Asynchronous support changing construction method for super-large-area deep foundation pit in complex environment
The invention relates to the technical field of foundation pit support changing, in particular to an asynchronous support changing construction method for an ultra-large-area deep foundation pit in a complex environment. Comprising the steps that S1, a foundation pit is divided into a plurality of a...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | JIN XIAOFEI LI CHAOLAI YANG XUDONG ZHANG TINGAN TANG ZISEN ZHAO YANBO LI ZEBIAO HU HEXIANG LI HUANJUN MIAO YINGJING |
description | The invention relates to the technical field of foundation pit support changing, in particular to an asynchronous support changing construction method for an ultra-large-area deep foundation pit in a complex environment. Comprising the steps that S1, a foundation pit is divided into a plurality of areas, the areas are enclosed through surveying and setting out, and the interiors of the areas are cleaned; s2, the elevation is designed, a foundation bed is constructed according to requirements, and a pipeline chamber is poured in the foundation pit; s3, expansive concrete construction is conducted on the main structure pipeline chamber; s4, a support changing platform is installed, and the support changing platform is divided into a first supporting platform, a second supporting platform and a third supporting platform according to the depth of the foundation pit; s5, foam concrete backfilling is conducted after the support changing platform is installed; s6, dismounting a platform plate, a horizontal jack and |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115787672A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115787672A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115787672A3</originalsourceid><addsrcrecordid>eNqNzTEOgkAQBVAaC6PeYTwABRrFlhCNlZU9mSwjbAIz4-yu0duLxgNY_eK_nz_P7lV4setNWFKAkFTFIrgeufPcgRMO0ZKLXhhGir20cBP7QLJ8QOsoRyOElkinJnGLX6s-gudpP-pATyB--OljJI7LbHbDIdDql4tsfTpe63NOKg0FRUdMsakvRbErD-W-3FTbf8wbdk5FHg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Asynchronous support changing construction method for super-large-area deep foundation pit in complex environment</title><source>esp@cenet</source><creator>JIN XIAOFEI ; LI CHAOLAI ; YANG XUDONG ; ZHANG TINGAN ; TANG ZISEN ; ZHAO YANBO ; LI ZEBIAO ; HU HEXIANG ; LI HUANJUN ; MIAO YINGJING</creator><creatorcontrib>JIN XIAOFEI ; LI CHAOLAI ; YANG XUDONG ; ZHANG TINGAN ; TANG ZISEN ; ZHAO YANBO ; LI ZEBIAO ; HU HEXIANG ; LI HUANJUN ; MIAO YINGJING</creatorcontrib><description>The invention relates to the technical field of foundation pit support changing, in particular to an asynchronous support changing construction method for an ultra-large-area deep foundation pit in a complex environment. Comprising the steps that S1, a foundation pit is divided into a plurality of areas, the areas are enclosed through surveying and setting out, and the interiors of the areas are cleaned; s2, the elevation is designed, a foundation bed is constructed according to requirements, and a pipeline chamber is poured in the foundation pit; s3, expansive concrete construction is conducted on the main structure pipeline chamber; s4, a support changing platform is installed, and the support changing platform is divided into a first supporting platform, a second supporting platform and a third supporting platform according to the depth of the foundation pit; s5, foam concrete backfilling is conducted after the support changing platform is installed; s6, dismounting a platform plate, a horizontal jack and</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230314&DB=EPODOC&CC=CN&NR=115787672A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25569,76552</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230314&DB=EPODOC&CC=CN&NR=115787672A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>JIN XIAOFEI</creatorcontrib><creatorcontrib>LI CHAOLAI</creatorcontrib><creatorcontrib>YANG XUDONG</creatorcontrib><creatorcontrib>ZHANG TINGAN</creatorcontrib><creatorcontrib>TANG ZISEN</creatorcontrib><creatorcontrib>ZHAO YANBO</creatorcontrib><creatorcontrib>LI ZEBIAO</creatorcontrib><creatorcontrib>HU HEXIANG</creatorcontrib><creatorcontrib>LI HUANJUN</creatorcontrib><creatorcontrib>MIAO YINGJING</creatorcontrib><title>Asynchronous support changing construction method for super-large-area deep foundation pit in complex environment</title><description>The invention relates to the technical field of foundation pit support changing, in particular to an asynchronous support changing construction method for an ultra-large-area deep foundation pit in a complex environment. Comprising the steps that S1, a foundation pit is divided into a plurality of areas, the areas are enclosed through surveying and setting out, and the interiors of the areas are cleaned; s2, the elevation is designed, a foundation bed is constructed according to requirements, and a pipeline chamber is poured in the foundation pit; s3, expansive concrete construction is conducted on the main structure pipeline chamber; s4, a support changing platform is installed, and the support changing platform is divided into a first supporting platform, a second supporting platform and a third supporting platform according to the depth of the foundation pit; s5, foam concrete backfilling is conducted after the support changing platform is installed; s6, dismounting a platform plate, a horizontal jack and</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNzTEOgkAQBVAaC6PeYTwABRrFlhCNlZU9mSwjbAIz4-yu0duLxgNY_eK_nz_P7lV4setNWFKAkFTFIrgeufPcgRMO0ZKLXhhGir20cBP7QLJ8QOsoRyOElkinJnGLX6s-gudpP-pATyB--OljJI7LbHbDIdDql4tsfTpe63NOKg0FRUdMsakvRbErD-W-3FTbf8wbdk5FHg</recordid><startdate>20230314</startdate><enddate>20230314</enddate><creator>JIN XIAOFEI</creator><creator>LI CHAOLAI</creator><creator>YANG XUDONG</creator><creator>ZHANG TINGAN</creator><creator>TANG ZISEN</creator><creator>ZHAO YANBO</creator><creator>LI ZEBIAO</creator><creator>HU HEXIANG</creator><creator>LI HUANJUN</creator><creator>MIAO YINGJING</creator><scope>EVB</scope></search><sort><creationdate>20230314</creationdate><title>Asynchronous support changing construction method for super-large-area deep foundation pit in complex environment</title><author>JIN XIAOFEI ; LI CHAOLAI ; YANG XUDONG ; ZHANG TINGAN ; TANG ZISEN ; ZHAO YANBO ; LI ZEBIAO ; HU HEXIANG ; LI HUANJUN ; MIAO YINGJING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115787672A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>JIN XIAOFEI</creatorcontrib><creatorcontrib>LI CHAOLAI</creatorcontrib><creatorcontrib>YANG XUDONG</creatorcontrib><creatorcontrib>ZHANG TINGAN</creatorcontrib><creatorcontrib>TANG ZISEN</creatorcontrib><creatorcontrib>ZHAO YANBO</creatorcontrib><creatorcontrib>LI ZEBIAO</creatorcontrib><creatorcontrib>HU HEXIANG</creatorcontrib><creatorcontrib>LI HUANJUN</creatorcontrib><creatorcontrib>MIAO YINGJING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>JIN XIAOFEI</au><au>LI CHAOLAI</au><au>YANG XUDONG</au><au>ZHANG TINGAN</au><au>TANG ZISEN</au><au>ZHAO YANBO</au><au>LI ZEBIAO</au><au>HU HEXIANG</au><au>LI HUANJUN</au><au>MIAO YINGJING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Asynchronous support changing construction method for super-large-area deep foundation pit in complex environment</title><date>2023-03-14</date><risdate>2023</risdate><abstract>The invention relates to the technical field of foundation pit support changing, in particular to an asynchronous support changing construction method for an ultra-large-area deep foundation pit in a complex environment. Comprising the steps that S1, a foundation pit is divided into a plurality of areas, the areas are enclosed through surveying and setting out, and the interiors of the areas are cleaned; s2, the elevation is designed, a foundation bed is constructed according to requirements, and a pipeline chamber is poured in the foundation pit; s3, expansive concrete construction is conducted on the main structure pipeline chamber; s4, a support changing platform is installed, and the support changing platform is divided into a first supporting platform, a second supporting platform and a third supporting platform according to the depth of the foundation pit; s5, foam concrete backfilling is conducted after the support changing platform is installed; s6, dismounting a platform plate, a horizontal jack and</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN115787672A |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Asynchronous support changing construction method for super-large-area deep foundation pit in complex environment |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-11T16%3A17%3A45IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=JIN%20XIAOFEI&rft.date=2023-03-14&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115787672A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |