Matching and prefabricating system and method for segmental beam full-suspension process pier top block
The invention discloses a matching prefabrication system for a segmental beam full-suspension process pier top block, which comprises a pier top block segmental beam which comprises a standard segmental beam and a standard segmental beam lengthening section, is connected to the tail end of the stand...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHAO ZHIFENG SU HONGTAO YAN AI ZHAO GUICHUAN ZHANG BINGTAO ZHAO ZANJIE WANG ZHEN YANG CHUAN PENG PO GUI LIN |
description | The invention discloses a matching prefabrication system for a segmental beam full-suspension process pier top block, which comprises a pier top block segmental beam which comprises a standard segmental beam and a standard segmental beam lengthening section, is connected to the tail end of the standard segmental beam in the longitudinal direction of a bridge and is used for prefabrication construction of a movable end mold; wherein each of the standard segmental beam and the standard segmental beam lengthened section comprises a bottom die and two side dies distributed on two sides of the bottom die; the standard trolley and the standard trolley lengthening section are connected to the tail end of the standard trolley in the longitudinal length direction of the bridge, and the to-be-matched beam section and the pier top block segmental beam are placed on the standard trolley and the standard trolley lengthening section. According to the method, lengthened sections are designed for a bottom die and side dies o |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116043695A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116043695A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116043695A3</originalsourceid><addsrcrecordid>eNqNjD0KwkAQRtNYiHqH8QABQ1SwlKDYaGUfJpvZZHF3Z9mZFN7eHzyA1QfvPb55MVxRzejiABh7SJksdtkZ1A-SpyiFrwmkI_dgOYPQECgqeugIA9jJ-1ImSRTFcXx_sCERSI4yKCfoPJvHsphZ9EKr3y6K9fl0by4lJW5JEhqKpG1zq6r9ZlvvD7tj_U_zAuP5QEw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Matching and prefabricating system and method for segmental beam full-suspension process pier top block</title><source>esp@cenet</source><creator>ZHAO ZHIFENG ; SU HONGTAO ; YAN AI ; ZHAO GUICHUAN ; ZHANG BINGTAO ; ZHAO ZANJIE ; WANG ZHEN ; YANG CHUAN ; PENG PO ; GUI LIN</creator><creatorcontrib>ZHAO ZHIFENG ; SU HONGTAO ; YAN AI ; ZHAO GUICHUAN ; ZHANG BINGTAO ; ZHAO ZANJIE ; WANG ZHEN ; YANG CHUAN ; PENG PO ; GUI LIN</creatorcontrib><description>The invention discloses a matching prefabrication system for a segmental beam full-suspension process pier top block, which comprises a pier top block segmental beam which comprises a standard segmental beam and a standard segmental beam lengthening section, is connected to the tail end of the standard segmental beam in the longitudinal direction of a bridge and is used for prefabrication construction of a movable end mold; wherein each of the standard segmental beam and the standard segmental beam lengthened section comprises a bottom die and two side dies distributed on two sides of the bottom die; the standard trolley and the standard trolley lengthening section are connected to the tail end of the standard trolley in the longitudinal length direction of the bridge, and the to-be-matched beam section and the pier top block segmental beam are placed on the standard trolley and the standard trolley lengthening section. According to the method, lengthened sections are designed for a bottom die and side dies o</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230502&DB=EPODOC&CC=CN&NR=116043695A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230502&DB=EPODOC&CC=CN&NR=116043695A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHAO ZHIFENG</creatorcontrib><creatorcontrib>SU HONGTAO</creatorcontrib><creatorcontrib>YAN AI</creatorcontrib><creatorcontrib>ZHAO GUICHUAN</creatorcontrib><creatorcontrib>ZHANG BINGTAO</creatorcontrib><creatorcontrib>ZHAO ZANJIE</creatorcontrib><creatorcontrib>WANG ZHEN</creatorcontrib><creatorcontrib>YANG CHUAN</creatorcontrib><creatorcontrib>PENG PO</creatorcontrib><creatorcontrib>GUI LIN</creatorcontrib><title>Matching and prefabricating system and method for segmental beam full-suspension process pier top block</title><description>The invention discloses a matching prefabrication system for a segmental beam full-suspension process pier top