Unbonded prestressed steel pipe confined concrete prefabricated assembled pier structure and construction method thereof

The invention relates to an unbonded prestressed steel pipe confined concrete prefabricated assembled pier structure and a construction method thereof. The structure comprises a cover beam (2), a stand column (3) and a bearing platform (6) which are sequentially connected through prestressed tendons...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: GAO HAOYUAN, TANG GUOXI, LI JIANZHONG, ZHU JUN, CHEN XIULIN, QIU TIJUN, WANG SHENGBIN, WANG LINKAI, XIA FEILONG, WU ZHIGANG, QU HONGYA
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator GAO HAOYUAN
TANG GUOXI
LI JIANZHONG
ZHU JUN
CHEN XIULIN
QIU TIJUN
WANG SHENGBIN
WANG LINKAI
XIA FEILONG
WU ZHIGANG
QU HONGYA
description The invention relates to an unbonded prestressed steel pipe confined concrete prefabricated assembled pier structure and a construction method thereof. The structure comprises a cover beam (2), a stand column (3) and a bearing platform (6) which are sequentially connected through prestressed tendons (1) in a penetrating mode. A bent cap pre-embedded energy-consuming steel bar (42) is arranged between the bent cap (2) and the stand column (3) in a penetrating mode, and a stand column pre-embedded energy-consuming steel bar (44) is arranged between the stand column (3) and the bearing platform (6) in a penetrating mode. Anchor bearing plates (13) which abut against the cover beam (2) and the bearing platform (6) respectively are arranged on the outer side of the cover beam (2) and the outer side of the bearing platform (6), anchor bolts (12) used for fastening are arranged on the outer sides of the anchor bearing plates (13), and the anchor bearing plates (13) and the anchor bolts (12) are arranged at the ends
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115787443A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115787443A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115787443A3</originalsourceid><addsrcrecordid>eNqNjEEKwjAQRbtxIeod4gFclFbqVoriypWuS5L-0EA7CckUPL5T9QAuhv95_Dfr4vUkE6hHr2JCZrksPTMwqugjlA3kPAmTYhMYy9Bpk7zVLFiLMJlxeeCRxEyz5TlBafo4X-ADqQk8hF7xgITgtsXK6TFj98tNsb9eHu3tgBg65KgtCNy197I8Nqemrqtz9c_mDYTvR78</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Unbonded prestressed steel pipe confined concrete prefabricated assembled pier structure and construction method thereof</title><source>esp@cenet</source><creator>GAO HAOYUAN ; TANG GUOXI ; LI JIANZHONG ; ZHU JUN ; CHEN XIULIN ; QIU TIJUN ; WANG SHENGBIN ; WANG LINKAI ; XIA FEILONG ; WU ZHIGANG ; QU HONGYA</creator><creatorcontrib>GAO HAOYUAN ; TANG GUOXI ; LI JIANZHONG ; ZHU JUN ; CHEN XIULIN ; QIU TIJUN ; WANG SHENGBIN ; WANG LINKAI ; XIA FEILONG ; WU ZHIGANG ; QU HONGYA</creatorcontrib><description>The invention relates to an unbonded prestressed steel pipe confined concrete prefabricated assembled pier structure and a construction method thereof. The structure comprises a cover beam (2), a stand column (3) and a bearing platform (6) which are sequentially connected through prestressed tendons (1) in a penetrating mode. A bent cap pre-embedded energy-consuming steel bar (42) is arranged between the bent cap (2) and the stand column (3) in a penetrating mode, and a stand column pre-embedded energy-consuming steel bar (44) is arranged between the stand column (3) and the bearing platform (6) in a penetrating mode. Anchor bearing plates (13) which abut against the cover beam (2) and the bearing platform (6) respectively are arranged on the outer side of the cover beam (2) and the outer side of the bearing platform (6), anchor bolts (12) used for fastening are arranged on the outer sides of the anchor bearing plates (13), and the anchor bearing plates (13) and the anchor bolts (12) are arranged at the ends</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230314&amp;DB=EPODOC&amp;CC=CN&amp;NR=115787443A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230314&amp;DB=EPODOC&amp;CC=CN&amp;NR=115787443A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>GAO HAOYUAN</creatorcontrib><creatorcontrib>TANG GUOXI</creatorcontrib><creatorcontrib>LI JIANZHONG</creatorcontrib><creatorcontrib>ZHU JUN</creatorcontrib><creatorcontrib>CHEN XIULIN</creatorcontrib><creatorcontrib>QIU TIJUN</creatorcontrib><creatorcontrib>WANG SHENGBIN</creatorcontrib><creatorcontrib>WANG LINKAI</creatorcontrib><creatorcontrib>XIA FEILONG</creatorcontrib><creatorcontrib>WU ZHIGANG</creatorcontrib><creatorcontrib>QU HONGYA</creatorcontrib><title>Unbonded prestressed steel pipe confined concrete prefabricated assembled pier structure and