Drainage method for steel box girder bridge floor

The invention discloses a steel box girder bridge floor drainage method, and relates to the technical field of bridge floor drainage, the method comprises the following steps: 1, steel plate installation and asphalt paving: after the whole construction of a steel box girder is completed, carrying ou...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: PAN CHANGSHENG, GAO CHANG, GENG LIWEI, FU JIN, HE MINGTANG, ZOU QIANG, LEI ZUNGUI, MARIZO, YE XINPENG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator PAN CHANGSHENG
GAO CHANG
GENG LIWEI
FU JIN
HE MINGTANG
ZOU QIANG
LEI ZUNGUI
MARIZO
YE XINPENG
description The invention discloses a steel box girder bridge floor drainage method, and relates to the technical field of bridge floor drainage, the method comprises the following steps: 1, steel plate installation and asphalt paving: after the whole construction of a steel box girder is completed, carrying out sand blasting derusting on a steel bridge floor, then carrying out steel plate installation, and finally carrying out asphalt paving on the bridge floor; the prefabricated drainage ditches and the drainage grooves are installed after asphalt paving is completed, the prefabricated drainage ditches are formed in the sides, away from the steel bridge deck, of the steel plates, and the drainage grooves are installed in the prefabricated drainage ditches; by arranging the steel plate, the paver can pave a bridge deck more quickly and more accurately; precision of steel bridge deck pavement construction is guaranteed, asphalt pavement amount is saved, asphalt construction efficiency is improved, drainage capacity of dr
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115897381A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115897381A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115897381A3</originalsourceid><addsrcrecordid>eNrjZDB0KUrMzEtMT1XITS3JyE9RSMsvUiguSU3NUUjKr1BIzyxKSS1SSCrKTAEqScvJzy_iYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhqYWlubGFoaOxsSoAQBsQStj</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Drainage method for steel box girder bridge floor</title><source>esp@cenet</source><creator>PAN CHANGSHENG ; GAO CHANG ; GENG LIWEI ; FU JIN ; HE MINGTANG ; ZOU QIANG ; LEI ZUNGUI ; MARIZO ; YE XINPENG</creator><creatorcontrib>PAN CHANGSHENG ; GAO CHANG ; GENG LIWEI ; FU JIN ; HE MINGTANG ; ZOU QIANG ; LEI ZUNGUI ; MARIZO ; YE XINPENG</creatorcontrib><description>The invention discloses a steel box girder bridge floor drainage method, and relates to the technical field of bridge floor drainage, the method comprises the following steps: 1, steel plate installation and asphalt paving: after the whole construction of a steel box girder is completed, carrying out sand blasting derusting on a steel bridge floor, then carrying out steel plate installation, and finally carrying out asphalt paving on the bridge floor; the prefabricated drainage ditches and the drainage grooves are installed after asphalt paving is completed, the prefabricated drainage ditches are formed in the sides, away from the steel bridge deck, of the steel plates, and the drainage grooves are installed in the prefabricated drainage ditches; by arranging the steel plate, the paver can pave a bridge deck more quickly and more accurately; precision of steel bridge deck pavement construction is guaranteed, asphalt pavement amount is saved, asphalt construction efficiency is improved, drainage capacity of dr</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CESSPOOLS ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS ; SEWERAGE ; SEWERS ; WATER SUPPLY</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230404&amp;DB=EPODOC&amp;CC=CN&amp;NR=115897381A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25544,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230404&amp;DB=EPODOC&amp;CC=CN&amp;NR=115897381A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>PAN CHANGSHENG</creatorcontrib><creatorcontrib>GAO CHANG</creatorcontrib><creatorcontrib>GENG LIWEI</creatorcontrib><creatorcontrib>FU JIN</creatorcontrib><creatorcontrib>HE MINGTANG</creatorcontrib><creatorcontrib>ZOU QIANG</creatorcontrib><creatorcontrib>LEI ZUNGUI</creatorcontrib><creatorcontrib>MARIZO</creatorcontrib><creatorcontrib>YE XINPENG</creatorcontrib><title>Drainage method for steel box girder bridge floor</title><description>The invention discloses a steel box girder bridge floor drainage method, and relates to the technical field of bridge floor drainage, the method comprises the following steps: 1, steel plate installation and asphalt paving: after the whole construction of a steel box girder is completed, carrying out sand blasting derusting on a steel bridge floor, then carrying out steel plate installation, and finally carrying out asphalt paving on the bridge floor; the prefabricated drainage ditches and the drainage grooves are installed after asphalt paving is completed, the prefabricated drainage ditches are formed in the sides, away from the steel bridge deck, of the steel plates, and the drainage grooves are installed in the prefabricated drainage ditches; by arranging the steel plate, the paver can pave a bridge deck more quickly and more accurately; precision of steel bridge deck pavement construction is guaranteed, asphalt pavement amount is saved, asphalt construction efficiency is improved, drainage capacity of dr</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CESSPOOLS</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><subject>SEWERAGE</subject><subject>SEWERS</subject><subject>WATER SUPPLY</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDB0KUrMzEtMT1XITS3JyE9RSMsvUiguSU3NUUjKr1BIzyxKSS1SSCrKTAEqScvJzy_iYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhqYWlubGFoaOxsSoAQBsQStj</recordid><startdate>20230404</startdate><enddate>20230404</enddate><creator>PAN CHANGSHENG</creator><creator>GAO CHANG</creator><creator>GENG LIWEI</creator><creator>FU JIN</creator><creator>HE MINGTANG</creator><creator>ZOU QIANG</creator><creator>LEI ZUNGUI</creator><creator>MARIZO</creator><creator>YE XINPENG</creator><scope>EVB</scope></search><sort><creationdate>20230404</creationdate><title>Drainage method for steel box girder bridge floor</title><author>PAN CHANGSHENG ; GAO CHANG ; GENG LIWEI ; FU JIN ; HE MINGTANG ; ZOU QIANG ; LEI ZUNGUI ; MARIZO ; YE XINPENG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115897381A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CESSPOOLS</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><topic>SEWERAGE</topic><topic>SEWERS</topic><topic>WATER SUPPLY</topic><toplevel>online_resources</toplevel><creatorcontrib>PAN CHANGSHENG</creatorcontrib><creatorcontrib>GAO CHANG</creatorcontrib><creatorcontrib>GENG LIWEI</creatorcontrib><creatorcontrib>FU JIN</creatorcontrib><creatorcontrib>HE MINGTANG</creatorcontrib><creatorcontrib>ZOU QIANG</creatorcontrib><creatorcontrib>LEI ZUNGUI</creatorcontrib><creatorcontrib>MARIZO</creatorcontrib><creatorcontrib>YE XINPENG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>PAN CHANGSHENG</au><au>GAO CHANG</au><au>GENG LIWEI</au><au>FU JIN</au><au>HE MINGTANG</au><au>ZOU QIANG</au><au>LEI ZUNGUI</au><au>MARIZO</au><au>YE XINPENG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Drainage method for steel box girder bridge floor</title><date>2023-04-04</date><risdate>2023</risdate><abstract>The invention discloses a steel box girder bridge floor drainage method, and relates to the technical field of bridge floor drainage, the method comprises the following steps: 1, steel plate installation and asphalt paving: after the whole construction of a steel box girder is completed, carrying out sand blasting derusting on a steel bridge floor, then carrying out steel plate installation, and finally carrying out asphalt paving on the bridge floor; the prefabricated drainage ditches and the drainage grooves are installed after asphalt paving is completed, the prefabricated drainage ditches are formed in the sides, away from the steel bridge deck, of the steel plates, and the drainage grooves are installed in the prefabricated drainage ditches; by arranging the steel plate, the paver can pave a bridge deck more quickly and more accurately; precision of steel bridge deck pavement construction is guaranteed, asphalt pavement amount is saved, asphalt construction efficiency is improved, drainage capacity of dr</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115897381A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CESSPOOLS
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
SEWERAGE
SEWERS
WATER SUPPLY
title Drainage method for steel box girder bridge floor
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-28T05%3A26%3A57IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=PAN%20CHANGSHENG&rft.date=2023-04-04&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115897381A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true