block, which comprises a pier top block segmental beam which comprises a standard segmental beam and a standard segmental beam lengthening section, is connected to the tail end of the standard segmental beam in the longitudinal direction of a bridge and is used for prefabrication construction of a movable end mold; wherein each of the standard segmental beam and the standard segmental beam lengthened section comprises a bottom die and two side dies distributed on two sides of the bottom die; the standard trolley and the standard trolley lengthening section are connected to the tail end of the standard trolley in the longitudinal length direction of the bridge, and the to-be-matched beam section and the pier top block segmental beam are placed on the standard trolley and the standard trolley lengthening section. According to the method, lengthened sections are designed for a bottom die and side dies o</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjD0KwkAQRtNYiHqH8QABQ1SwlKDYaGUfJpvZZHF3Z9mZFN7eHzyA1QfvPb55MVxRzejiABh7SJksdtkZ1A-SpyiFrwmkI_dgOYPQECgqeugIA9jJ-1ImSRTFcXx_sCERSI4yKCfoPJvHsphZ9EKr3y6K9fl0by4lJW5JEhqKpG1zq6r9ZlvvD7tj_U_zAuP5QEw</recordid><startdate>20230502</startdate><enddate>20230502</enddate><creator>ZHAO ZHIFENG</creator><creator>SU HONGTAO</creator><creator>YAN AI</creator><creator>ZHAO GUICHUAN</creator><creator>ZHANG BINGTAO</creator><creator>ZHAO ZANJIE</creator><creator>WANG ZHEN</creator><creator>YANG CHUAN</creator><creator>PENG PO</creator><creator>GUI LIN</creator><scope>EVB</scope></search><sort><creationdate>20230502</creationdate><title>Matching and prefabricating system and method for segmental beam full-suspension process pier top block</title><author>ZHAO ZHIFENG ; SU HONGTAO ; YAN AI ; ZHAO GUICHUAN ; ZHANG BINGTAO ; ZHAO ZANJIE ; WANG ZHEN ; YANG CHUAN ; PENG PO ; GUI LIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116043695A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHAO ZHIFENG</creatorcontrib><creatorcontrib>SU HONGTAO</creatorcontrib><creatorcontrib>YAN AI</creatorcontrib><creatorcontrib>ZHAO GUICHUAN</creatorcontrib><creatorcontrib>ZHANG BINGTAO</creatorcontrib><creatorcontrib>ZHAO ZANJIE</creatorcontrib><creatorcontrib>WANG ZHEN</creatorcontrib><creatorcontrib>YANG CHUAN</creatorcontrib><creatorcontrib>PENG PO</creatorcontrib><creatorcontrib>GUI LIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHAO ZHIFENG</au><au>SU HONGTAO</au><au>YAN AI</au><au>ZHAO GUICHUAN</au><au>ZHANG BINGTAO</au><au>ZHAO ZANJIE</au><au>WANG ZHEN</au><au>YANG CHUAN</au><au>PENG PO</au><au>GUI LIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Matching and prefabricating system and method for segmental beam full-suspension process pier top block</title><date>2023-05-02</date><risdate>2023</risdate><abstract>The invention discloses a matching prefabrication system for a segmental beam full-suspension process pier top block, which comprises a pier top block segmental beam which comprises a standard segmental beam and a standard segmental beam lengthening section, is connected to the tail end of the standard segmental beam in the longitudinal direction of a bridge and is used for prefabrication construction of a movable end mold; wherein each of the standard segmental beam and the standard segmental beam lengthened section comprises a bottom die and two side dies distributed on two sides of the bottom die; the standard trolley and the standard trolley lengthening section are connected to the tail end of the standard trolley in the longitudinal length direction of the bridge, and the to-be-matched beam section and the pier top block segmental beam are placed on the standard trolley and the standard trolley lengthening section. According to the method, lengthened sections are designed for a bottom die and side dies o</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN116043695A |
source | esp@cenet |
subjects | ASSEMBLY OF BRIDGES CONSTRUCTION OF BRIDGES CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES FIXED CONSTRUCTIONS OR VIADUCTS |
title | Matching and prefabricating system and method for segmental beam full-suspension process pier top block |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-30T16%3A52%3A51IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHAO%20ZHIFENG&rft.date=2023-05-02&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116043695A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |