Construction method of foundation pit continuous wall
The invention discloses a construction method of a foundation pit continuous wall, and relates to the technical field of deep foundation pit supporting in constructional engineering, a starting well and a receiving well are respectively arranged at four corners of a predicted foundation pit, continu...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | PENG YONGBO LI HUANJIE LIN WEITIAN YE RUICONG DING NING XU JIANDE ZHU GUOCAI YAN XIAOYONG GONG SHENG HE QINGSHENG XIAO RAN ZHONG XIANQI LIN ZHENSHENG SHAO MENGXIN ZHANG SHILIANG LUO TINGYIN CHEN JINYUN |
description | The invention discloses a construction method of a foundation pit continuous wall, and relates to the technical field of deep foundation pit supporting in constructional engineering, a starting well and a receiving well are respectively arranged at four corners of a predicted foundation pit, continuous wall prefabricated blocks are hoisted in the starting well section by section, and a plurality of sections of continuous wall prefabricated blocks form continuous wall prefabricated blocks through temporary fixing measures; every time the excavation of a groove section is completed, a continuous wall precast block is pushed through a pushing system immediately, and the continuous wall precast blocks are installed and pushed repeatedly until the first continuous wall precast block is pushed to the receiving well; and then the pushing direction of the pushing device is adjusted, continuous wall pushing construction between the starting well and the other receiving well continues to be conducted, and after continu |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115949055A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115949055A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115949055A3</originalsourceid><addsrcrecordid>eNrjZDB1zs8rLikqTS7JzM9TyE0tychPUchPU0jLL81LSQQLFmSWKCTn55Vk5pXmlxYrlCfm5PAwsKYl5hSn8kJpbgZFN9cQZw_d1IL8-NTigsTk1LzUknhnP0NDU0sTSwNTU0djYtQAALGELdY</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method of foundation pit continuous wall</title><source>esp@cenet</source><creator>PENG YONGBO ; LI HUANJIE ; LIN WEITIAN ; YE RUICONG ; DING NING ; XU JIANDE ; ZHU GUOCAI ; YAN XIAOYONG ; GONG SHENG ; HE QINGSHENG ; XIAO RAN ; ZHONG XIANQI ; LIN ZHENSHENG ; SHAO MENGXIN ; ZHANG SHILIANG ; LUO TINGYIN ; CHEN JINYUN</creator><creatorcontrib>PENG YONGBO ; LI HUANJIE ; LIN WEITIAN ; YE RUICONG ; DING NING ; XU JIANDE ; ZHU GUOCAI ; YAN XIAOYONG ; GONG SHENG ; HE QINGSHENG ; XIAO RAN ; ZHONG XIANQI ; LIN ZHENSHENG ; SHAO MENGXIN ; ZHANG SHILIANG ; LUO TINGYIN ; CHEN JINYUN</creatorcontrib><description>The invention discloses a construction method of a foundation pit continuous wall, and relates to the technical field of deep foundation pit supporting in constructional engineering, a starting well and a receiving well are respectively arranged at four corners of a predicted foundation pit, continuous wall prefabricated blocks are hoisted in the starting well section by section, and a plurality of sections of continuous wall prefabricated blocks form continuous wall prefabricated blocks through temporary fixing measures; every time the excavation of a groove section is completed, a continuous wall precast block is pushed through a pushing system immediately, and the continuous wall precast blocks are installed and pushed repeatedly until the first continuous wall precast block is pushed to the receiving well; and then the pushing direction of the pushing device is adjusted, continuous wall pushing construction between the starting well and the other receiving well continues to be conducted, and after continu</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230411&DB=EPODOC&CC=CN&NR=115949055A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25569,76552</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230411&DB=EPODOC&CC=CN&NR=115949055A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>PENG YONGBO</creatorcontrib><creatorcontrib>LI HUANJIE</creatorcontrib><creatorcontrib>LIN WEITIAN</creatorcontrib><creatorcontrib>YE RUICONG</creatorcontrib><creatorcontrib>DING NING</creatorcontrib><creatorcontrib>XU JIANDE</creatorcontrib><creatorcontrib>ZHU GUOCAI</creatorcontrib><creatorcontrib>YAN XIAOYONG</creatorcontrib><creatorcontrib>GONG SHENG</creatorcontrib><creatorcontrib>HE QINGSHENG</creatorcontrib><creatorcontrib>XIAO RAN</creatorcontrib><creatorcontrib>ZHONG XIANQI</creatorcontrib><creatorcontrib>LIN ZHENSHENG</creatorcontrib><creatorcontrib>SHAO MENGXIN</creatorcontrib><creatorcontrib>ZHANG SHILIANG</creatorcontrib><creatorcontrib>LUO TINGYIN</creatorcontrib><creatorcontrib>CHEN JINYUN</creatorcontrib><title>Construction method of foundation pit continuous wall</title><description>The invention discloses a construction method of a foundation pit continuous wall, and relates to