Fracture influence tunnel cavity advanced reinforcing method
The invention discloses a fracture influence tunnel cavity advanced reinforcement method which comprises the following steps: detecting whether a cavity is formed in a to-be-constructed tunnel surrounding rock or not, and if so, arranging a filler in the cavity for supporting the surrounding rock; a...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHAO GUANGZHU ZHANG YING ZHOU HENG MIAO ZHE HUANG PENG BINPENG ZHOU LIU JING DI SHENGJIE |
description | The invention discloses a fracture influence tunnel cavity advanced reinforcement method which comprises the following steps: detecting whether a cavity is formed in a to-be-constructed tunnel surrounding rock or not, and if so, arranging a filler in the cavity for supporting the surrounding rock; and a pipe shed is arranged in the tunneling direction of the excavation face of the to-be-constructed tunnel, the extending direction of the pipe shed is the same as the tunneling direction, and the pipe shed is used for supporting the surrounding rock. The method has the advantages that the surrounding rock cavity is disposed in advance, the filler is arranged in the cavity, collapse is prevented, pipe shed instability caused by impact of collapse on the pipe shed after pipe shed supporting is avoided, the construction process is simple, and other buildings cannot be damaged. Grouting liquid is injected into the pipe shed; the loose surrounding rock at the top of the excavation face is cemented; a shell-shaped str |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115749810A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115749810A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115749810A3</originalsourceid><addsrcrecordid>eNrjZLBxK0pMLiktSlXIzEvLKU3NS05VKCnNy0vNUUhOLMssqVRITClLBIqmKBSlApXkFyVn5qUr5KaWZOSn8DCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeGc_Q0NTcxNLC0MDR2Ni1AAAI4MwUw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Fracture influence tunnel cavity advanced reinforcing method</title><source>esp@cenet</source><creator>ZHAO GUANGZHU ; ZHANG YING ; ZHOU HENG ; MIAO ZHE ; HUANG PENG ; BINPENG ZHOU ; LIU JING ; DI SHENGJIE</creator><creatorcontrib>ZHAO GUANGZHU ; ZHANG YING ; ZHOU HENG ; MIAO ZHE ; HUANG PENG ; BINPENG ZHOU ; LIU JING ; DI SHENGJIE</creatorcontrib><description>The invention discloses a fracture influence tunnel cavity advanced reinforcement method which comprises the following steps: detecting whether a cavity is formed in a to-be-constructed tunnel surrounding rock or not, and if so, arranging a filler in the cavity for supporting the surrounding rock; and a pipe shed is arranged in the tunneling direction of the excavation face of the to-be-constructed tunnel, the extending direction of the pipe shed is the same as the tunneling direction, and the pipe shed is used for supporting the surrounding rock. The method has the advantages that the surrounding rock cavity is disposed in advance, the filler is arranged in the cavity, collapse is prevented, pipe shed instability caused by impact of collapse on the pipe shed after pipe shed supporting is avoided, the construction process is simple, and other buildings cannot be damaged. Grouting liquid is injected into the pipe shed; the loose surrounding rock at the top of the excavation face is cemented; a shell-shaped str</description><language>chi ; eng</language><subject>EARTH DRILLING ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; GALLERIES ; HYDRAULIC ENGINEERING ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; SOIL SHIFTING ; TUNNELS ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230307&DB=EPODOC&CC=CN&NR=115749810A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230307&DB=EPODOC&CC=CN&NR=115749810A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHAO GUANGZHU</creatorcontrib><creatorcontrib>ZHANG YING</creatorcontrib><creatorcontrib>ZHOU HENG</creatorcontrib><creatorcontrib>MIAO ZHE</creatorcontrib><creatorcontrib>HUANG PENG</creatorcontrib><creatorcontrib>BINPENG ZHOU</creatorcontrib><creatorcontrib>LIU JING</creatorcontrib><creatorcontrib>DI SHENGJIE</creatorcontrib><title>Fracture influence tunnel cavity advanced reinforcing method</title><description>The invention discloses a fracture influence tunnel cavity advanced reinforcement method which comprises the following steps: detecting whether a cavity is formed in a to-be-constructed tunnel surrounding rock or not, and if so, arranging a filler in the cavity for supporting the surrounding rock; and a pipe shed is arranged in the tunneling direction of the excavation face of the to-be-constructed tunnel, the extending direction of the pipe shed is the same as the tunneling direction, and the pipe shed is used for supporting the surrounding rock. The method has the advantages that the surrounding rock cavity is disposed in advance, the filler is arranged in the cavity, collapse is prevented, pipe shed instability caused by impact of collapse on the pipe shed after pipe shed supporting is avoided, the construction process is simple, and other buildings cannot be damaged. Grouting liquid is injected into the pipe shed; the loose surrounding rock at the top of the excavation face is cemented; a shell-shaped str</description><subject>EARTH DRILLING</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>GALLERIES</subject><subject>HYDRAULIC ENGINEERING</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>SOIL SHIFTING</subject><subject>TUNNELS</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLBxK0pMLiktSlXIzEvLKU3NS05VKCnNy0vNUUhOLMssqVRITClLBIqmKBSlApXkFyVn5qUr5KaWZOSn8DCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeGc_Q0NTcxNLC0MDR2Ni1AAAI4MwUw</recordid><startdate>20230307</startdate><enddate>20230307</enddate><creator>ZHAO GUANGZHU</creator><creator>ZHANG YING</creator><creator>ZHOU HENG</creator><creator>MIAO ZHE</creator><creator>HUANG PENG</creator><creator>BINPENG ZHOU</creator><creator>LIU JING</creator><creator>DI SHENGJIE</creator><scope>EVB</scope></search><sort><creationdate>20230307</creationdate><title>Fracture influence tunnel cavity advanced reinforcing method</title><author>ZHAO GUANGZHU ; ZHANG YING ; ZHOU HENG ; MIAO ZHE ; HUANG PENG ; BINPENG ZHOU ; LIU JING ; DI SHENGJIE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115749810A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EARTH DRILLING</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>GALLERIES</topic><topic>HYDRAULIC ENGINEERING</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>SOIL SHIFTING</topic><topic>TUNNELS</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHAO GUANGZHU</creatorcontrib><creatorcontrib>ZHANG YING</creatorcontrib><creatorcontrib>ZHOU HENG</creatorcontrib><creatorcontrib>MIAO ZHE</creatorcontrib><creatorcontrib>HUANG PENG</creatorcontrib><creatorcontrib>BINPENG ZHOU</creatorcontrib><creatorcontrib>LIU JING</creatorcontrib><creatorcontrib>DI SHENGJIE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHAO GUANGZHU</au><au>ZHANG YING</au><au>ZHOU HENG</au><au>MIAO ZHE</au><au>HUANG PENG</au><au>BINPENG ZHOU</au><au>LIU JING</au><au>DI SHENGJIE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Fracture influence tunnel cavity advanced reinforcing method</title><date>2023-03-07</date><risdate>2023</risdate><abstract>The invention discloses a fracture influence tunnel cavity advanced reinforcement method which comprises the following steps: detecting whether a cavity is formed in a to-be-constructed tunnel surrounding rock or not, and if so, arranging a filler in the cavity for supporting the surrounding rock; and a pipe shed is arranged in the tunneling direction of the excavation face of the to-be-constructed tunnel, the extending direction of the pipe shed is the same as the tunneling direction, and the pipe shed is used for supporting the surrounding rock. The method has the advantages that the surrounding rock cavity is disposed in advance, the filler is arranged in the cavity, collapse is prevented, pipe shed instability caused by impact of collapse on the pipe shed after pipe shed supporting is avoided, the construction process is simple, and other buildings cannot be damaged. Grouting liquid is injected into the pipe shed; the loose surrounding rock at the top of the excavation face is cemented; a shell-shaped str</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN115749810A |
source | esp@cenet |
subjects | EARTH DRILLING EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS GALLERIES HYDRAULIC ENGINEERING LARGE UNDERGROUND CHAMBERS MINING SHAFTS SOIL SHIFTING TUNNELS UNDERGROUND OR UNDERWATER STRUCTURES |
title | Fracture influence tunnel cavity advanced reinforcing method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-30T07%3A38%3A31IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHAO%20GUANGZHU&rft.date=2023-03-07&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115749810A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |