Preparation device and use method of high-performance mine reclamation soil

The invention discloses a high-performance mine reclamation soil preparation device which comprises a placement frame, a first treatment mechanism comprises a shell, a shell cover is mounted at the top of the shell, flow guide shells are fixed in two mounting holes, and a cylindrical hole is formed...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LONG AN, CHEN WEIDONG, XU BAOGUO, FANG ZEQUN, FAN XINGREN, CHEN WUTAO, CHEN WEIZHONG, CAI PENGFEI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LONG AN
CHEN WEIDONG
XU BAOGUO
FANG ZEQUN
FAN XINGREN
CHEN WUTAO
CHEN WEIZHONG
CAI PENGFEI
description The invention discloses a high-performance mine reclamation soil preparation device which comprises a placement frame, a first treatment mechanism comprises a shell, a shell cover is mounted at the top of the shell, flow guide shells are fixed in two mounting holes, and a cylindrical hole is formed in the top of the shell cover. The interior of the cylindrical hole is rotationally connected with a circular pipe through a first bearing, a funnel-shaped pipe is fixed to the top end of the circular pipe, a motor is installed at the top of the shell cover, the output end of the motor and the outer wall of the circular pipe are fixedly sleeved with leather wheels, and the outer wall of the circular pipe is fixedly sleeved with two sets of crushing rods; and a plurality of L-shaped rods are distributed and fixed to the outer wall of the circular pipe at equal intervals, and a scattering hopper is installed at the bottom end of the circular pipe. By arranging the first treatment mechanism, acid neutralization operat
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116174473A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116174473A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116174473A3</originalsourceid><addsrcrecordid>eNqNyzsKAjEURuE0FqLu4bqAKcIMTi3DiCCIhf1wSf6YQF4k0fUr6AKsTvOdtbjcCjIXbi5F0ng5BeKo6VlBAc0mTcmQdQ_bZRSTSuD4IcFFUIHyHL5rTc5vxcqwr9j9uhH703yfzh1yWlAzK0S0ZbpKeZDjMIz9sf_HvAFZaTVv</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Preparation device and use method of high-performance mine reclamation soil</title><source>esp@cenet</source><creator>LONG AN ; CHEN WEIDONG ; XU BAOGUO ; FANG ZEQUN ; FAN XINGREN ; CHEN WUTAO ; CHEN WEIZHONG ; CAI PENGFEI</creator><creatorcontrib>LONG AN ; CHEN WEIDONG ; XU BAOGUO ; FANG ZEQUN ; FAN XINGREN ; CHEN WUTAO ; CHEN WEIZHONG ; CAI PENGFEI</creatorcontrib><description>The invention discloses a high-performance mine reclamation soil preparation device which comprises a placement frame, a first treatment mechanism comprises a shell, a shell cover is mounted at the top of the shell, flow guide shells are fixed in two mounting holes, and a cylindrical hole is formed in the top of the shell cover. The interior of the cylindrical hole is rotationally connected with a circular pipe through a first bearing, a funnel-shaped pipe is fixed to the top end of the circular pipe, a motor is installed at the top of the shell cover, the output end of the motor and the outer wall of the circular pipe are fixedly sleeved with leather wheels, and the outer wall of the circular pipe is fixedly sleeved with two sets of crushing rods; and a plurality of L-shaped rods are distributed and fixed to the outer wall of the circular pipe at equal intervals, and a scattering hopper is installed at the bottom end of the circular pipe. By arranging the first treatment mechanism, acid neutralization operat</description><language>chi ; eng</language><subject>DISPOSAL OF SOLID WASTE ; PERFORMING OPERATIONS ; RECLAMATION OF CONTAMINATED SOIL ; RECLAMATION OF CONTAMINED SOIL SOIL ; TRANSPORTING</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230530&amp;DB=EPODOC&amp;CC=CN&amp;NR=116174473A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230530&amp;DB=EPODOC&amp;CC=CN&amp;NR=116174473A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LONG AN</creatorcontrib><creatorcontrib>CHEN WEIDONG</creatorcontrib><creatorcontrib>XU BAOGUO</creatorcontrib><creatorcontrib>FANG ZEQUN</creatorcontrib><creatorcontrib>FAN XINGREN</creatorcontrib><creatorcontrib>CHEN WUTAO</creatorcontrib><creatorcontrib>CHEN WEIZHONG</creatorcontrib><creatorcontrib>CAI PENGFEI</creatorcontrib><title>Preparation device and use method of high-performance mine reclamation soil</title><description>The invention discloses a high-performance mine reclamation soil preparation device which comprises