Dam and diversion box culvert joint concrete construction temperature control method
The invention discloses a temperature control method for concrete construction of a joint part of a dam and a diversion box culvert. The method comprises the following steps: 1, mixing auxiliary materials; 2, cooling the auxiliary material; 3, mixing the concrete; 4, cooling the initial concrete; 5,...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHANG HULIN QI XIAOLIANG CHEN HOUCAI LIU XIAOQIANG JIE XIANGYANG TAN LONG BAI HAIRUI MA LIQIONG LI MING LIANG ZHANHU LI DONGFENG ZHAO YINGCHAO |
description | The invention discloses a temperature control method for concrete construction of a joint part of a dam and a diversion box culvert. The method comprises the following steps: 1, mixing auxiliary materials; 2, cooling the auxiliary material; 3, mixing the concrete; 4, cooling the initial concrete; 5, pouring concrete; and sixthly, concrete gaps are filled. By arranging the protective shed and the heat insulation layer, the situation that the auxiliary material is heated due to direct sunlight can be avoided, and meanwhile heat transfer between the ground and the auxiliary material can be avoided; the spraying head is used for directly spraying water for cooling, calcium chloride powder mixed in the auxiliary materials is combined, after the water is sprayed through the spraying head, the calcium chloride powder is melted when meeting water and absorbs heat in the auxiliary materials, and then the effect of reducing the temperature of the auxiliary materials is achieved. Initial concrete placed in the storage b |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115748715A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115748715A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115748715A3</originalsourceid><addsrcrecordid>eNqNijEOwjAQBN1QIOAPxwMoLIhCiwKIiip9ZOxDOLJ91vmMeD4E8QCq2dHOXPVHE8EkB84_kYunBDd6ga3howIj-SRgKVlGwWkU4Wpl6gRjRjZS-XsIU4CI8iC3VLO7CQVXPy7U-nzqu8sGMw1YsrGYUIbuqnXT7vatbg7bf5o39ns5wQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Dam and diversion box culvert joint concrete construction temperature control method</title><source>esp@cenet</source><creator>ZHANG HULIN ; QI XIAOLIANG ; CHEN HOUCAI ; LIU XIAOQIANG ; JIE XIANGYANG ; TAN LONG ; BAI HAIRUI ; MA LIQIONG ; LI MING ; LIANG ZHANHU ; LI DONGFENG ; ZHAO YINGCHAO</creator><creatorcontrib>ZHANG HULIN ; QI XIAOLIANG ; CHEN HOUCAI ; LIU XIAOQIANG ; JIE XIANGYANG ; TAN LONG ; BAI HAIRUI ; MA LIQIONG ; LI MING ; LIANG ZHANHU ; LI DONGFENG ; ZHAO YINGCHAO</creatorcontrib><description>The invention discloses a temperature control method for concrete construction of a joint part of a dam and a diversion box culvert. The method comprises the following steps: 1, mixing auxiliary materials; 2, cooling the auxiliary material; 3, mixing the concrete; 4, cooling the initial concrete; 5, pouring concrete; and sixthly, concrete gaps are filled. By arranging the protective shed and the heat insulation layer, the situation that the auxiliary material is heated due to direct sunlight can be avoided, and meanwhile heat transfer between the ground and the auxiliary material can be avoided; the spraying head is used for directly spraying water for cooling, calcium chloride powder mixed in the auxiliary materials is combined, after the water is sprayed through the spraying head, the calcium chloride powder is melted when meeting water and absorbs heat in the auxiliary materials, and then the effect of reducing the temperature of the auxiliary materials is achieved. Initial concrete placed in the storage b</description><language>chi ; eng</language><subject>ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE ; BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FORMS ; FOUNDATIONS ; HANDLING BUILDING MATERIALS ON THE SITE ; HYDRAULIC ENGINEERING ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230307&DB=EPODOC&CC=CN&NR=115748715A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230307&DB=EPODOC&CC=CN&NR=115748715A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG HULIN</creatorcontrib><creatorcontrib>QI XIAOLIANG</creatorcontrib><creatorcontrib>CHEN HOUCAI</creatorcontrib><creatorcontrib>LIU XIAOQIANG</creatorcontrib><creatorcontrib>JIE XIANGYANG</creatorcontrib><creatorcontrib>TAN LONG</creatorcontrib><creatorcontrib>BAI HAIRUI</creatorcontrib><creatorcontrib>MA LIQIONG</creatorcontrib><creatorcontrib>LI MING</creatorcontrib><creatorcontrib>LIANG ZHANHU</creatorcontrib><creatorcontrib>LI DONGFENG</creatorcontrib><creatorcontrib>ZHAO YINGCHAO</creatorcontrib><title>Dam and diversion box culvert joint concrete construction temperature control method</title><description>The invention discloses a temperature control method for concrete construction of a joint part of a dam and a diversion box culvert. The method comprises the following steps: 1, mixing auxiliary materials; 2, cooling the auxiliary material; 3, mixing the concrete; 4, cooling the initial concrete; 5, pouring concrete; and sixthly, concrete gaps are filled. By arranging the protective shed and the heat insulation layer, the situation that the auxiliary material is heated due to direct sunlight can be avoided, and meanwhile heat transfer between the ground and the auxiliary material can be avoided; the spraying head is used for directly spraying water for cooling, calcium chloride powder mixed in the auxiliary materials is combined, after the water is sprayed through the spraying head, the calcium chloride powder is melted when meeting water and absorbs heat in the auxiliary materials, and then the effect of reducing the temperature of the auxiliary materials is achieved. Initial concrete placed in the storage b</description><subject>ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE</subject><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>FOUNDATIONS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>HYDRAULIC ENGINEERING</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNijEOwjAQBN1QIOAPxwMoLIhCiwKIiip9ZOxDOLJ91vmMeD4E8QCq2dHOXPVHE8EkB84_kYunBDd6ga3howIj-SRgKVlGwWkU4Wpl6gRjRjZS-XsIU4CI8iC3VLO7CQVXPy7U-nzqu8sGMw1YsrGYUIbuqnXT7vatbg7bf5o39ns5wQ</recordid><startdate>20230307</startdate><enddate>20230307</enddate><creator>ZHANG HULIN</creator><creator>QI XIAOLIANG</creator><creator>CHEN HOUCAI</creator><creator>LIU XIAOQIANG</creator><creator>JIE XIANGYANG</creator><creator>TAN LONG</creator><creator>BAI HAIRUI</creator><creator>MA LIQIONG</creator><creator>LI MING</creator><creator>LIANG ZHANHU</creator><creator>LI DONGFENG</creator><creator>ZHAO YINGCHAO</creator><scope>EVB</scope></search><sort><creationdate>20230307</creationdate><title>Dam and diversion box culvert joint concrete construction temperature control method</title><author>ZHANG HULIN ; QI XIAOLIANG ; CHEN HOUCAI ; LIU XIAOQIANG ; JIE XIANGYANG ; TAN LONG ; BAI HAIRUI ; MA LIQIONG ; LI MING ; LIANG ZHANHU ; LI DONGFENG ; ZHAO YINGCHAO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115748715A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE</topic><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>FOUNDATIONS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>HYDRAULIC ENGINEERING</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG HULIN</creatorcontrib><creatorcontrib>QI XIAOLIANG</creatorcontrib><creatorcontrib>CHEN HOUCAI</creatorcontrib><creatorcontrib>LIU XIAOQIANG</creatorcontrib><creatorcontrib>JIE XIANGYANG</creatorcontrib><creatorcontrib>TAN LONG</creatorcontrib><creatorcontrib>BAI HAIRUI</creatorcontrib><creatorcontrib>MA LIQIONG</creatorcontrib><creatorcontrib>LI MING</creatorcontrib><creatorcontrib>LIANG ZHANHU</creatorcontrib><creatorcontrib>LI DONGFENG</creatorcontrib><creatorcontrib>ZHAO YINGCHAO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG HULIN</au><au>QI XIAOLIANG</au><au>CHEN HOUCAI</au><au>LIU XIAOQIANG</au><au>JIE XIANGYANG</au><au>TAN LONG</au><au>BAI HAIRUI</au><au>MA LIQIONG</au><au>LI MING</au><au>LIANG ZHANHU</au><au>LI DONGFENG</au><au>ZHAO YINGCHAO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Dam and diversion box culvert joint concrete construction temperature control method</title><date>2023-03-07</date><risdate>2023</risdate><abstract>The invention discloses a temperature control method for concrete construction of a joint part of a dam and a diversion box culvert. The method comprises the following steps: 1, mixing auxiliary materials; 2, cooling the auxiliary material; 3, mixing the concrete; 4, cooling the initial concrete; 5, pouring concrete; and sixthly, concrete gaps are filled. By arranging the protective shed and the heat insulation layer, the situation that the auxiliary material is heated due to direct sunlight can be avoided, and meanwhile heat transfer between the ground and the auxiliary material can be avoided; the spraying head is used for directly spraying water for cooling, calcium chloride powder mixed in the auxiliary materials is combined, after the water is sprayed through the spraying head, the calcium chloride powder is melted when meeting water and absorbs heat in the auxiliary materials, and then the effect of reducing the temperature of the auxiliary materials is achieved. Initial concrete placed in the storage b</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN115748715A |
source | esp@cenet |
subjects | ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FORMS FOUNDATIONS HANDLING BUILDING MATERIALS ON THE SITE HYDRAULIC ENGINEERING REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SHUTTERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Dam and diversion box culvert joint concrete construction temperature control method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-28T20%3A15%3A50IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20HULIN&rft.date=2023-03-07&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115748715A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |