Tower-passing construction method for main tower internally-penetrating type steel box girder cable bearing bridge

The invention relates to a tower-passing construction method for a main tower internally-penetrating type steel box girder cable bearing bridge. The tower-passing construction method comprises the steps that a to-be-installed steel box girder is divided into side steel box girder sections, a middle...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: PAN TAO, XIAO HAIZHU, QIU YUANXI, XU KEYING, YI LIBANG, ZHANG JING
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator PAN TAO
XIAO HAIZHU
QIU YUANXI
XU KEYING
YI LIBANG
ZHANG JING
description The invention relates to a tower-passing construction method for a main tower internally-penetrating type steel box girder cable bearing bridge. The tower-passing construction method comprises the steps that a to-be-installed steel box girder is divided into side steel box girder sections, a middle steel box girder section and a steel cross beam section; the side steel box girder sections and the middle steel box girder sections are sequentially hoisted to the slide way girder on the main span side; the side steel box girder sections and the middle steel box girder sections are longitudinally pushed to the designed positions towards the side span sides correspondingly, and are spliced from front to back to form side steel box girders and middle steel box girders; and the multiple steel cross beam sections are hoisted to the positions between the corresponding side steel box girders and the corresponding middle steel box girders, butt joint is completed, and the whole side span steel box girder is formed. The
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116005570A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116005570A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116005570A3</originalsourceid><addsrcrecordid>eNqNzDEKwkAQheE0FqLeYTxAIEGitQTFyip9mN1M4sJmZ5kd0dxeFzyA1Wu-968L6fhFUkZMyYUJLIek8rTqOMBM-uABRhaY0QXQTMEFJQno_VJGCqSCmp-6RIKkRB4Mv2FyMnyxReMJDKFkY8QNE22L1Yg-0e63m2J_vXTtraTIPaWINmf79l7Xx6pqmlN1PvxjPoLXRNg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Tower-passing construction method for main tower internally-penetrating type steel box girder cable bearing bridge</title><source>esp@cenet</source><creator>PAN TAO ; XIAO HAIZHU ; QIU YUANXI ; XU KEYING ; YI LIBANG ; ZHANG JING</creator><creatorcontrib>PAN TAO ; XIAO HAIZHU ; QIU YUANXI ; XU KEYING ; YI LIBANG ; ZHANG JING</creatorcontrib><description>The invention relates to a tower-passing construction method for a main tower internally-penetrating type steel box girder cable bearing bridge. The tower-passing construction method comprises the steps that a to-be-installed steel box girder is divided into side steel box girder sections, a middle steel box girder section and a steel cross beam section; the side steel box girder sections and the middle steel box girder sections are sequentially hoisted to the slide way girder on the main span side; the side steel box girder sections and the middle steel box girder sections are longitudinally pushed to the designed positions towards the side span sides correspondingly, and are spliced from front to back to form side steel box girders and middle steel box girders; and the multiple steel cross beam sections are hoisted to the positions between the corresponding side steel box girders and the corresponding middle steel box girders, butt joint is completed, and the whole side span steel box girder is formed. The</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230425&amp;DB=EPODOC&amp;CC=CN&amp;NR=116005570A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76516</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230425&amp;DB=EPODOC&amp;CC=CN&amp;NR=116005570A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>PAN TAO</creatorcontrib><creatorcontrib>XIAO HAIZHU</creatorcontrib><creatorcontrib>QIU YUANXI</creatorcontrib><creatorcontrib>XU KEYING</creatorcontrib><creatorcontrib>YI LIBANG</creatorcontrib><creatorcontrib>ZHANG JING</creatorcontrib><title>Tower-passing construction method for main tower internally-penetrating type steel box girder cable bearing bridge</title><description>The invention relates to a tower-passing construction method for a main tower internally-penetrating type steel box girder cable bearing bridge. The tower-passing construction method comprises the steps that a to-be-installed steel box girder is divided into side steel box girder sections, a middle steel box girder section and a steel cross beam section; the side steel box girder sections and the middle steel box girder sections are sequentially hoisted to the slide way girder on the main span side; the side steel box girder sections and the middle steel box girder sections are longitudinally pushed to the designed positions towards the side span sides correspondingly, and are spliced from front to back to form side steel box girders and middle steel box girders; and the multiple steel cross beam sections are hoisted to the positions between the corresponding side steel box girders and the corresponding middle steel box girders, butt joint is completed, and the whole side span steel box girder is formed. The</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNzDEKwkAQheE0FqLeYTxAIEGitQTFyip9mN1M4sJmZ5kd0dxeFzyA1Wu-968L6fhFUkZMyYUJLIek8rTqOMBM-uABRhaY0QXQTMEFJQno_VJGCqSCmp-6RIKkRB4Mv2FyMnyxReMJDKFkY8QNE22L1Yg-0e63m2J_vXTtraTIPaWINmf79l7Xx6pqmlN1PvxjPoLXRNg</recordid><startdate>20230425</startdate><enddate>20230425</enddate><creator>PAN TAO</creator><creator>XIAO HAIZHU</creator><creator>QIU YUANXI</creator><creator>XU KEYING</creator><creator>YI LIBANG</creator><creator>ZHANG JING</creator><scope>EVB</scope></search><sort><creationdate>20230425</creationdate><title>Tower-passing construction method for main tower internally-penetrating type steel box girder cable bearing bridge</title><author>PAN TAO ; XIAO HAIZHU ; QIU YUANXI ; XU KEYING ; YI LIBANG ; ZHANG JING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116005570A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>PAN TAO</creatorcontrib><creatorcontrib>XIAO HAIZHU</creatorcontrib><creatorcontrib>QIU YUANXI</creatorcontrib><creatorcontrib>XU KEYING</creatorcontrib><creatorcontrib>YI LIBANG</creatorcontrib><creatorcontrib>ZHANG JING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>PAN TAO</au><au>XIAO HAIZHU</au><au>QIU YUANXI</au><au>XU KEYING</au><au>YI LIBANG</au><au>ZHANG JING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Tower-passing construction method for main tower internally-penetrating type steel box girder cable bearing bridge</title><date>2023-04-25</date><risdate>2023</risdate><abstract>The invention relates to a tower-passing construction method for a main tower internally-penetrating type steel box girder cable bearing bridge. The tower-passing construction method comprises the steps that a to-be-installed steel box girder is divided into side steel box girder sections, a middle steel box girder section and a steel cross beam section; the side steel box girder sections and the middle steel box girder sections are sequentially hoisted to the slide way girder on the main span side; the side steel box girder sections and the middle steel box girder sections are longitudinally pushed to the designed positions towards the side span sides correspondingly, and are spliced from front to back to form side steel box girders and middle steel box girders; and the multiple steel cross beam sections are hoisted to the positions between the corresponding side steel box girders and the corresponding middle steel box girders, butt joint is completed, and the whole side span steel box girder is formed. The</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN116005570A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Tower-passing construction method for main tower internally-penetrating type steel box girder cable bearing bridge
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-15T15%3A00%3A21IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=PAN%20TAO&rft.date=2023-04-25&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116005570A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true