construction method thereof</title><description>The invention relates to an unbonded prestressed steel pipe confined concrete prefabricated assembled pier structure and a construction method thereof. The structure comprises a cover beam (2), a stand column (3) and a bearing platform (6) which are sequentially connected through prestressed tendons (1) in a penetrating mode. A bent cap pre-embedded energy-consuming steel bar (42) is arranged between the bent cap (2) and the stand column (3) in a penetrating mode, and a stand column pre-embedded energy-consuming steel bar (44) is arranged between the stand column (3) and the bearing platform (6) in a penetrating mode. Anchor bearing plates (13) which abut against the cover beam (2) and the bearing platform (6) respectively are arranged on the outer side of the cover beam (2) and the outer side of the bearing platform (6), anchor bolts (12) used for fastening are arranged on the outer sides of the anchor bearing plates (13), and the anchor bearing plates (13) and the anchor bolts (12) are arranged at the ends</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjEEKwjAQRbtxIeod4gFclFbqVoriypWuS5L-0EA7CckUPL5T9QAuhv95_Dfr4vUkE6hHr2JCZrksPTMwqugjlA3kPAmTYhMYy9Bpk7zVLFiLMJlxeeCRxEyz5TlBafo4X-ADqQk8hF7xgITgtsXK6TFj98tNsb9eHu3tgBg65KgtCNy197I8Nqemrqtz9c_mDYTvR78</recordid><startdate>20230314</startdate><enddate>20230314</enddate><creator>GAO HAOYUAN</creator><creator>TANG GUOXI</creator><creator>LI JIANZHONG</creator><creator>ZHU JUN</creator><creator>CHEN XIULIN</creator><creator>QIU TIJUN</creator><creator>WANG SHENGBIN</creator><creator>WANG LINKAI</creator><creator>XIA FEILONG</creator><creator>WU ZHIGANG</creator><creator>QU HONGYA</creator><scope>EVB</scope></search><sort><creationdate>20230314</creationdate><title>Unbonded prestressed steel pipe confined concrete prefabricated assembled pier structure and construction method thereof</title><author>GAO HAOYUAN ; TANG GUOXI ; LI JIANZHONG ; ZHU JUN ; CHEN XIULIN ; QIU TIJUN ; WANG SHENGBIN ; WANG LINKAI ; XIA FEILONG ; WU ZHIGANG ; QU HONGYA</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115787443A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>GAO HAOYUAN</creatorcontrib><creatorcontrib>TANG GUOXI</creatorcontrib><creatorcontrib>LI JIANZHONG</creatorcontrib><creatorcontrib>ZHU JUN</creatorcontrib><creatorcontrib>CHEN XIULIN</creatorcontrib><creatorcontrib>QIU TIJUN</creatorcontrib><creatorcontrib>WANG SHENGBIN</creatorcontrib><creatorcontrib>WANG LINKAI</creatorcontrib><creatorcontrib>XIA FEILONG</creatorcontrib><creatorcontrib>WU ZHIGANG</creatorcontrib><creatorcontrib>QU HONGYA</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>GAO HAOYUAN</au><au>TANG GUOXI</au><au>LI JIANZHONG</au><au>ZHU JUN</au><au>CHEN XIULIN</au><au>QIU TIJUN</au><au>WANG SHENGBIN</au><au>WANG LINKAI</au><au>XIA FEILONG</au><au>WU ZHIGANG</au><au>QU HONGYA</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Unbonded prestressed steel pipe confined concrete prefabricated assembled pier structure and construction method thereof</title><date>2023-03-14</date><risdate>2023</risdate><abstract>The invention relates to an unbonded prestressed steel pipe confined concrete prefabricated assembled pier structure and a construction method thereof. The structure comprises a cover beam (2), a stand column (3) and a bearing platform (6) which are sequentially connected through prestressed tendons (1) in a penetrating mode. A bent cap pre-embedded energy-consuming steel bar (42) is arranged between the bent cap (2) and the stand column (3) in a penetrating mode, and a stand column pre-embedded energy-consuming steel bar (44) is arranged between the stand column (3) and the bearing platform (6) in a penetrating mode. Anchor bearing plates (13) which abut against the cover beam (2) and the bearing platform (6) respectively are arranged on the outer side of the cover beam (2) and the outer side of the bearing platform (6), anchor bolts (12) used for fastening are arranged on the outer sides of the anchor bearing plates (13), and the anchor bearing plates (13) and the anchor bolts (12) are arranged at the ends</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115787443A
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Unbonded prestressed steel pipe confined concrete prefabricated assembled pier structure and construction method thereof
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-26T11%3A53%3A31IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=GAO%20HAOYUAN&rft.date=2023-03-14&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115787443A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true