Construction method of foundation pit continuous wall

The invention discloses a construction method of a foundation pit continuous wall, and relates to the technical field of deep foundation pit supporting in constructional engineering, a starting well and a receiving well are respectively arranged at four corners of a predicted foundation pit, continu...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: PENG YONGBO, LI HUANJIE, LIN WEITIAN, YE RUICONG, DING NING, XU JIANDE, ZHU GUOCAI, YAN XIAOYONG, GONG SHENG, HE QINGSHENG, XIAO RAN, ZHONG XIANQI, LIN ZHENSHENG, SHAO MENGXIN, ZHANG SHILIANG, LUO TINGYIN, CHEN JINYUN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator PENG YONGBO
LI HUANJIE
LIN WEITIAN
YE RUICONG
DING NING
XU JIANDE
ZHU GUOCAI
YAN XIAOYONG
GONG SHENG
HE QINGSHENG
XIAO RAN
ZHONG XIANQI
LIN ZHENSHENG
SHAO MENGXIN
ZHANG SHILIANG
LUO TINGYIN
CHEN JINYUN
description The invention discloses a construction method of a foundation pit continuous wall, and relates to the technical field of deep foundation pit supporting in constructional engineering, a starting well and a receiving well are respectively arranged at four corners of a predicted foundation pit, continuous wall prefabricated blocks are hoisted in the starting well section by section, and a plurality of sections of continuous wall prefabricated blocks form continuous wall prefabricated blocks through temporary fixing measures; every time the excavation of a groove section is completed, a continuous wall precast block is pushed through a pushing system immediately, and the continuous wall precast blocks are installed and pushed repeatedly until the first continuous wall precast block is pushed to the receiving well; and then the pushing direction of the pushing device is adjusted, continuous wall pushing construction between the starting well and the other receiving well continues to be conducted, and after continu
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115949055A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115949055A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115949055A3</originalsourceid><addsrcrecordid>eNrjZDB1zs8rLikqTS7JzM9TyE0tychPUchPU0jLL81LSQQLFmSWKCTn55Vk5pXmlxYrlCfm5PAwsKYl5hSn8kJpbgZFN9cQZw_d1IL8-NTigsTk1LzUknhnP0NDU0sTSwNTU0djYtQAALGELdY</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method of foundation pit continuous wall</title><source>esp@cenet</source><creator>PENG YONGBO ; LI HUANJIE ; LIN WEITIAN ; YE RUICONG ; DING NING ; XU JIANDE ; ZHU GUOCAI ; YAN XIAOYONG ; GONG SHENG ; HE QINGSHENG ; XIAO RAN ; ZHONG XIANQI ; LIN ZHENSHENG ; SHAO MENGXIN ; ZHANG SHILIANG ; LUO TINGYIN ; CHEN JINYUN</creator><creatorcontrib>PENG YONGBO ; LI HUANJIE ; LIN WEITIAN ; YE RUICONG ; DING NING ; XU JIANDE ; ZHU GUOCAI ; YAN XIAOYONG ; GONG SHENG ; HE QINGSHENG ; XIAO RAN ; ZHONG XIANQI ; LIN ZHENSHENG ; SHAO MENGXIN ; ZHANG SHILIANG ; LUO TINGYIN ; CHEN JINYUN</creatorcontrib><description>The invention discloses a construction method of a foundation pit continuous wall, and relates to the technical field of deep foundation pit supporting in constructional engineering, a starting well and a receiving well are respectively arranged at four corners of a predicted foundation pit, continuous wall prefabricated blocks are hoisted in the starting well section by section, and a plurality of sections of continuous wall prefabricated blocks form continuous wall prefabricated blocks through temporary fixing measures; every time the excavation of a groove section is completed, a continuous wall precast block is pushed through a pushing system immediately, and the continuous wall precast blocks are installed and pushed repeatedly until the first continuous wall precast block is pushed to the receiving well; and then the pushing direction of the pushing device is adjusted, continuous wall pushing construction between the starting well and the other receiving well continues to be conducted, and after continu</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230411&amp;DB=EPODOC&amp;CC=CN&amp;NR=115949055A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25569,76552</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230411&amp;DB=EPODOC&amp;CC=CN&amp;NR=115949055A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>PENG YONGBO</creatorcontrib><creatorcontrib>LI HUANJIE</creatorcontrib><creatorcontrib>LIN WEITIAN</creatorcontrib><creatorcontrib>YE RUICONG</creatorcontrib><creatorcontrib>DING NING</creatorcontrib><creatorcontrib>XU JIANDE</creatorcontrib><creatorcontrib>ZHU GUOCAI</creatorcontrib><creatorcontrib>YAN XIAOYONG</creatorcontrib><creatorcontrib>GONG SHENG</creatorcontrib><creatorcontrib>HE QINGSHENG</creatorcontrib><creatorcontrib>XIAO RAN</creatorcontrib><creatorcontrib>ZHONG XIANQI</creatorcontrib><creatorcontrib>LIN ZHENSHENG</creatorcontrib><creatorcontrib>SHAO MENGXIN</creatorcontrib><creatorcontrib>ZHANG SHILIANG</creatorcontrib><creatorcontrib>LUO TINGYIN</creatorcontrib><creatorcontrib>CHEN JINYUN</creatorcontrib><title>Construction method of