Cover beam construction process
The invention discloses a capping beam construction technology which comprises the following steps that S1, the lower half portion of a capping beam is prefabricated in a prefabricating field, a plurality of cast-in-place holes penetrating through the lower half portion of the capping beam need to b...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | YAN HUATANG LIN YING LIU ZHIJUN DAI XIANGUO ZHONG SHAOMIN HE LING ZHANG XIMING ZHANG GUANGHUI |
description | The invention discloses a capping beam construction technology which comprises the following steps that S1, the lower half portion of a capping beam is prefabricated in a prefabricating field, a plurality of cast-in-place holes penetrating through the lower half portion of the capping beam need to be reserved when the lower half portion of the capping beam is prefabricated in the prefabricating field, and the diameter of each cast-in-place hole is equal to that of a corresponding pier column; s2, hoops are installed at the preset positions of the pier columns; s3, the lower half part of the bent cap is transported to a construction site; s4, the lower half portion of the cover beam is hoisted, all the cast-in-place holes in the lower half portion of the cover beam are aligned with the corresponding pier columns in the vertical direction, and then the lower half portion of the cover beam is lowered through a hoisting machine till the lower half portion of the cover beam abuts against the hoop; and S5, a first |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115807394A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115807394A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115807394A3</originalsourceid><addsrcrecordid>eNrjZJB3zi9LLVJISk3MVUjOzysuKSpNLsnMz1MoKMpPTi0u5mFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hoamFgbmxpYmjsbEqAEAPmolMA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Cover beam construction process</title><source>esp@cenet</source><creator>YAN HUATANG ; LIN YING ; LIU ZHIJUN ; DAI XIANGUO ; ZHONG SHAOMIN ; HE LING ; ZHANG XIMING ; ZHANG GUANGHUI</creator><creatorcontrib>YAN HUATANG ; LIN YING ; LIU ZHIJUN ; DAI XIANGUO ; ZHONG SHAOMIN ; HE LING ; ZHANG XIMING ; ZHANG GUANGHUI</creatorcontrib><description>The invention discloses a capping beam construction technology which comprises the following steps that S1, the lower half portion of a capping beam is prefabricated in a prefabricating field, a plurality of cast-in-place holes penetrating through the lower half portion of the capping beam need to be reserved when the lower half portion of the capping beam is prefabricated in the prefabricating field, and the diameter of each cast-in-place hole is equal to that of a corresponding pier column; s2, hoops are installed at the preset positions of the pier columns; s3, the lower half part of the bent cap is transported to a construction site; s4, the lower half portion of the cover beam is hoisted, all the cast-in-place holes in the lower half portion of the cover beam are aligned with the corresponding pier columns in the vertical direction, and then the lower half portion of the cover beam is lowered through a hoisting machine till the lower half portion of the cover beam abuts against the hoop; and S5, a first</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230317&DB=EPODOC&CC=CN&NR=115807394A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230317&DB=EPODOC&CC=CN&NR=115807394A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YAN HUATANG</creatorcontrib><creatorcontrib>LIN YING</creatorcontrib><creatorcontrib>LIU ZHIJUN</creatorcontrib><creatorcontrib>DAI XIANGUO</creatorcontrib><creatorcontrib>ZHONG SHAOMIN</creatorcontrib><creatorcontrib>HE LING</creatorcontrib><creatorcontrib>ZHANG XIMING</creatorcontrib><creatorcontrib>ZHANG GUANGHUI</creatorcontrib><title>Cover beam construction process</title><description>The invention discloses a capping beam construction technology which comprises the following steps that S1, the lower half portion of a capping beam is prefabricated in a prefabricating field, a plurality of cast-in-place holes penetrating through the lower half portion of the capping beam need to be reserved when the lower half portion of the capping beam is prefabricated in the prefabricating field, and the diameter of each cast-in-place hole is equal to that of a corresponding pier column; s2, hoops are installed at the preset positions of the pier columns; s3, the lower half part of the bent cap is transported to a construction site; s4, the lower half portion of the cover beam is hoisted, all the cast-in-place holes in the lower half portion of the cover beam are aligned with the corresponding pier columns in the vertical direction, and then the lower half portion of the cover beam is lowered through a hoisting machine till the lower half portion of the cover beam abuts against the hoop; and S5, a first</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZJB3zi9LLVJISk3MVUjOzysuKSpNLsnMz1MoKMpPTi0u5mFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8c5-hoamFgbmxpYmjsbEqAEAPmolMA</recordid><startdate>20230317</startdate><enddate>20230317</enddate><creator>YAN HUATANG</creator><creator>LIN YING</creator><creator>LIU ZHIJUN</creator><creator>DAI XIANGUO</creator><creator>ZHONG SHAOMIN</creator><creator>HE LING</creator><creator>ZHANG XIMING</creator><creator>ZHANG GUANGHUI</creator><scope>EVB</scope></search><sort><creationdate>20230317</creationdate><title>Cover beam construction process</title><author>YAN HUATANG ; LIN YING ; LIU ZHIJUN ; DAI XIANGUO ; ZHONG SHAOMIN ; HE LING ; ZHANG XIMING ; ZHANG GUANGHUI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115807394A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>YAN HUATANG</creatorcontrib><creatorcontrib>LIN YING</creatorcontrib><creatorcontrib>LIU ZHIJUN</creatorcontrib><creatorcontrib>DAI XIANGUO</creatorcontrib><creatorcontrib>ZHONG SHAOMIN</creatorcontrib><creatorcontrib>HE LING</creatorcontrib><creatorcontrib>ZHANG XIMING</creatorcontrib><creatorcontrib>ZHANG GUANGHUI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YAN HUATANG</au><au>LIN YING</au><au>LIU ZHIJUN</au><au>DAI XIANGUO</au><au>ZHONG SHAOMIN</au><au>HE LING</au><au>ZHANG XIMING</au><au>ZHANG GUANGHUI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Cover beam construction process</title><date>2023-03-17</date><risdate>2023</risdate><abstract>The invention discloses a capping beam construction technology which comprises the following steps that S1, the lower half portion of a capping beam is prefabricated in a prefabricating field, a plurality of cast-in-place holes penetrating through the lower half portion of the capping beam need to be reserved when the lower half portion of the capping beam is prefabricated in the prefabricating field, and the diameter of each cast-in-place hole is equal to that of a corresponding pier column; s2, hoops are installed at the preset positions of the pier columns; s3, the lower half part of the bent cap is transported to a construction site; s4, the lower half portion of the cover beam is hoisted, all the cast-in-place holes in the lower half portion of the cover beam are aligned with the corresponding pier columns in the vertical direction, and then the lower half portion of the cover beam is lowered through a hoisting machine till the lower half portion of the cover beam abuts against the hoop; and S5, a first</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN115807394A |
source | esp@cenet |
subjects | ASSEMBLY OF BRIDGES CONSTRUCTION OF BRIDGES CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES FIXED CONSTRUCTIONS OR VIADUCTS |
title | Cover beam construction process |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-24T13%3A54%3A42IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YAN%20HUATANG&rft.date=2023-03-17&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115807394A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |