Prefabricated steel-UHPC (Ultra High Performance Concrete) combined bridge deck slab beam for pedestrian overpass and bridge thereof

The prefabricated steel-UHPC combined bridge deck slab beam comprises hollow rectangular prefabricated steel plate beams which can be detachably spliced with one another, grooves are evenly distributed in the hollow rectangular prefabricated steel plate beams in the longitudinal direction, and shear...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LU QIUMING, WANG LIKUN, CHEN XIAOHU, MENG JIE, LIU ZHAO, LIU SHICHENG, LI PO, ZHOU HUANQIANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LU QIUMING
WANG LIKUN
CHEN XIAOHU
MENG JIE
LIU ZHAO
LIU SHICHENG
LI PO
ZHOU HUANQIANG
description The prefabricated steel-UHPC combined bridge deck slab beam comprises hollow rectangular prefabricated steel plate beams which can be detachably spliced with one another, grooves are evenly distributed in the hollow rectangular prefabricated steel plate beams in the longitudinal direction, and shear force connecting pieces are vertically arranged in the grooves; ultra-high performance concrete is poured on the hollow rectangular prefabricated steel plate beams to form UHPC panels; the bridge deck slab is small in overall thickness, large in clearance under the bridge and light in self weight. Factory-like integral manufacturing of the fabricated steel-UHPC footbridge panels is utilized to guarantee interface connection reliability, concrete cast-in-place of steel-concrete combination portions and transverse connection between the footbridge panels are avoided, simplicity, convenience and rapidness are achieved, and meanwhile fabricated construction can shorten the construction period, reduce influences on con
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116084279A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116084279A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116084279A3</originalsourceid><addsrcrecordid>eNqNy70OgjAUhmEWB6Pew3HTgUTU-DMaomEyDDKTQ_kKRGib08Yr8MJlMM5O7_I-0-idCzRX0ikOqMkHoI-LLE9pVfRBmLKuaSmHaCsDGwVKrVGCgDUpO1SdGdXI6wZUQz3J91xRBR5oFORQwwfp2JB9QRx7T2x-IrQQWD2PJpp7j8W3s2h5uz7SLIazJbxjBYNQpvckOWxO--3xfNn983wAoCxJjQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Prefabricated steel-UHPC (Ultra High Performance Concrete) combined bridge deck slab beam for pedestrian overpass and bridge thereof</title><source>esp@cenet</source><creator>LU QIUMING ; WANG LIKUN ; CHEN XIAOHU ; MENG JIE ; LIU ZHAO ; LIU SHICHENG ; LI PO ; ZHOU HUANQIANG</creator><creatorcontrib>LU QIUMING ; WANG LIKUN ; CHEN XIAOHU ; MENG JIE ; LIU ZHAO ; LIU SHICHENG ; LI PO ; ZHOU HUANQIANG</creatorcontrib><description>The prefabricated steel-UHPC combined bridge deck slab beam comprises hollow rectangular prefabricated steel plate beams which can be detachably spliced with one another, grooves are evenly distributed in the hollow rectangular prefabricated steel plate beams in the longitudinal direction, and shear force connecting pieces are vertically arranged in the grooves; ultra-high performance concrete is poured on the hollow rectangular prefabricated steel plate beams to form UHPC panels; the bridge deck slab is small in overall thickness, large in clearance under the bridge and light in self weight. Factory-like integral manufacturing of the fabricated steel-UHPC footbridge panels is utilized to guarantee interface connection reliability, concrete cast-in-place of steel-concrete combination portions and transverse connection between the footbridge panels are avoided, simplicity, convenience and rapidness are achieved, and meanwhile fabricated construction can shorten the construction period, reduce influences on con</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230509&amp;DB=EPODOC&amp;CC=CN&amp;NR=116084279A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230509&amp;DB=EPODOC&amp;CC=CN&amp;NR=116084279A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LU QIUMING</creatorcontrib><creatorcontrib>WANG LIKUN</creatorcontrib><creatorcontrib>CHEN XIAOHU</creatorcontrib><creatorcontrib>MENG JIE</creatorcontrib><creatorcontrib>LIU ZHAO</creatorcontrib><creatorcontrib>LIU SHICHENG</creatorcontrib><creatorcontrib>LI PO</creatorcontrib><creatorcontrib>ZHOU HUANQIANG</creatorcontrib><title>Prefabricated steel-UHPC (Ultra High Performance Concrete) combined bridge deck slab beam for pedestrian overpass and bridge thereof</title><description>The prefabricated steel-UHPC combined bridge deck slab beam comprises hollow rectangular prefabricated steel plate beams which can be detachably spliced with one another, grooves are evenly distributed in the hollow rectangular prefabricated steel plate beams in the longitudinal direction, and shear force connecting pieces are vertically arranged in the grooves; ultra-high performance concrete is poured on the hollow rectangular prefabricated steel plate beams to form UHPC panels; the bridge deck slab is small in overall thickness, large in clearance under the bridge and light in self weight. Factory-like integral manufacturing of the fabricated steel-UHPC footbridge panels is utilized to guarantee interface connection reliability, concrete cast-in-place of steel-concrete combination portions and transverse connection between the footbridge panels are avoided, simplicity, convenience and rapidness are achieved, and meanwhile fabricated construction can shorten the construction period, reduce influences on con</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNy70OgjAUhmEWB6Pew3HTgUTU-DMaomEyDDKTQ_kKRGib08Yr8MJlMM5O7_I-0-idCzRX0ikOqMkHoI-LLE9pVfRBmLKuaSmHaCsDGwVKrVGCgDUpO1SdGdXI6wZUQz3J91xRBR5oFORQwwfp2JB9QRx7T2x-IrQQWD2PJpp7j8W3s2h5uz7SLIazJbxjBYNQpvckOWxO--3xfNn983wAoCxJjQ</recordid><startdate>20230509</startdate><enddate>20230509</enddate><creator>LU QIUMING</creator><creator>WANG LIKUN</creator><creator>CHEN XIAOHU</creator><creator>MENG JIE</creator><creator>LIU ZHAO</creator><creator>LIU SHICHENG</creator><creator>LI PO</creator><creator>ZHOU HUANQIANG</creator><scope>EVB</scope></search><sort><creationdate>20230509</creationdate><title>Prefabricated steel-UHPC (Ultra High Performance Concrete) combined bridge deck slab beam for pedestrian overpass and bridge thereof</title><author>LU QIUMING ; WANG LIKUN ; CHEN XIAOHU ; MENG JIE ; LIU ZHAO ; LIU SHICHENG ; LI PO ; ZHOU HUANQIANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116084279A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>LU QIUMING</creatorcontrib><creatorcontrib>WANG LIKUN</creatorcontrib><creatorcontrib>CHEN XIAOHU</creatorcontrib><creatorcontrib>MENG JIE</creatorcontrib><creatorcontrib>LIU ZHAO</creatorcontrib><creatorcontrib>LIU SHICHENG</creatorcontrib><creatorcontrib>LI PO</creatorcontrib><creatorcontrib>ZHOU HUANQIANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LU QIUMING</au><au>WANG LIKUN</au><au>CHEN XIAOHU</au><au>MENG JIE</au><au>LIU ZHAO</au><au>LIU SHICHENG</au><au>LI PO</au><au>ZHOU HUANQIANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Prefabricated steel-UHPC (Ultra High Performance Concrete) combined bridge deck slab beam for pedestrian overpass and bridge thereof</title><date>2023-05-09</date><risdate>2023</risdate><abstract>The prefabricated steel-UHPC combined bridge deck slab beam comprises hollow rectangular prefabricated steel plate beams which can be detachably spliced with one another, grooves are evenly distributed in the hollow rectangular prefabricated steel plate beams in the longitudinal direction, and shear force connecting pieces are vertically arranged in the grooves; ultra-high performance concrete is poured on the hollow rectangular prefabricated steel plate beams to form UHPC panels; the bridge deck slab is small in overall thickness, large in clearance under the bridge and light in self weight. Factory-like integral manufacturing of the fabricated steel-UHPC footbridge panels is utilized to guarantee interface connection reliability, concrete cast-in-place of steel-concrete combination portions and transverse connection between the footbridge panels are avoided, simplicity, convenience and rapidness are achieved, and meanwhile fabricated construction can shorten the construction period, reduce influences on con</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN116084279A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Prefabricated steel-UHPC (Ultra High Performance Concrete) combined bridge deck slab beam for pedestrian overpass and bridge thereof
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-02T05%3A08%3A10IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LU%20QIUMING&rft.date=2023-05-09&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116084279A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true