foundation pit continuous wall</title><description>The invention discloses a construction method of a foundation pit continuous wall, and relates to the technical field of deep foundation pit supporting in constructional engineering, a starting well and a receiving well are respectively arranged at four corners of a predicted foundation pit, continuous wall prefabricated blocks are hoisted in the starting well section by section, and a plurality of sections of continuous wall prefabricated blocks form continuous wall prefabricated blocks through temporary fixing measures; every time the excavation of a groove section is completed, a continuous wall precast block is pushed through a pushing system immediately, and the continuous wall precast blocks are installed and pushed repeatedly until the first continuous wall precast block is pushed to the receiving well; and then the pushing direction of the pushing device is adjusted, continuous wall pushing construction between the starting well and the other receiving well continues to be conducted, and after continu</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDB1zs8rLikqTS7JzM9TyE0tychPUchPU0jLL81LSQQLFmSWKCTn55Vk5pXmlxYrlCfm5PAwsKYl5hSn8kJpbgZFN9cQZw_d1IL8-NTigsTk1LzUknhnP0NDU0sTSwNTU0djYtQAALGELdY</recordid><startdate>20230411</startdate><enddate>20230411</enddate><creator>PENG YONGBO</creator><creator>LI HUANJIE</creator><creator>LIN WEITIAN</creator><creator>YE RUICONG</creator><creator>DING NING</creator><creator>XU JIANDE</creator><creator>ZHU GUOCAI</creator><creator>YAN XIAOYONG</creator><creator>GONG SHENG</creator><creator>HE QINGSHENG</creator><creator>XIAO RAN</creator><creator>ZHONG XIANQI</creator><creator>LIN ZHENSHENG</creator><creator>SHAO MENGXIN</creator><creator>ZHANG SHILIANG</creator><creator>LUO TINGYIN</creator><creator>CHEN JINYUN</creator><scope>EVB</scope></search><sort><creationdate>20230411</creationdate><title>Construction method of foundation pit continuous wall</title><author>PENG YONGBO ; LI HUANJIE ; LIN WEITIAN ; YE RUICONG ; DING NING ; XU JIANDE ; ZHU GUOCAI ; YAN XIAOYONG ; GONG SHENG ; HE QINGSHENG ; XIAO RAN ; ZHONG XIANQI ; LIN ZHENSHENG ; SHAO MENGXIN ; ZHANG SHILIANG ; LUO TINGYIN ; CHEN JINYUN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115949055A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>PENG YONGBO</creatorcontrib><creatorcontrib>LI HUANJIE</creatorcontrib><creatorcontrib>LIN WEITIAN</creatorcontrib><creatorcontrib>YE RUICONG</creatorcontrib><creatorcontrib>DING NING</creatorcontrib><creatorcontrib>XU JIANDE</creatorcontrib><creatorcontrib>ZHU GUOCAI</creatorcontrib><creatorcontrib>YAN XIAOYONG</creatorcontrib><creatorcontrib>GONG SHENG</creatorcontrib><creatorcontrib>HE QINGSHENG</creatorcontrib><creatorcontrib>XIAO RAN</creatorcontrib><creatorcontrib>ZHONG XIANQI</creatorcontrib><creatorcontrib>LIN ZHENSHENG</creatorcontrib><creatorcontrib>SHAO MENGXIN</creatorcontrib><creatorcontrib>ZHANG SHILIANG</creatorcontrib><creatorcontrib>LUO TINGYIN</creatorcontrib><creatorcontrib>CHEN JINYUN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>PENG YONGBO</au><au>LI HUANJIE</au><au>LIN WEITIAN</au><au>YE RUICONG</au><au>DING NING</au><au>XU JIANDE</au><au>ZHU GUOCAI</au><au>YAN XIAOYONG</au><au>GONG SHENG</au><au>HE QINGSHENG</au><au>XIAO RAN</au><au>ZHONG XIANQI</au><au>LIN ZHENSHENG</au><au>SHAO MENGXIN</au><au>ZHANG SHILIANG</au><au>LUO TINGYIN</au><au>CHEN JINYUN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method of foundation pit continuous wall</title><date>2023-04-11</date><risdate>2023</risdate><abstract>The invention discloses a construction method of a foundation pit continuous wall, and relates to the technical field of deep foundation pit supporting in constructional engineering, a starting well and a receiving well are respectively arranged at four corners of a predicted foundation pit, continuous wall prefabricated blocks are hoisted in the starting well section by section, and a plurality of sections of continuous wall prefabricated blocks form continuous wall prefabricated blocks through temporary fixing measures; every time the excavation of a groove section is completed, a continuous wall precast block is pushed through a pushing system immediately, and the continuous wall precast blocks are installed and pushed repeatedly until the first continuous wall precast block is pushed to the receiving well; and then the pushing direction of the pushing device is adjusted, continuous wall pushing construction between the starting well and the other receiving well continues to be conducted, and after continu</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115949055A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Construction method of foundation pit continuous wall
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-15T11%3A18%3A05IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=PENG%20YONGBO&rft.date=2023-04-11&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115949055A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true