a placement frame, a first treatment mechanism comprises a shell, a shell cover is mounted at the top of the shell, flow guide shells are fixed in two mounting holes, and a cylindrical hole is formed in the top of the shell cover. The interior of the cylindrical hole is rotationally connected with a circular pipe through a first bearing, a funnel-shaped pipe is fixed to the top end of the circular pipe, a motor is installed at the top of the shell cover, the output end of the motor and the outer wall of the circular pipe are fixedly sleeved with leather wheels, and the outer wall of the circular pipe is fixedly sleeved with two sets of crushing rods; and a plurality of L-shaped rods are distributed and fixed to the outer wall of the circular pipe at equal intervals, and a scattering hopper is installed at the bottom end of the circular pipe. By arranging the first treatment mechanism, acid neutralization operat</description><subject>DISPOSAL OF SOLID WASTE</subject><subject>PERFORMING OPERATIONS</subject><subject>RECLAMATION OF CONTAMINATED SOIL</subject><subject>RECLAMATION OF CONTAMINED SOIL SOIL</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyzsKAjEURuE0FqLu4bqAKcIMTi3DiCCIhf1wSf6YQF4k0fUr6AKsTvOdtbjcCjIXbi5F0ng5BeKo6VlBAc0mTcmQdQ_bZRSTSuD4IcFFUIHyHL5rTc5vxcqwr9j9uhH703yfzh1yWlAzK0S0ZbpKeZDjMIz9sf_HvAFZaTVv</recordid><startdate>20230530</startdate><enddate>20230530</enddate><creator>LONG AN</creator><creator>CHEN WEIDONG</creator><creator>XU BAOGUO</creator><creator>FANG ZEQUN</creator><creator>FAN XINGREN</creator><creator>CHEN WUTAO</creator><creator>CHEN WEIZHONG</creator><creator>CAI PENGFEI</creator><scope>EVB</scope></search><sort><creationdate>20230530</creationdate><title>Preparation device and use method of high-performance mine reclamation soil</title><author>LONG AN ; CHEN WEIDONG ; XU BAOGUO ; FANG ZEQUN ; FAN XINGREN ; CHEN WUTAO ; CHEN WEIZHONG ; CAI PENGFEI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116174473A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>DISPOSAL OF SOLID WASTE</topic><topic>PERFORMING OPERATIONS</topic><topic>RECLAMATION OF CONTAMINATED SOIL</topic><topic>RECLAMATION OF CONTAMINED SOIL SOIL</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>LONG AN</creatorcontrib><creatorcontrib>CHEN WEIDONG</creatorcontrib><creatorcontrib>XU BAOGUO</creatorcontrib><creatorcontrib>FANG ZEQUN</creatorcontrib><creatorcontrib>FAN XINGREN</creatorcontrib><creatorcontrib>CHEN WUTAO</creatorcontrib><creatorcontrib>CHEN WEIZHONG</creatorcontrib><creatorcontrib>CAI PENGFEI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LONG AN</au><au>CHEN WEIDONG</au><au>XU BAOGUO</au><au>FANG ZEQUN</au><au>FAN XINGREN</au><au>CHEN WUTAO</au><au>CHEN WEIZHONG</au><au>CAI PENGFEI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Preparation device and use method of high-performance mine reclamation soil</title><date>2023-05-30</date><risdate>2023</risdate><abstract>The invention discloses a high-performance mine reclamation soil preparation device which comprises a placement frame, a first treatment mechanism comprises a shell, a shell cover is mounted at the top of the shell, flow guide shells are fixed in two mounting holes, and a cylindrical hole is formed in the top of the shell cover. The interior of the cylindrical hole is rotationally connected with a circular pipe through a first bearing, a funnel-shaped pipe is fixed to the top end of the circular pipe, a motor is installed at the top of the shell cover, the output end of the motor and the outer wall of the circular pipe are fixedly sleeved with leather wheels, and the outer wall of the circular pipe is fixedly sleeved with two sets of crushing rods; and a plurality of L-shaped rods are distributed and fixed to the outer wall of the circular pipe at equal intervals, and a scattering hopper is installed at the bottom end of the circular pipe. By arranging the first treatment mechanism, acid neutralization operat</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN116174473A
source esp@cenet
subjects DISPOSAL OF SOLID WASTE
PERFORMING OPERATIONS
RECLAMATION OF CONTAMINATED SOIL
RECLAMATION OF CONTAMINED SOIL SOIL
TRANSPORTING
title Preparation device and use method of high-performance mine reclamation soil
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-27T02%3A42%3A11IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LONG%20AN&rft.date=2023-05-30&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116174473A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true