the technical field of deep foundation pit supporting in constructional engineering, a starting well and a receiving well are respectively arranged at four corners of a predicted foundation pit, continuous wall prefabricated blocks are hoisted in the starting well section by section, and a plurality of sections of continuous wall prefabricated blocks form continuous wall prefabricated blocks through temporary fixing measures; every time the excavation of a groove section is completed, a continuous wall precast block is pushed through a pushing system immediately, and the continuous wall precast blocks are installed and pushed repeatedly until the first continuous wall precast block is pushed to the receiving well; and then the pushing direction of the pushing device is adjusted, continuous wall pushing construction between the starting well and the other receiving well continues to be conducted, and after continu</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDB1zs8rLikqTS7JzM9TyE0tychPUchPU0jLL81LSQQLFmSWKCTn55Vk5pXmlxYrlCfm5PAwsKYl5hSn8kJpbgZFN9cQZw_d1IL8-NTigsTk1LzUknhnP0NDU0sTSwNTU0djYtQAALGELdY</recordid><startdate>20230411</startdate><enddate>20230411</enddate><creator>PENG YONGBO</creator><creator>LI HUANJIE</creator><creator>LIN WEITIAN</creator><creator>YE RUICONG</creator><creator>DING NING</creator><creator>XU JIANDE</creator><creator>ZHU GUOCAI</creator><creator>YAN XIAOYONG</creator><creator>GONG SHENG</creator><creator>HE QINGSHENG</creator><creator>XIAO RAN</creator><creator>ZHONG XIANQI</creator><creator>LIN ZHENSHENG</creator><creator>SHAO MENGXIN</creator><creator>ZHANG SHILIANG</creator><creator>LUO TINGYIN</creator><creator>CHEN JINYUN</creator><scope>EVB</scope></search><sort><creationdate>20230411</creationdate><title>Construction method of foundation pit continuous wall</title><author>PENG YONGBO ; LI HUANJIE ; LIN WEITIAN ; YE RUICONG ; DING NING ; XU JIANDE ; ZHU GUOCAI ; YAN XIAOYONG ; GONG SHENG ; HE QINGSHENG ; XIAO RAN ; ZHONG XIANQI ; LIN ZHENSHENG ; SHAO MENGXIN ; ZHANG SHILIANG ; LUO TINGYIN ; CHEN JINYUN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115949055A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>PENG YONGBO</creatorcontrib><creatorcontrib>LI HUANJIE</creatorcontrib><creatorcontrib>LIN WEITIAN</creatorcontrib><creatorcontrib>YE RUICONG</creatorcontrib><creatorcontrib>DING NING</creatorcontrib><creatorcontrib>XU JIANDE</creatorcontrib><creatorcontrib>ZHU GUOCAI</creatorcontrib><creatorcontrib>YAN XIAOYONG</creatorcontrib><creatorcontrib>GONG SHENG</creatorcontrib><creatorcontrib>HE QINGSHENG</creatorcontrib><creatorcontrib>XIAO RAN</creatorcontrib><creatorcontrib>ZHONG XIANQI</creatorcontrib><creatorcontrib>LIN ZHENSHENG</creatorcontrib><creatorcontrib>SHAO MENGXIN</creatorcontrib><creatorcontrib>ZHANG SHILIANG</creatorcontrib><creatorcontrib>LUO TINGYIN</creatorcontrib><creatorcontrib>CHEN JINYUN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>PENG YONGBO</au><au>LI HUANJIE</au><au>LIN WEITIAN</au><au>YE RUICONG</au><au>DING NING</au><au>XU JIANDE</au><au>ZHU GUOCAI</au><au>YAN XIAOYONG</au><au>GONG SHENG</au><au>HE QINGSHENG</au><au>XIAO RAN</au><au>ZHONG XIANQI</au><au>LIN ZHENSHENG</au><au>SHAO MENGXIN</au><au>ZHANG SHILIANG</au><au>LUO TINGYIN</au><au>CHEN JINYUN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method of foundation pit continuous wall</title><date>2023-04-11</date><risdate>2023</risdate><abstract>The invention discloses a construction method of a foundation pit continuous wall, and relates to the technical field of deep foundation pit supporting in constructional engineering, a starting well and a receiving well are respectively arranged at four corners of a predicted foundation pit, continuous wall prefabricated blocks are hoisted in the starting well section by section, and a plurality of sections of continuous wall prefabricated blocks form continuous wall prefabricated blocks through temporary fixing measures; every time the excavation of a groove section is completed, a continuous wall precast block is pushed through a pushing system immediately, and the continuous wall precast blocks are installed and pushed repeatedly until the first continuous wall precast block is pushed to the receiving well; and then the pushing direction of the pushing device is adjusted, continuous wall pushing construction between the starting well and the other receiving well continues to be conducted, and after continu</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN115949055A |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Construction method of foundation pit continuous wall |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-15T11%3A18%3A05IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=PENG%20YONGBO&rft.date=2023-04-11&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115949055A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |