Integral installation method of pilot door of large container ship in ship body segmentation stage
The invention discloses an integral installation method of a pilot door of a large container ship in a ship body segmentation stage, which comprises the following steps of: closing a door frame and a door plate of the pilot door in a workshop, performing a water tightness test, and integrally hoisti...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | LI MENGHUAI XIAO CHAO WANG CHENGLONG LU XIAOXIANG |
description | The invention discloses an integral installation method of a pilot door of a large container ship in a ship body segmentation stage, which comprises the following steps of: closing a door frame and a door plate of the pilot door in a workshop, performing a water tightness test, and integrally hoisting and welding in place in the ship body segmentation stage. By means of the method, deformation of the pilot door frame and the pilot door can be consistent, it is ensured that the pilot door reaches the watertight state in the closed state, the pilot door is integrally installed in the ship body segmentation stage, a crane can be used for assistance, the installation workload is reduced, and meanwhile the installation safety of the pilot door is improved.
本发明公开了一种大型集装箱船引水员门在船体分段阶段的整体安装方法,该方法是通过将引水员门的门框和门板在车间做好关闭并进行水密性试验后,在船体分段阶段整体吊装并装焊到位。该方法可以使引水员门框和门变形一致,确保引水员门关闭状态下达到水密状态并在船体分段阶段整体安装引水员门,可使用吊车辅助,减少安装的工作量,同时提高了引水员门安装的安全性。 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115783173A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115783173A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115783173A3</originalsourceid><addsrcrecordid>eNqNjDsOwjAQRN1QIOAOywEoLAuFFkVB0FDRR5t441hyvJa9DbfHfA5A9TSambdWwy0KuYwBfCyCIaB4jrCQzGyBJ0g-sIBlzu8UMDuCkaOgj5ShzD7V55cD2ycUcgvV-qOpRkdbtZowFNr9uFH7S_dorwdK3FNJOFIk6du71sfmZHRjzuafzQtqHj49</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Integral installation method of pilot door of large container ship in ship body segmentation stage</title><source>esp@cenet</source><creator>LI MENGHUAI ; XIAO CHAO ; WANG CHENGLONG ; LU XIAOXIANG</creator><creatorcontrib>LI MENGHUAI ; XIAO CHAO ; WANG CHENGLONG ; LU XIAOXIANG</creatorcontrib><description>The invention discloses an integral installation method of a pilot door of a large container ship in a ship body segmentation stage, which comprises the following steps of: closing a door frame and a door plate of the pilot door in a workshop, performing a water tightness test, and integrally hoisting and welding in place in the ship body segmentation stage. By means of the method, deformation of the pilot door frame and the pilot door can be consistent, it is ensured that the pilot door reaches the watertight state in the closed state, the pilot door is integrally installed in the ship body segmentation stage, a crane can be used for assistance, the installation workload is reduced, and meanwhile the installation safety of the pilot door is improved.
本发明公开了一种大型集装箱船引水员门在船体分段阶段的整体安装方法,该方法是通过将引水员门的门框和门板在车间做好关闭并进行水密性试验后,在船体分段阶段整体吊装并装焊到位。该方法可以使引水员门框和门变形一致,确保引水员门关闭状态下达到水密状态并在船体分段阶段整体安装引水员门,可使用吊车辅助,减少安装的工作量,同时提高了引水员门安装的安全性。</description><language>chi ; eng</language><subject>EQUIPMENT FOR SHIPPING ; PERFORMING OPERATIONS ; RELATED EQUIPMENT ; SHIPS OR OTHER WATERBORNE VESSELS ; TRANSPORTING</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230314&DB=EPODOC&CC=CN&NR=115783173A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25562,76317</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230314&DB=EPODOC&CC=CN&NR=115783173A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LI MENGHUAI</creatorcontrib><creatorcontrib>XIAO CHAO</creatorcontrib><creatorcontrib>WANG CHENGLONG</creatorcontrib><creatorcontrib>LU XIAOXIANG</creatorcontrib><title>Integral installation method of pilot door of large container ship in ship body segmentation stage</title><description>The invention discloses an integral installation method of a pilot door of a large container ship in a ship body segmentation stage, which comprises the following steps of: closing a door frame and a door plate of the pilot door in a workshop, performing a water tightness test, and integrally hoisting and welding in place in the ship body segmentation stage. By means of the method, deformation of the pilot door frame and the pilot door can be consistent, it is ensured that the pilot door reaches the watertight state in the closed state, the pilot door is integrally installed in the ship body segmentation stage, a crane can be used for assistance, the installation workload is reduced, and meanwhile the installation safety of the pilot door is improved.
本发明公开了一种大型集装箱船引水员门在船体分段阶段的整体安装方法,该方法是通过将引水员门的门框和门板在车间做好关闭并进行水密性试验后,在船体分段阶段整体吊装并装焊到位。该方法可以使引水员门框和门变形一致,确保引水员门关闭状态下达到水密状态并在船体分段阶段整体安装引水员门,可使用吊车辅助,减少安装的工作量,同时提高了引水员门安装的安全性。</description><subject>EQUIPMENT FOR SHIPPING</subject><subject>PERFORMING OPERATIONS</subject><subject>RELATED EQUIPMENT</subject><subject>SHIPS OR OTHER WATERBORNE VESSELS</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjDsOwjAQRN1QIOAOywEoLAuFFkVB0FDRR5t441hyvJa9DbfHfA5A9TSambdWwy0KuYwBfCyCIaB4jrCQzGyBJ0g-sIBlzu8UMDuCkaOgj5ShzD7V55cD2ycUcgvV-qOpRkdbtZowFNr9uFH7S_dorwdK3FNJOFIk6du71sfmZHRjzuafzQtqHj49</recordid><startdate>20230314</startdate><enddate>20230314</enddate><creator>LI MENGHUAI</creator><creator>XIAO CHAO</creator><creator>WANG CHENGLONG</creator><creator>LU XIAOXIANG</creator><scope>EVB</scope></search><sort><creationdate>20230314</creationdate><title>Integral installation method of pilot door of large container ship in ship body segmentation stage</title><author>LI MENGHUAI ; XIAO CHAO ; WANG CHENGLONG ; LU XIAOXIANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115783173A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EQUIPMENT FOR SHIPPING</topic><topic>PERFORMING OPERATIONS</topic><topic>RELATED EQUIPMENT</topic><topic>SHIPS OR OTHER WATERBORNE VESSELS</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>LI MENGHUAI</creatorcontrib><creatorcontrib>XIAO CHAO</creatorcontrib><creatorcontrib>WANG CHENGLONG</creatorcontrib><creatorcontrib>LU XIAOXIANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LI MENGHUAI</au><au>XIAO CHAO</au><au>WANG CHENGLONG</au><au>LU XIAOXIANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Integral installation method of pilot door of large container ship in ship body segmentation stage</title><date>2023-03-14</date><risdate>2023</risdate><abstract>The invention discloses an integral installation method of a pilot door of a large container ship in a ship body segmentation stage, which comprises the following steps of: closing a door frame and a door plate of the pilot door in a workshop, performing a water tightness test, and integrally hoisting and welding in place in the ship body segmentation stage. By means of the method, deformation of the pilot door frame and the pilot door can be consistent, it is ensured that the pilot door reaches the watertight state in the closed state, the pilot door is integrally installed in the ship body segmentation stage, a crane can be used for assistance, the installation workload is reduced, and meanwhile the installation safety of the pilot door is improved.
本发明公开了一种大型集装箱船引水员门在船体分段阶段的整体安装方法,该方法是通过将引水员门的门框和门板在车间做好关闭并进行水密性试验后,在船体分段阶段整体吊装并装焊到位。该方法可以使引水员门框和门变形一致,确保引水员门关闭状态下达到水密状态并在船体分段阶段整体安装引水员门,可使用吊车辅助,减少安装的工作量,同时提高了引水员门安装的安全性。</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN115783173A |
source | esp@cenet |
subjects | EQUIPMENT FOR SHIPPING PERFORMING OPERATIONS RELATED EQUIPMENT SHIPS OR OTHER WATERBORNE VESSELS TRANSPORTING |
title | Integral installation method of pilot door of large container ship in ship body segmentation stage |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-09T21%3A26%3A07IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LI%20MENGHUAI&rft.date=2023-03-14&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115783173A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |