Intelligent supervision management and control platform system and method for power grid project
The invention discloses an intelligent supervision management and control platform system and method for a power grid project, relates to the technical field of power grid project supervision, and solves the technical problem that there is no detailed dispatching mode for dispatching engineers and e...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | GAO LEI WU LIHONG PAN ZHIHAO GAO YUANHUI LU YAOWU CHEN ZENGSHUO DENG CHAOXIONG CHEN BANGWEI OU JIANFENG OU JINGFENG KONG FANJUN |
description | The invention discloses an intelligent supervision management and control platform system and method for a power grid project, relates to the technical field of power grid project supervision, and solves the technical problem that there is no detailed dispatching mode for dispatching engineers and ensuring that the construction progress of a called project is not lower than the normal construction progress. Different construction projects are marked as standard parameter projects and standard compensation projects, the standard parameter projects and the standard compensation projects in the same period are subsequently received, data of different employees are analyzed according to working parameters of the different employees, and scheduling data of the next period are generated. The generated scheduling data is transmitted to a scheduling terminal for scheduling processing, after a construction period is finished, corresponding employees are allocated from standard parameter projects, the corresponding emp |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115936385A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115936385A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115936385A3</originalsourceid><addsrcrecordid>eNqNijsOwjAQBdNQIOAOywEoIisIShSBoKGiD1byEozsXcteQNyejzgA1UgzMy7OB1Z47wawUr5FpLvLTpiCZTsgfLTljlphTeIpequ9pED5mRXh2wL0Ih29NUV5INGQXEcxyRWtTotRb33G7MdJMd9tT_V-gSgNcrQtGNrUx7Ks1mZpVtXG_PO8AFKJPj8</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Intelligent supervision management and control platform system and method for power grid project</title><source>esp@cenet</source><creator>GAO LEI ; WU LIHONG ; PAN ZHIHAO ; GAO YUANHUI ; LU YAOWU ; CHEN ZENGSHUO ; DENG CHAOXIONG ; CHEN BANGWEI ; OU JIANFENG ; OU JINGFENG ; KONG FANJUN</creator><creatorcontrib>GAO LEI ; WU LIHONG ; PAN ZHIHAO ; GAO YUANHUI ; LU YAOWU ; CHEN ZENGSHUO ; DENG CHAOXIONG ; CHEN BANGWEI ; OU JIANFENG ; OU JINGFENG ; KONG FANJUN</creatorcontrib><description>The invention discloses an intelligent supervision management and control platform system and method for a power grid project, relates to the technical field of power grid project supervision, and solves the technical problem that there is no detailed dispatching mode for dispatching engineers and ensuring that the construction progress of a called project is not lower than the normal construction progress. Different construction projects are marked as standard parameter projects and standard compensation projects, the standard parameter projects and the standard compensation projects in the same period are subsequently received, data of different employees are analyzed according to working parameters of the different employees, and scheduling data of the next period are generated. The generated scheduling data is transmitted to a scheduling terminal for scheduling processing, after a construction period is finished, corresponding employees are allocated from standard parameter projects, the corresponding emp</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230407&DB=EPODOC&CC=CN&NR=115936385A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230407&DB=EPODOC&CC=CN&NR=115936385A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>GAO LEI</creatorcontrib><creatorcontrib>WU LIHONG</creatorcontrib><creatorcontrib>PAN ZHIHAO</creatorcontrib><creatorcontrib>GAO YUANHUI</creatorcontrib><creatorcontrib>LU YAOWU</creatorcontrib><creatorcontrib>CHEN ZENGSHUO</creatorcontrib><creatorcontrib>DENG CHAOXIONG</creatorcontrib><creatorcontrib>CHEN BANGWEI</creatorcontrib><creatorcontrib>OU JIANFENG</creatorcontrib><creatorcontrib>OU JINGFENG</creatorcontrib><creatorcontrib>KONG FANJUN</creatorcontrib><title>Intelligent supervision management and control platform system and method for power grid project</title><description>The invention discloses an intelligent supervision management and control platform system and method for a power grid project, relates to the technical field of power grid project supervision, and solves the technical problem that there is no detailed dispatching mode for dispatching engineers and ensuring that the construction progress of a called project is not lower than the normal construction progress. Different construction projects are marked as standard parameter projects and standard compensation projects, the standard parameter projects and the standard compensation projects in the same period are subsequently received, data of different employees are analyzed according to working parameters of the different employees, and scheduling data of the next period are generated. The generated scheduling data is transmitted to a scheduling terminal for scheduling processing, after a construction period is finished, corresponding employees are allocated from standard parameter projects, the corresponding emp</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNijsOwjAQBdNQIOAOywEoIisIShSBoKGiD1byEozsXcteQNyejzgA1UgzMy7OB1Z47wawUr5FpLvLTpiCZTsgfLTljlphTeIpequ9pED5mRXh2wL0Ih29NUV5INGQXEcxyRWtTotRb33G7MdJMd9tT_V-gSgNcrQtGNrUx7Ks1mZpVtXG_PO8AFKJPj8</recordid><startdate>20230407</startdate><enddate>20230407</enddate><creator>GAO LEI</creator><creator>WU LIHONG</creator><creator>PAN ZHIHAO</creator><creator>GAO YUANHUI</creator><creator>LU YAOWU</creator><creator>CHEN ZENGSHUO</creator><creator>DENG CHAOXIONG</creator><creator>CHEN BANGWEI</creator><creator>OU JIANFENG</creator><creator>OU JINGFENG</creator><creator>KONG FANJUN</creator><scope>EVB</scope></search><sort><creationdate>20230407</creationdate><title>Intelligent supervision management and control platform system and method for power grid project</title><author>GAO LEI ; WU LIHONG ; PAN ZHIHAO ; GAO YUANHUI ; LU YAOWU ; CHEN ZENGSHUO ; DENG CHAOXIONG ; CHEN BANGWEI ; OU JIANFENG ; OU JINGFENG ; KONG FANJUN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115936385A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>GAO LEI</creatorcontrib><creatorcontrib>WU LIHONG</creatorcontrib><creatorcontrib>PAN ZHIHAO</creatorcontrib><creatorcontrib>GAO YUANHUI</creatorcontrib><creatorcontrib>LU YAOWU</creatorcontrib><creatorcontrib>CHEN ZENGSHUO</creatorcontrib><creatorcontrib>DENG CHAOXIONG</creatorcontrib><creatorcontrib>CHEN BANGWEI</creatorcontrib><creatorcontrib>OU JIANFENG</creatorcontrib><creatorcontrib>OU JINGFENG</creatorcontrib><creatorcontrib>KONG FANJUN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>GAO LEI</au><au>WU LIHONG</au><au>PAN ZHIHAO</au><au>GAO YUANHUI</au><au>LU YAOWU</au><au>CHEN ZENGSHUO</au><au>DENG CHAOXIONG</au><au>CHEN BANGWEI</au><au>OU JIANFENG</au><au>OU JINGFENG</au><au>KONG FANJUN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Intelligent supervision management and control platform system and method for power grid project</title><date>2023-04-07</date><risdate>2023</risdate><abstract>The invention discloses an intelligent supervision management and control platform system and method for a power grid project, relates to the technical field of power grid project supervision, and solves the technical problem that there is no detailed dispatching mode for dispatching engineers and ensuring that the construction progress of a called project is not lower than the normal construction progress. Different construction projects are marked as standard parameter projects and standard compensation projects, the standard parameter projects and the standard compensation projects in the same period are subsequently received, data of different employees are analyzed according to working parameters of the different employees, and scheduling data of the next period are generated. The generated scheduling data is transmitted to a scheduling terminal for scheduling processing, after a construction period is finished, corresponding employees are allocated from standard parameter projects, the corresponding emp</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN115936385A |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | Intelligent supervision management and control platform system and method for power grid project |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-29T01%3A56%3A50IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=GAO%20LEI&rft.date=2023-04-07&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115936385A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |