JIANG ; JIANG WEN ; WANG PENGCHONG ; REN ZEJUN ; WANG CHAODI ; YANG ZHENWEI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116220384A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>CEILINGS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>FORMS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>ROOFS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG WEI</creatorcontrib><creatorcontrib>JIA CHENGJIE</creatorcontrib><creatorcontrib>ZHONG JIANG</creatorcontrib><creatorcontrib>JIANG WEN</creatorcontrib><creatorcontrib>WANG PENGCHONG</creatorcontrib><creatorcontrib>REN ZEJUN</creatorcontrib><creatorcontrib>WANG CHAODI</creatorcontrib><creatorcontrib>YANG ZHENWEI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG WEI</au><au>JIA CHENGJIE</au><au>ZHONG JIANG</au><au>JIANG WEN</au><au>WANG PENGCHONG</au><au>REN ZEJUN</au><au>WANG CHAODI</au><au>YANG ZHENWEI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Synchronous construction method for steel structure frame and reinforced concrete core tube</title><date>2023-06-06</date><risdate>2023</risdate><abstract>The invention relates to the technical field of steel structure building engineering construction, in particular to a synchronous construction method for a steel structure frame and a reinforced concrete core tube. By adjusting the construction sequence, the steel frame columns and the steel frame beams except for the connecting span part in the mixed structure are independently constructed, and construction of components at the connecting span part is delayed, so that the situation that the overall progress of a steel structure frame is lagged due to the fact that core tube concrete does not reach the design strength, and an outer frame occupies the operation space is avoided. According to the construction method, the overall construction period of a project can be effectively shortened, the construction progress of the steel structure frame part is accelerated, a favorable environment is created for subsequent secondary structure and decoration project construction, and the construction method is particular</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN116220384A
source esp@cenet
subjects BUILDING
BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE
CEILINGS
FIXED CONSTRUCTIONS
FLOORS
FORMS
GENERAL BUILDING CONSTRUCTIONS
HANDLING BUILDING MATERIALS ON THE SITE
INSULATION OR OTHER PROTECTION OF BUILDINGS
REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS
ROOFS
SCAFFOLDING
SHUTTERING
WALLS, e.g. PARTITIONS
title Synchronous construction method for steel structure frame and reinforced concrete core tube
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-28T21%3A52%3A23IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20WEI&rft.date=2023-06-06&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116220384A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true