Construction method of prestressed pipe pile group close to deep foundation pit engineering

The invention relates to a construction method of a prestressed pipe pile group close to a deep foundation pit project. The construction method comprises the following steps: constructing at least one row of stress release holes between a prestressed pipe pile group construction area and an adjacent...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHEN YANG, WANG FANGLIANG, TAN PAN, CAO CHUANWEI, ZHANG YONGHUAN, CHEN WENJIE, LIU YINGLONG, FENG ZHENSHUO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator CHEN YANG
WANG FANGLIANG
TAN PAN
CAO CHUANWEI
ZHANG YONGHUAN
CHEN WENJIE
LIU YINGLONG
FENG ZHENSHUO
description The invention relates to a construction method of a prestressed pipe pile group close to a deep foundation pit project. The construction method comprises the following steps: constructing at least one row of stress release holes between a prestressed pipe pile group construction area and an adjacent first foundation pit in a second foundation pit needing prestressed pipe pile group construction; constructing an anti-extrusion ditch between the stress release hole and the first foundation pit in the second foundation pit, wherein the anti-extrusion ditch is separated from the stress release hole to the first foundation pit; the prestressed pipe piles in m * n (m is the number of rows and n is the number of columns) matrix type distribution are subjected to construction column by column according to the sequence from 1 to m, the first row is relatively close to the first foundation pit, and the mth row is relatively far away from the first foundation pit. According to the method, the influence of the prestresse
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115874615A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115874615A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115874615A3</originalsourceid><addsrcrecordid>eNqNi7sKwkAQRdNYiPoP4wdYLBq1lUWxsrKzCCF7s1lYZ4Z9_L9B_ACbe-Bw7rJ5WeFcUh1KEKY3yiSOZCRNmDVyhiMNinkiyCepSkOUDCpCDlAapbLrv3cNhcA-MJAC-3WzGPuYsflx1Wxv16e976DSIWs_gFE6-zCmPZ8OR9Ne9v80H8LCPA4</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method of prestressed pipe pile group close to deep foundation pit engineering</title><source>esp@cenet</source><creator>CHEN YANG ; WANG FANGLIANG ; TAN PAN ; CAO CHUANWEI ; ZHANG YONGHUAN ; CHEN WENJIE ; LIU YINGLONG ; FENG ZHENSHUO</creator><creatorcontrib>CHEN YANG ; WANG FANGLIANG ; TAN PAN ; CAO CHUANWEI ; ZHANG YONGHUAN ; CHEN WENJIE ; LIU YINGLONG ; FENG ZHENSHUO</creatorcontrib><description>The invention relates to a construction method of a prestressed pipe pile group close to a deep foundation pit project. The construction method comprises the following steps: constructing at least one row of stress release holes between a prestressed pipe pile group construction area and an adjacent first foundation pit in a second foundation pit needing prestressed pipe pile group construction; constructing an anti-extrusion ditch between the stress release hole and the first foundation pit in the second foundation pit, wherein the anti-extrusion ditch is separated from the stress release hole to the first foundation pit; the prestressed pipe piles in m * n (m is the number of rows and n is the number of columns) matrix type distribution are subjected to construction column by column according to the sequence from 1 to m, the first row is relatively close to the first foundation pit, and the mth row is relatively far away from the first foundation pit. According to the method, the influence of the prestresse</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230331&amp;DB=EPODOC&amp;CC=CN&amp;NR=115874615A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,778,883,25547,76298</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230331&amp;DB=EPODOC&amp;CC=CN&amp;NR=115874615A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHEN YANG</creatorcontrib><creatorcontrib>WANG FANGLIANG</creatorcontrib><creatorcontrib>TAN PAN</creatorcontrib><creatorcontrib>CAO CHUANWEI</creatorcontrib><creatorcontrib>ZHANG YONGHUAN</creatorcontrib><creatorcontrib>CHEN WENJIE</creatorcontrib><creatorcontrib>LIU YINGLONG</creatorcontrib><creatorcontrib>FENG ZHENSHUO</creatorcontrib><title>Construction method of prestressed pipe pile group close to deep foundation pit engineering</title><description>The invention relates to a construction method of a prestressed pipe pile group close to a deep foundation pit project. The construction method comprises the following steps: constructing at least one row of stress release holes between a prestressed pipe pile group construction area and an adjacent first foundation pit in a second foundation pit needing prestressed pipe pile group construction; constructing an anti-extrusion ditch between the stress release hole and the first foundation pit in the second foundation pit, wherein the anti-extrusion ditch is separated from the stress release hole to the first foundation pit; the prestressed pipe piles in m * n (m is the number of rows and n is the number of columns) matrix type distribution are subjected to construction column by column according to the sequence from 1 to m, the first row is relatively close to the first foundation pit, and the mth row is relatively far away from the first foundation pit. According to the method, the influence of the prestresse</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNi7sKwkAQRdNYiPoP4wdYLBq1lUWxsrKzCCF7s1lYZ4Z9_L9B_ACbe-Bw7rJ5WeFcUh1KEKY3yiSOZCRNmDVyhiMNinkiyCepSkOUDCpCDlAapbLrv3cNhcA-MJAC-3WzGPuYsflx1Wxv16e976DSIWs_gFE6-zCmPZ8OR9Ne9v80H8LCPA4</recordid><startdate>20230331</startdate><enddate>20230331</enddate><creator>CHEN YANG</creator><creator>WANG FANGLIANG</creator><creator>TAN PAN</creator><creator>CAO CHUANWEI</creator><creator>ZHANG YONGHUAN</creator><creator>CHEN WENJIE</creator><creator>LIU YINGLONG</creator><creator>FENG ZHENSHUO</creator><scope>EVB</scope></search><sort><creationdate>20230331</creationdate><title>Construction method of prestressed pipe pile group close to deep foundation pit engineering</title><author>CHEN YANG ; WANG FANGLIANG ; TAN PAN ; CAO CHUANWEI ; ZHANG YONGHUAN ; CHEN WENJIE ; LIU YINGLONG ; FENG ZHENSHUO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115874615A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>CHEN YANG</creatorcontrib><creatorcontrib>WANG FANGLIANG</creatorcontrib><creatorcontrib>TAN PAN</creatorcontrib><creatorcontrib>CAO CHUANWEI</creatorcontrib><creatorcontrib>ZHANG YONGHUAN</creatorcontrib><creatorcontrib>CHEN WENJIE</creatorcontrib><creatorcontrib>LIU YINGLONG</creatorcontrib><creatorcontrib>FENG ZHENSHUO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHEN YANG</au><au>WANG FANGLIANG</au><au>TAN PAN</au><au>CAO CHUANWEI</au><au>ZHANG YONGHUAN</au><au>CHEN WENJIE</au><au>LIU YINGLONG</au><au>FENG ZHENSHUO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method of prestressed pipe pile group close to deep foundation pit engineering</title><date>2023-03-31</date><risdate>2023</risdate><abstract>The invention relates to a construction method of a prestressed pipe pile group close to a deep foundation pit project. The construction method comprises the following steps: constructing at least one row of stress release holes between a prestressed pipe pile group construction area and an adjacent first foundation pit in a second foundation pit needing prestressed pipe pile group construction; constructing an anti-extrusion ditch between the stress release hole and the first foundation pit in the second foundation pit, wherein the anti-extrusion ditch is separated from the stress release hole to the first foundation pit; the prestressed pipe piles in m * n (m is the number of rows and n is the number of columns) matrix type distribution are subjected to construction column by column according to the sequence from 1 to m, the first row is relatively close to the first foundation pit, and the mth row is relatively far away from the first foundation pit. According to the method, the influence of the prestresse</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115874615A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Construction method of prestressed pipe pile group close to deep foundation pit engineering
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-16T16%3A07%3A25IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHEN%20YANG&rft.date=2023-03-31&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115874615A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true