Tower-passing construction method for main tower internally-penetrating type steel box girder cable bearing bridge
The invention relates to a tower-passing construction method for a main tower internally-penetrating type steel box girder cable bearing bridge. The tower-passing construction method comprises the steps that a to-be-installed steel box girder is divided into side steel box girder sections, a middle...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | PAN TAO XIAO HAIZHU QIU YUANXI XU KEYING YI LIBANG ZHANG JING |
description | The invention relates to a tower-passing construction method for a main tower internally-penetrating type steel box girder cable bearing bridge. The tower-passing construction method comprises the steps that a to-be-installed steel box girder is divided into side steel box girder sections, a middle steel box girder section and a steel cross beam section; the side steel box girder sections and the middle steel box girder sections are sequentially hoisted to the slide way girder on the main span side; the side steel box girder sections and the middle steel box girder sections are longitudinally pushed to the designed positions towards the side span sides correspondingly, and are spliced from front to back to form side steel box girders and middle steel box girders; and the multiple steel cross beam sections are hoisted to the positions between the corresponding side steel box girders and the corresponding middle steel box girders, butt joint is completed, and the whole side span steel box girder is formed. The |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116005570A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116005570A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116005570A3</originalsourceid><addsrcrecordid>eNqNzDEKwkAQheE0FqLeYTxAIEGitQTFyip9mN1M4sJmZ5kd0dxeFzyA1Wu-968L6fhFUkZMyYUJLIek8rTqOMBM-uABRhaY0QXQTMEFJQno_VJGCqSCmp-6RIKkRB4Mv2FyMnyxReMJDKFkY8QNE22L1Yg-0e63m2J_vXTtraTIPaWINmf79l7Xx6pqmlN1PvxjPoLXRNg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Tower-passing construction method for main tower internally-penetrating type steel box girder cable bearing bridge</title><source>esp@cenet</source><creator>PAN TAO ; XIAO HAIZHU ; QIU YUANXI ; XU KEYING ; YI LIBANG ; ZHANG JING</creator><creatorcontrib>PAN TAO ; XIAO HAIZHU ; QIU YUANXI ; XU KEYING ; YI LIBANG ; ZHANG JING</creatorcontrib><description>The invention relates to a tower-passing construction method for a main tower internally-penetrating type steel box girder cable bearing bridge. The tower-passing construction method comprises the steps that a to-be-installed steel box girder is divided into side steel box girder sections, a middle steel box girder section and a steel cross beam section; the side steel box girder sections and the middle steel box girder sections are sequentially hoisted to the slide way girder on the main span side; the side steel box girder sections and the middle steel box girder sections are longitudinally pushed to the designed positions towards the side span sides correspondingly, and are spliced from front to back to form side steel box girders and middle steel box girders; and the multiple steel cross beam sections are hoisted to the positions between the corresponding side steel box girders and the corresponding middle steel box girders, butt joint is completed, and the whole side span steel box girder is formed. The</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230425&DB=EPODOC&CC=CN&NR=116005570A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76516</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230425&DB=EPODOC&CC=CN&NR=116005570A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>PAN TAO</creatorcontrib><creatorcontrib>XIAO HAIZHU</creatorcontrib><creatorcontrib>QIU YUANXI</creatorcontrib><creatorcontrib>XU KEYING</creatorcontrib><creatorcontrib>YI LIBANG</creatorcontrib><creatorcontrib>ZHANG JING</creatorcontrib><title>Tower-passing construction method for main tower internally-penetrating type steel box girder cable bearing bridge</title><description>The invention relates to a tower-passing construction method for a main tower internally-penetrating type steel box girder cable bearing bridge. The tower-passing construction method comprises the steps that a to-be-installed steel box girder is divided into side steel box girder sections, a middle steel box girder section and a steel cross beam section; the side steel box girder sections and the middle steel box girder sections are sequentially hoisted to the slide way girder on the main span side; the side steel box girder sections and the middle steel box girder sections are longitudinally pushed to the designed positions towards the side span sides correspondingly, and are spliced from front to back to form side steel box girders and middle steel box girders; and the multiple steel cross beam sections are hoisted to the positions between the corresponding side steel box girders and the corresponding middle steel box girders, butt joint is completed, and the whole side span steel box girder is formed. The</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNzDEKwkAQheE0FqLeYTxAIEGitQTFyip9mN1M4sJmZ5kd0dxeFzyA1Wu-968L6fhFUkZMyYUJLIek8rTqOMBM-uABRhaY0QXQTMEFJQno_VJGCqSCmp-6RIKkRB4Mv2FyMnyxReMJDKFkY8QNE22L1Yg-0e63m2J_vXTtraTIPaWINmf79l7Xx6pqmlN1PvxjPoLXRNg</recordid><startdate>20230425</startdate><enddate>20230425</enddate><creator>PAN TAO</creator><creator>XIAO HAIZHU</creator><creator>QIU YUANXI</creator><creator>XU KEYING</creator><creator>YI LIBANG</creator><creator>ZHANG JING</creator><scope>EVB</scope></search><sort><creationdate>20230425</creationdate><title>Tower-passing construction method for main tower internally-penetrating type steel box girder cable bearing bridge</title><author>PAN TAO ; XIAO HAIZHU ; QIU YUANXI ; XU KEYING ; YI LIBANG ; ZHANG JING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116005570A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>PAN TAO</creatorcontrib><creatorcontrib>XIAO HAIZHU</creatorcontrib><creatorcontrib>QIU YUANXI</creatorcontrib><creatorcontrib>XU KEYING</creatorcontrib><creatorcontrib>YI LIBANG</creatorcontrib><creatorcontrib>ZHANG JING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>PAN TAO</au><au>XIAO HAIZHU</au><au>QIU YUANXI</au><au>XU KEYING</au><au>YI LIBANG</au><au>ZHANG JING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Tower-passing construction method for main tower internally-penetrating type steel box girder cable bearing bridge</title><date>2023-04-25</date><risdate>2023</risdate><abstract>The invention relates to a tower-passing construction method for a main tower internally-penetrating type steel box girder cable bearing bridge. The tower-passing construction method comprises the steps that a to-be-installed steel box girder is divided into side steel box girder sections, a middle steel box girder section and a steel cross beam section; the side steel box girder sections and the middle steel box girder sections are sequentially hoisted to the slide way girder on the main span side; the side steel box girder sections and the middle steel box girder sections are longitudinally pushed to the designed positions towards the side span sides correspondingly, and are spliced from front to back to form side steel box girders and middle steel box girders; and the multiple steel cross beam sections are hoisted to the positions between the corresponding side steel box girders and the corresponding middle steel box girders, butt joint is completed, and the whole side span steel box girder is formed. The</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN116005570A |
source | esp@cenet |
subjects | ASSEMBLY OF BRIDGES CONSTRUCTION OF BRIDGES CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES FIXED CONSTRUCTIONS OR VIADUCTS |
title | Tower-passing construction method for main tower internally-penetrating type steel box girder cable bearing bridge |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-15T15%3A00%3A21IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=PAN%20TAO&rft.date=2023-04-25&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116005570A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |