Construction method of three-dimensional counterforce structure laboratory

The invention discloses a construction method of a three-dimensional counter-force structure laboratory, which comprises a construction method of a counter-force wall and a construction method of a basement top plate counter-force pedestal, the construction method of the counter-force wall adopts un...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: GUO YING, HE JIANCHAO, REN XUDONG, WEI HEXIN, YU LIU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator GUO YING
HE JIANCHAO
REN XUDONG
WEI HEXIN
YU LIU
description The invention discloses a construction method of a three-dimensional counter-force structure laboratory, which comprises a construction method of a counter-force wall and a construction method of a basement top plate counter-force pedestal, the construction method of the counter-force wall adopts unbonded steel strand prestressed tendons, and anchoring and re-tensioning lengthening sections are arranged at the upper ends of the prestressed tendons; loading holes are formed in the modules, a factory prefabricated structure is adopted, loading hole modules are installed on site, and after adjustment is completed, pairing connection is conducted; a bare concrete formwork is adopted and fixed to a loading hole, a counter-force wall formwork takes the loading hole as a split bolt through-wall hole, a basement top plate counter-force pedestal formwork supporting system is of a structure formed by connecting a scaffold supporting system and a loading hole independent support into a whole, and a leveling and height a
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116181120A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116181120A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116181120A3</originalsourceid><addsrcrecordid>eNqNi7EKAjEQBdNYiPoP6wccGAWxPYIiFlb2R8y9cAe57LHZFP69gn6A1RQzszQ3x7mo1KAjZ5qgA_fEkXQQoOnHCbl8jE8UuGaFRJYA-i5VQMk_WbyyvNZmEX0q2Py4MtvL-eGuDWbuUGYfkKGdu1t7tCdr97v28E_zBr75NlM</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method of three-dimensional counterforce structure laboratory</title><source>esp@cenet</source><creator>GUO YING ; HE JIANCHAO ; REN XUDONG ; WEI HEXIN ; YU LIU</creator><creatorcontrib>GUO YING ; HE JIANCHAO ; REN XUDONG ; WEI HEXIN ; YU LIU</creatorcontrib><description>The invention discloses a construction method of a three-dimensional counter-force structure laboratory, which comprises a construction method of a counter-force wall and a construction method of a basement top plate counter-force pedestal, the construction method of the counter-force wall adopts unbonded steel strand prestressed tendons, and anchoring and re-tensioning lengthening sections are arranged at the upper ends of the prestressed tendons; loading holes are formed in the modules, a factory prefabricated structure is adopted, loading hole modules are installed on site, and after adjustment is completed, pairing connection is conducted; a bare concrete formwork is adopted and fixed to a loading hole, a counter-force wall formwork takes the loading hole as a split bolt through-wall hole, a basement top plate counter-force pedestal formwork supporting system is of a structure formed by connecting a scaffold supporting system and a loading hole independent support into a whole, and a leveling and height a</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; BUILDING MATERIALS ; BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES ; CEILINGS ; EMBANKMENTS ; EXCAVATIONS ; FENCING ; FIXED CONSTRUCTIONS ; FLOORS ; FORMS ; FOUNDATIONS ; GENERAL BUILDING CONSTRUCTIONS ; HANDLING BUILDING MATERIALS ON THE SITE ; HYDRAULIC ENGINEERING ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; MASTS ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; ROOFS ; SCAFFOLDING ; SHUTTERING ; SOIL SHIFTING ; STRUCTURAL ELEMENTS ; SWIMMING OR SPLASH BATHS OR POOLS ; TENTS OR CANOPIES, IN GENERAL ; UNDERGROUND OR UNDERWATER STRUCTURES ; WALLS, e.g. PARTITIONS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230530&amp;DB=EPODOC&amp;CC=CN&amp;NR=116181120A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230530&amp;DB=EPODOC&amp;CC=CN&amp;NR=116181120A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>GUO YING</creatorcontrib><creatorcontrib>HE JIANCHAO</creatorcontrib><creatorcontrib>REN XUDONG</creatorcontrib><creatorcontrib>WEI HEXIN</creatorcontrib><creatorcontrib>YU LIU</creatorcontrib><title>Construction method of three-dimensional counterforce structure laboratory</title><description>The invention discloses a construction method of a three-dimensional counter-force structure laboratory, which comprises a construction method of a counter-force wall and a construction method of a basement top plate counter-force pedestal, the construction method of the counter-force wall adopts unbonded steel strand prestressed tendons, and anchoring and re-tensioning lengthening sections are arranged at the upper ends of the prestressed tendons; loading holes are formed in the modules, a factory prefabricated structure is adopted, loading hole modules are installed on site, and after adjustment is completed, pairing connection is conducted; a bare concrete formwork is adopted and fixed to a loading hole, a counter-force wall formwork takes the loading hole as a split bolt through-wall hole, a basement top plate counter-force pedestal formwork supporting system is of a structure formed by connecting a scaffold supporting system and a loading hole independent support into a whole, and a leveling and height a</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>BUILDING MATERIALS</subject><subject>BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES</subject><subject>CEILINGS</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FENCING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>FORMS</subject><subject>FOUNDATIONS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>HYDRAULIC ENGINEERING</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>MASTS</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>ROOFS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>SOIL SHIFTING</subject><subject>STRUCTURAL ELEMENTS</subject><subject>SWIMMING OR SPLASH BATHS OR POOLS</subject><subject>TENTS OR CANOPIES, IN GENERAL</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNi7EKAjEQBdNYiPoP6wccGAWxPYIiFlb2R8y9cAe57LHZFP69gn6A1RQzszQ3x7mo1KAjZ5qgA_fEkXQQoOnHCbl8jE8UuGaFRJYA-i5VQMk_WbyyvNZmEX0q2Py4MtvL-eGuDWbuUGYfkKGdu1t7tCdr97v28E_zBr75NlM</recordid><startdate>20230530</startdate><enddate>20230530</enddate><creator>GUO YING</creator><creator>HE JIANCHAO</creator><creator>REN XUDONG</creator><creator>WEI HEXIN</creator><creator>YU LIU</creator><scope>EVB</scope></search><sort><creationdate>20230530</creationdate><title>Construction method of three-dimensional counterforce structure laboratory</title><author>GUO YING ; HE JIANCHAO ; REN XUDONG ; WEI HEXIN ; YU LIU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116181120A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>BUILDING MATERIALS</topic><topic>BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES</topic><topic>CEILINGS</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FENCING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>FORMS</topic><topic>FOUNDATIONS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>HYDRAULIC ENGINEERING</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>MASTS</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>ROOFS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>SOIL SHIFTING</topic><topic>STRUCTURAL ELEMENTS</topic><topic>SWIMMING OR SPLASH BATHS OR POOLS</topic><topic>TENTS OR CANOPIES, IN GENERAL</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>GUO YING</creatorcontrib><creatorcontrib>HE JIANCHAO</creatorcontrib><creatorcontrib>REN XUDONG</creatorcontrib><creatorcontrib>WEI HEXIN</creatorcontrib><creatorcontrib>YU LIU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>GUO YING</au><au>HE JIANCHAO</au><au>REN XUDONG</au><au>WEI HEXIN</au><au>YU LIU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method of three-dimensional counterforce structure laboratory</title><date>2023-05-30</date><risdate>2023</risdate><abstract>The invention discloses a construction method of a three-dimensional counter-force structure laboratory, which comprises a construction method of a counter-force wall and a construction method of a basement top plate counter-force pedestal, the construction method of the counter-force wall adopts unbonded steel strand prestressed tendons, and anchoring and re-tensioning lengthening sections are arranged at the upper ends of the prestressed tendons; loading holes are formed in the modules, a factory prefabricated structure is adopted, loading hole modules are installed on site, and after adjustment is completed, pairing connection is conducted; a bare concrete formwork is adopted and fixed to a loading hole, a counter-force wall formwork takes the loading hole as a split bolt through-wall hole, a basement top plate counter-force pedestal formwork supporting system is of a structure formed by connecting a scaffold supporting system and a loading hole independent support into a whole, and a leveling and height a</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN116181120A
source esp@cenet
subjects BUILDING
BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE
BUILDING MATERIALS
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
CEILINGS
EMBANKMENTS
EXCAVATIONS
FENCING
FIXED CONSTRUCTIONS
FLOORS
FORMS
FOUNDATIONS
GENERAL BUILDING CONSTRUCTIONS
HANDLING BUILDING MATERIALS ON THE SITE
HYDRAULIC ENGINEERING
INSULATION OR OTHER PROTECTION OF BUILDINGS
MASTS
REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS
ROOFS
SCAFFOLDING
SHUTTERING
SOIL SHIFTING
STRUCTURAL ELEMENTS
SWIMMING OR SPLASH BATHS OR POOLS
TENTS OR CANOPIES, IN GENERAL
UNDERGROUND OR UNDERWATER STRUCTURES
WALLS, e.g. PARTITIONS
title Construction method of three-dimensional counterforce structure laboratory
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-05T00%3A25%3A33IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=GUO%20YING&rft.date=2023-05-30&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116181120A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true