Earthwork transfer bridge for large foundation pit

The earthwork transfer bridge for the large foundation pit comprises symmetrically-arranged bridge bodies, each bridge body comprises symmetrically-arranged lower beam frames, a plurality of triangular steel frames are installed above the lower beam frames, an upper beam frame is fixedly connected t...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: QIN JIANYOU, WANG WEIHUA
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator QIN JIANYOU
WANG WEIHUA
description The earthwork transfer bridge for the large foundation pit comprises symmetrically-arranged bridge bodies, each bridge body comprises symmetrically-arranged lower beam frames, a plurality of triangular steel frames are installed above the lower beam frames, an upper beam frame is fixedly connected to the tops of the triangular steel frames, the lower beam frames of the two bridge bodies are connected through a connecting mechanism, and a lifting bucket is arranged between the two bridge bodies. The two sides of the lifting bucket are connected with the lifting mechanism through steel ropes, the lifting mechanism is fixedly installed at the end, close to the connecting mechanism, of the upper beam frame, the stand columns are symmetrically and fixedly installed between the lower beam frame and the upper beam frame and fixedly installed at the ends, close to the connecting mechanism, of the lower beam frame and the upper beam frame, and the material guiding mechanism is fixedly installed between the stand colum
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115852807A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115852807A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115852807A3</originalsourceid><addsrcrecordid>eNrjZDByTSwqySjPL8pWKClKzCtOSy1SSCrKTElPVUjLL1LISSwCs0rzUhJLMvPzFAoyS3gYWNMSc4pTeaE0N4Oim2uIs4duakF-fGpxQWJyal5qSbyzn6GhqYWpkYWBuaMxMWoA4QwsQg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Earthwork transfer bridge for large foundation pit</title><source>esp@cenet</source><creator>QIN JIANYOU ; WANG WEIHUA</creator><creatorcontrib>QIN JIANYOU ; WANG WEIHUA</creatorcontrib><description>The earthwork transfer bridge for the large foundation pit comprises symmetrically-arranged bridge bodies, each bridge body comprises symmetrically-arranged lower beam frames, a plurality of triangular steel frames are installed above the lower beam frames, an upper beam frame is fixedly connected to the tops of the triangular steel frames, the lower beam frames of the two bridge bodies are connected through a connecting mechanism, and a lifting bucket is arranged between the two bridge bodies. The two sides of the lifting bucket are connected with the lifting mechanism through steel ropes, the lifting mechanism is fixedly installed at the end, close to the connecting mechanism, of the upper beam frame, the stand columns are symmetrically and fixedly installed between the lower beam frame and the upper beam frame and fixedly installed at the ends, close to the connecting mechanism, of the lower beam frame and the upper beam frame, and the material guiding mechanism is fixedly installed between the stand colum</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HAULING ; HOISTING ; HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDEDFOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCEDIRECTLY TO THE SURFACE OF A LOAD ; HYDRAULIC ENGINEERING ; LIFTING ; OR VIADUCTS ; PERFORMING OPERATIONS ; SOIL SHIFTING ; TRANSPORTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230328&amp;DB=EPODOC&amp;CC=CN&amp;NR=115852807A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230328&amp;DB=EPODOC&amp;CC=CN&amp;NR=115852807A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>QIN JIANYOU</creatorcontrib><creatorcontrib>WANG WEIHUA</creatorcontrib><title>Earthwork transfer bridge for large foundation pit</title><description>The earthwork transfer bridge for the large foundation pit comprises symmetrically-arranged bridge bodies, each bridge body comprises symmetrically-arranged lower beam frames, a plurality of triangular steel frames are installed above the lower beam frames, an upper beam frame is fixedly connected to the tops of the triangular steel frames, the lower beam frames of the two bridge bodies are connected through a connecting mechanism, and a lifting bucket is arranged between the two bridge bodies. The two sides of the lifting bucket are connected with the lifting mechanism through steel ropes, the lifting mechanism is fixedly installed at the end, close to the connecting mechanism, of the upper beam frame, the stand columns are symmetrically and fixedly installed between the lower beam frame and the upper beam frame and fixedly installed at the ends, close to the connecting mechanism, of the lower beam frame and the upper beam frame, and the material guiding mechanism is fixedly installed between the stand colum</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HAULING</subject><subject>HOISTING</subject><subject>HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDEDFOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCEDIRECTLY TO THE SURFACE OF A LOAD</subject><subject>HYDRAULIC ENGINEERING</subject><subject>LIFTING</subject><subject>OR VIADUCTS</subject><subject>PERFORMING OPERATIONS</subject><subject>SOIL SHIFTING</subject><subject>TRANSPORTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDByTSwqySjPL8pWKClKzCtOSy1SSCrKTElPVUjLL1LISSwCs0rzUhJLMvPzFAoyS3gYWNMSc4pTeaE0N4Oim2uIs4duakF-fGpxQWJyal5qSbyzn6GhqYWpkYWBuaMxMWoA4QwsQg</recordid><startdate>20230328</startdate><enddate>20230328</enddate><creator>QIN JIANYOU</creator><creator>WANG WEIHUA</creator><scope>EVB</scope></search><sort><creationdate>20230328</creationdate><title>Earthwork transfer bridge for large foundation pit</title><author>QIN JIANYOU ; WANG WEIHUA</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115852807A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HAULING</topic><topic>HOISTING</topic><topic>HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDEDFOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCEDIRECTLY TO THE SURFACE OF A LOAD</topic><topic>HYDRAULIC ENGINEERING</topic><topic>LIFTING</topic><topic>OR VIADUCTS</topic><topic>PERFORMING OPERATIONS</topic><topic>SOIL SHIFTING</topic><topic>TRANSPORTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>QIN JIANYOU</creatorcontrib><creatorcontrib>WANG WEIHUA</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>QIN JIANYOU</au><au>WANG WEIHUA</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Earthwork transfer bridge for large foundation pit</title><date>2023-03-28</date><risdate>2023</risdate><abstract>The earthwork transfer bridge for the large foundation pit comprises symmetrically-arranged bridge bodies, each bridge body comprises symmetrically-arranged lower beam frames, a plurality of triangular steel frames are installed above the lower beam frames, an upper beam frame is fixedly connected to the tops of the triangular steel frames, the lower beam frames of the two bridge bodies are connected through a connecting mechanism, and a lifting bucket is arranged between the two bridge bodies. The two sides of the lifting bucket are connected with the lifting mechanism through steel ropes, the lifting mechanism is fixedly installed at the end, close to the connecting mechanism, of the upper beam frame, the stand columns are symmetrically and fixedly installed between the lower beam frame and the upper beam frame and fixedly installed at the ends, close to the connecting mechanism, of the lower beam frame and the upper beam frame, and the material guiding mechanism is fixedly installed between the stand colum</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115852807A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HAULING
HOISTING
HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDEDFOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCEDIRECTLY TO THE SURFACE OF A LOAD
HYDRAULIC ENGINEERING
LIFTING
OR VIADUCTS
PERFORMING OPERATIONS
SOIL SHIFTING
TRANSPORTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Earthwork transfer bridge for large foundation pit
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-09T13%3A53%3A22IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=QIN%20JIANYOU&rft.date=2023-03-28&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115852807A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true