Pit merging construction method for adjacent foundation pits

The invention relates to a combined pit construction method for adjacent foundation pits. The combined pit construction method comprises the following steps that two foundation pits and an area between the two foundation pits are excavated at the design positions of the two adjacent foundation pits...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: PAN WENQIANG, JI RONGSHENG, ZOU SHANYONG, XUE CHUNDAN, JIN HONGYU, YAN WENMING, ZHANG NAIZHONG, ZHANG NAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator PAN WENQIANG
JI RONGSHENG
ZOU SHANYONG
XUE CHUNDAN
JIN HONGYU
YAN WENMING
ZHANG NAIZHONG
ZHANG NAN
description The invention relates to a combined pit construction method for adjacent foundation pits. The combined pit construction method comprises the following steps that two foundation pits and an area between the two foundation pits are excavated at the design positions of the two adjacent foundation pits at the same time to form an integral communicating space; and the first supporting beam is constructed, so that the first supporting beam is connected to the opposite side walls of the two foundation pits in a jacking mode. The two foundation pits and the area between the two foundation pits are excavated at the same time to form the whole communicating space, the first supporting beams are connected to the opposite side walls of the two foundation pits in a jacking and supporting mode, the whole two combined foundation pits are supported and reinforced, due to the fact that the two foundation pits can be constructed synchronously, the construction efficiency is improved, and the construction cost is reduced. And c
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116024984A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116024984A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116024984A3</originalsourceid><addsrcrecordid>eNrjZLAJyCxRyE0tSs_MS1dIzs8rLikqTS7JzM8DCpZk5KcopOUXKSSmZCUmp-aVADmleSmJYOmCzJJiHgbWtMSc4lReKM3NoOjmGuLsoZtakB-fWlwA0pRaEu_sZ2hoZmBkYmlh4mhMjBoAGkEwQw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Pit merging construction method for adjacent foundation pits</title><source>esp@cenet</source><creator>PAN WENQIANG ; JI RONGSHENG ; ZOU SHANYONG ; XUE CHUNDAN ; JIN HONGYU ; YAN WENMING ; ZHANG NAIZHONG ; ZHANG NAN</creator><creatorcontrib>PAN WENQIANG ; JI RONGSHENG ; ZOU SHANYONG ; XUE CHUNDAN ; JIN HONGYU ; YAN WENMING ; ZHANG NAIZHONG ; ZHANG NAN</creatorcontrib><description>The invention relates to a combined pit construction method for adjacent foundation pits. The combined pit construction method comprises the following steps that two foundation pits and an area between the two foundation pits are excavated at the design positions of the two adjacent foundation pits at the same time to form an integral communicating space; and the first supporting beam is constructed, so that the first supporting beam is connected to the opposite side walls of the two foundation pits in a jacking mode. The two foundation pits and the area between the two foundation pits are excavated at the same time to form the whole communicating space, the first supporting beams are connected to the opposite side walls of the two foundation pits in a jacking and supporting mode, the whole two combined foundation pits are supported and reinforced, due to the fact that the two foundation pits can be constructed synchronously, the construction efficiency is improved, and the construction cost is reduced. And c</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230428&amp;DB=EPODOC&amp;CC=CN&amp;NR=116024984A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230428&amp;DB=EPODOC&amp;CC=CN&amp;NR=116024984A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>PAN WENQIANG</creatorcontrib><creatorcontrib>JI RONGSHENG</creatorcontrib><creatorcontrib>ZOU SHANYONG</creatorcontrib><creatorcontrib>XUE CHUNDAN</creatorcontrib><creatorcontrib>JIN HONGYU</creatorcontrib><creatorcontrib>YAN WENMING</creatorcontrib><creatorcontrib>ZHANG NAIZHONG</creatorcontrib><creatorcontrib>ZHANG NAN</creatorcontrib><title>Pit merging construction method for adjacent foundation pits</title><description>The invention relates to a combined pit construction method for adjacent foundation pits. The combined pit construction method comprises the following steps that two foundation pits and an area between the two foundation pits are excavated at the design positions of the two adjacent foundation pits at the same time to form an integral communicating space; and the first supporting beam is constructed, so that the first supporting beam is connected to the opposite side walls of the two foundation pits in a jacking mode. The two foundation pits and the area between the two foundation pits are excavated at the same time to form the whole communicating space, the first supporting beams are connected to the opposite side walls of the two foundation pits in a jacking and supporting mode, the whole two combined foundation pits are supported and reinforced, due to the fact that the two foundation pits can be constructed synchronously, the construction efficiency is improved, and the construction cost is reduced. And c</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLAJyCxRyE0tSs_MS1dIzs8rLikqTS7JzM8DCpZk5KcopOUXKSSmZCUmp-aVADmleSmJYOmCzJJiHgbWtMSc4lReKM3NoOjmGuLsoZtakB-fWlwA0pRaEu_sZ2hoZmBkYmlh4mhMjBoAGkEwQw</recordid><startdate>20230428</startdate><enddate>20230428</enddate><creator>PAN WENQIANG</creator><creator>JI RONGSHENG</creator><creator>ZOU SHANYONG</creator><creator>XUE CHUNDAN</creator><creator>JIN HONGYU</creator><creator>YAN WENMING</creator><creator>ZHANG NAIZHONG</creator><creator>ZHANG NAN</creator><scope>EVB</scope></search><sort><creationdate>20230428</creationdate><title>Pit merging construction method for adjacent foundation pits</title><author>PAN WENQIANG ; JI RONGSHENG ; ZOU SHANYONG ; XUE CHUNDAN ; JIN HONGYU ; YAN WENMING ; ZHANG NAIZHONG ; ZHANG NAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116024984A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>PAN WENQIANG</creatorcontrib><creatorcontrib>JI RONGSHENG</creatorcontrib><creatorcontrib>ZOU SHANYONG</creatorcontrib><creatorcontrib>XUE CHUNDAN</creatorcontrib><creatorcontrib>JIN HONGYU</creatorcontrib><creatorcontrib>YAN WENMING</creatorcontrib><creatorcontrib>ZHANG NAIZHONG</creatorcontrib><creatorcontrib>ZHANG NAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>PAN WENQIANG</au><au>JI RONGSHENG</au><au>ZOU SHANYONG</au><au>XUE CHUNDAN</au><au>JIN HONGYU</au><au>YAN WENMING</au><au>ZHANG NAIZHONG</au><au>ZHANG NAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Pit merging construction method for adjacent foundation pits</title><date>2023-04-28</date><risdate>2023</risdate><abstract>The invention relates to a combined pit construction method for adjacent foundation pits. The combined pit construction method comprises the following steps that two foundation pits and an area between the two foundation pits are excavated at the design positions of the two adjacent foundation pits at the same time to form an integral communicating space; and the first supporting beam is constructed, so that the first supporting beam is connected to the opposite side walls of the two foundation pits in a jacking mode. The two foundation pits and the area between the two foundation pits are excavated at the same time to form the whole communicating space, the first supporting beams are connected to the opposite side walls of the two foundation pits in a jacking and supporting mode, the whole two combined foundation pits are supported and reinforced, due to the fact that the two foundation pits can be constructed synchronously, the construction efficiency is improved, and the construction cost is reduced. And c</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN116024984A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Pit merging construction method for adjacent foundation pits
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-17T19%3A18%3A04IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=PAN%20WENQIANG&rft.date=2023-04-28&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116024984A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true