Template refined management and control method based on BIM technology
The invention discloses a template refined management and control method based on a BIM technology, and relates to the technical field of building construction, and the method comprises the steps: obtaining the design data of a construction section, creating a BIM model of the construction section a...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | WANG GUODONG LI XIAOHUI NIE XIAOHONG LIN SHUHANG LI XIANGHONG |
description | The invention discloses a template refined management and control method based on a BIM technology, and relates to the technical field of building construction, and the method comprises the steps: obtaining the design data of a construction section, creating a BIM model of the construction section according to the design data, and carrying out the deepening processing of the BIM model; performing mold matching calculation based on the deepened BIM model, and exporting mold matching data; and on-site construction is guided according to the mold matching data. The BIM technology is applied to the whole life cycle of design, processing, assembly and turnover of the modular building, fine management of the whole life cycle of the modular building is achieved, various mold matching data are described through digital virtualization and informatization, informatization collaborative design and visual design are achieved, fine management and control are achieved, and the construction efficiency is improved.
本发明公开了一种基 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115952587A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115952587A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115952587A3</originalsourceid><addsrcrecordid>eNqNyjEOwjAMBdAsDAi4gzkAQ0ERMEJFBQNM3SuT_LZIiR01Wbg9DByA6S1vbpoWMQUuoAn9S-ApsvCACCnE4smplEkDRZRRPT05f48KnW93KnCjaNDhvTSznkPG6ufCrJtLW183SNohJ3YQlK5-VJU92q097E-7f84HCFszPg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Template refined management and control method based on BIM technology</title><source>esp@cenet</source><creator>WANG GUODONG ; LI XIAOHUI ; NIE XIAOHONG ; LIN SHUHANG ; LI XIANGHONG</creator><creatorcontrib>WANG GUODONG ; LI XIAOHUI ; NIE XIAOHONG ; LIN SHUHANG ; LI XIANGHONG</creatorcontrib><description>The invention discloses a template refined management and control method based on a BIM technology, and relates to the technical field of building construction, and the method comprises the steps: obtaining the design data of a construction section, creating a BIM model of the construction section according to the design data, and carrying out the deepening processing of the BIM model; performing mold matching calculation based on the deepened BIM model, and exporting mold matching data; and on-site construction is guided according to the mold matching data. The BIM technology is applied to the whole life cycle of design, processing, assembly and turnover of the modular building, fine management of the whole life cycle of the modular building is achieved, various mold matching data are described through digital virtualization and informatization, informatization collaborative design and visual design are achieved, fine management and control are achieved, and the construction efficiency is improved.
本发明公开了一种基</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; ELECTRIC DIGITAL DATA PROCESSING ; PHYSICS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230411&DB=EPODOC&CC=CN&NR=115952587A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76294</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230411&DB=EPODOC&CC=CN&NR=115952587A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG GUODONG</creatorcontrib><creatorcontrib>LI XIAOHUI</creatorcontrib><creatorcontrib>NIE XIAOHONG</creatorcontrib><creatorcontrib>LIN SHUHANG</creatorcontrib><creatorcontrib>LI XIANGHONG</creatorcontrib><title>Template refined management and control method based on BIM technology</title><description>The invention discloses a template refined management and control method based on a BIM technology, and relates to the technical field of building construction, and the method comprises the steps: obtaining the design data of a construction section, creating a BIM model of the construction section according to the design data, and carrying out the deepening processing of the BIM model; performing mold matching calculation based on the deepened BIM model, and exporting mold matching data; and on-site construction is guided according to the mold matching data. The BIM technology is applied to the whole life cycle of design, processing, assembly and turnover of the modular building, fine management of the whole life cycle of the modular building is achieved, various mold matching data are described through digital virtualization and informatization, informatization collaborative design and visual design are achieved, fine management and control are achieved, and the construction efficiency is improved.
本发明公开了一种基</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>ELECTRIC DIGITAL DATA PROCESSING</subject><subject>PHYSICS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyjEOwjAMBdAsDAi4gzkAQ0ERMEJFBQNM3SuT_LZIiR01Wbg9DByA6S1vbpoWMQUuoAn9S-ApsvCACCnE4smplEkDRZRRPT05f48KnW93KnCjaNDhvTSznkPG6ufCrJtLW183SNohJ3YQlK5-VJU92q097E-7f84HCFszPg</recordid><startdate>20230411</startdate><enddate>20230411</enddate><creator>WANG GUODONG</creator><creator>LI XIAOHUI</creator><creator>NIE XIAOHONG</creator><creator>LIN SHUHANG</creator><creator>LI XIANGHONG</creator><scope>EVB</scope></search><sort><creationdate>20230411</creationdate><title>Template refined management and control method based on BIM technology</title><author>WANG GUODONG ; LI XIAOHUI ; NIE XIAOHONG ; LIN SHUHANG ; LI XIANGHONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115952587A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>ELECTRIC DIGITAL DATA PROCESSING</topic><topic>PHYSICS</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG GUODONG</creatorcontrib><creatorcontrib>LI XIAOHUI</creatorcontrib><creatorcontrib>NIE XIAOHONG</creatorcontrib><creatorcontrib>LIN SHUHANG</creatorcontrib><creatorcontrib>LI XIANGHONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG GUODONG</au><au>LI XIAOHUI</au><au>NIE XIAOHONG</au><au>LIN SHUHANG</au><au>LI XIANGHONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Template refined management and control method based on BIM technology</title><date>2023-04-11</date><risdate>2023</risdate><abstract>The invention discloses a template refined management and control method based on a BIM technology, and relates to the technical field of building construction, and the method comprises the steps: obtaining the design data of a construction section, creating a BIM model of the construction section according to the design data, and carrying out the deepening processing of the BIM model; performing mold matching calculation based on the deepened BIM model, and exporting mold matching data; and on-site construction is guided according to the mold matching data. The BIM technology is applied to the whole life cycle of design, processing, assembly and turnover of the modular building, fine management of the whole life cycle of the modular building is achieved, various mold matching data are described through digital virtualization and informatization, informatization collaborative design and visual design are achieved, fine management and control are achieved, and the construction efficiency is improved.
本发明公开了一种基</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN115952587A |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING ELECTRIC DIGITAL DATA PROCESSING PHYSICS |
title | Template refined management and control method based on BIM technology |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-23T07%3A28%3A03IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20GUODONG&rft.date=2023-04-11&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115952587A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |