Dam and diversion box culvert joint concrete construction temperature control method

The invention discloses a temperature control method for concrete construction of a joint part of a dam and a diversion box culvert. The method comprises the following steps: 1, mixing auxiliary materials; 2, cooling the auxiliary material; 3, mixing the concrete; 4, cooling the initial concrete; 5,...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHANG HULIN, QI XIAOLIANG, CHEN HOUCAI, LIU XIAOQIANG, JIE XIANGYANG, TAN LONG, BAI HAIRUI, MA LIQIONG, LI MING, LIANG ZHANHU, LI DONGFENG, ZHAO YINGCHAO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHANG HULIN
QI XIAOLIANG
CHEN HOUCAI
LIU XIAOQIANG
JIE XIANGYANG
TAN LONG
BAI HAIRUI
MA LIQIONG
LI MING
LIANG ZHANHU
LI DONGFENG
ZHAO YINGCHAO
description The invention discloses a temperature control method for concrete construction of a joint part of a dam and a diversion box culvert. The method comprises the following steps: 1, mixing auxiliary materials; 2, cooling the auxiliary material; 3, mixing the concrete; 4, cooling the initial concrete; 5, pouring concrete; and sixthly, concrete gaps are filled. By arranging the protective shed and the heat insulation layer, the situation that the auxiliary material is heated due to direct sunlight can be avoided, and meanwhile heat transfer between the ground and the auxiliary material can be avoided; the spraying head is used for directly spraying water for cooling, calcium chloride powder mixed in the auxiliary materials is combined, after the water is sprayed through the spraying head, the calcium chloride powder is melted when meeting water and absorbs heat in the auxiliary materials, and then the effect of reducing the temperature of the auxiliary materials is achieved. Initial concrete placed in the storage b
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115748715A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115748715A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115748715A3</originalsourceid><addsrcrecordid>eNqNijEOwjAQBN1QIOAPxwMoLIhCiwKIiip9ZOxDOLJ91vmMeD4E8QCq2dHOXPVHE8EkB84_kYunBDd6ga3howIj-SRgKVlGwWkU4Wpl6gRjRjZS-XsIU4CI8iC3VLO7CQVXPy7U-nzqu8sGMw1YsrGYUIbuqnXT7vatbg7bf5o39ns5wQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Dam and diversion box culvert joint concrete construction temperature control method</title><source>esp@cenet</source><creator>ZHANG HULIN ; QI XIAOLIANG ; CHEN HOUCAI ; LIU XIAOQIANG ; JIE XIANGYANG ; TAN LONG ; BAI HAIRUI ; MA LIQIONG ; LI MING ; LIANG ZHANHU ; LI DONGFENG ; ZHAO YINGCHAO</creator><creatorcontrib>ZHANG HULIN ; QI XIAOLIANG ; CHEN HOUCAI ; LIU XIAOQIANG ; JIE XIANGYANG ; TAN LONG ; BAI HAIRUI ; MA LIQIONG ; LI MING ; LIANG ZHANHU ; LI DONGFENG ; ZHAO YINGCHAO</creatorcontrib><description>The invention discloses a temperature control method for concrete construction of a joint part of a dam and a diversion box culvert. The method comprises the following steps: 1, mixing auxiliary materials; 2, cooling the auxiliary material; 3, mixing the concrete; 4, cooling the initial concrete; 5, pouring concrete; and sixthly, concrete gaps are filled. By arranging the protective shed and the heat insulation layer, the situation that the auxiliary material is heated due to direct sunlight can be avoided, and meanwhile heat transfer between the ground and the auxiliary material can be avoided; the spraying head is used for directly spraying water for cooling, calcium chloride powder mixed in the auxiliary materials is combined, after the water is sprayed through the spraying head, the calcium chloride powder is melted when meeting water and absorbs heat in the auxiliary materials, and then the effect of reducing the temperature of the auxiliary materials is achieved. Initial concrete placed in the storage b</description><language>chi ; eng</language><subject>ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE ; BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FORMS ; FOUNDATIONS ; HANDLING BUILDING MATERIALS ON THE SITE ; HYDRAULIC ENGINEERING ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230307&amp;DB=EPODOC&amp;CC=CN&amp;NR=115748715A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230307&amp;DB=EPODOC&amp;CC=CN&amp;NR=115748715A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG HULIN</creatorcontrib><creatorcontrib>QI XIAOLIANG</creatorcontrib><creatorcontrib>CHEN HOUCAI</creatorcontrib><creatorcontrib>LIU XIAOQIANG</creatorcontrib><creatorcontrib>JIE XIANGYANG</creatorcontrib><creatorcontrib>TAN LONG</creatorcontrib><creatorcontrib>BAI HAIRUI</creatorcontrib><creatorcontrib>MA LIQIONG</creatorcontrib><creatorcontrib>LI MING</creatorcontrib><creatorcontrib>LIANG ZHANHU</creatorcontrib><creatorcontrib>LI DONGFENG</creatorcontrib><creatorcontrib>ZHAO YINGCHAO</creatorcontrib><title>Dam and diversion box culvert joint concrete construction temperature control method</title><description>The invention discloses a temperature control method for concrete construction of a joint part of a dam and a diversion box culvert. The method comprises the following steps: 1, mixing auxiliary materials; 2, cooling the auxiliary material; 3, mixing the concrete; 4, cooling the initial concrete; 5, pouring concrete; and sixthly, concrete gaps are filled. By arranging the protective shed and the heat insulation layer, the situation that the auxiliary material is heated due to direct sunlight can be avoided, and meanwhile heat transfer between the ground and the auxiliary material can be avoided; the spraying head is used for directly spraying water for cooling, calcium chloride powder mixed in the auxiliary materials is combined, after the water is sprayed through the spraying head, the calcium chloride powder is melted when meeting water and absorbs heat in the auxiliary materials, and then the effect of reducing the temperature of the auxiliary materials is achieved. Initial concrete placed in the storage b</description><subject>ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE</subject><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>FOUNDATIONS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>HYDRAULIC ENGINEERING</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNijEOwjAQBN1QIOAPxwMoLIhCiwKIiip9ZOxDOLJ91vmMeD4E8QCq2dHOXPVHE8EkB84_kYunBDd6ga3howIj-SRgKVlGwWkU4Wpl6gRjRjZS-XsIU4CI8iC3VLO7CQVXPy7U-nzqu8sGMw1YsrGYUIbuqnXT7vatbg7bf5o39ns5wQ</recordid><startdate>20230307</startdate><enddate>20230307</enddate><creator>ZHANG HULIN</creator><creator>QI XIAOLIANG</creator><creator>CHEN HOUCAI</creator><creator>LIU XIAOQIANG</creator><creator>JIE XIANGYANG</creator><creator>TAN LONG</creator><creator>BAI HAIRUI</creator><creator>MA LIQIONG</creator><creator>LI MING</creator><creator>LIANG ZHANHU</creator><creator>LI DONGFENG</creator><creator>ZHAO YINGCHAO</creator><scope>EVB</scope></search><sort><creationdate>20230307</creationdate><title>Dam and diversion box culvert joint concrete construction temperature control method</title><author>ZHANG HULIN ; QI XIAOLIANG ; CHEN HOUCAI ; LIU XIAOQIANG ; JIE XIANGYANG ; TAN LONG ; BAI HAIRUI ; MA LIQIONG ; LI MING ; LIANG ZHANHU ; LI DONGFENG ; ZHAO YINGCHAO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115748715A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE</topic><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>FOUNDATIONS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>HYDRAULIC ENGINEERING</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG HULIN</creatorcontrib><creatorcontrib>QI XIAOLIANG</creatorcontrib><creatorcontrib>CHEN HOUCAI</creatorcontrib><creatorcontrib>LIU XIAOQIANG</creatorcontrib><creatorcontrib>JIE XIANGYANG</creatorcontrib><creatorcontrib>TAN LONG</creatorcontrib><creatorcontrib>BAI HAIRUI</creatorcontrib><creatorcontrib>MA LIQIONG</creatorcontrib><creatorcontrib>LI MING</creatorcontrib><creatorcontrib>LIANG ZHANHU</creatorcontrib><creatorcontrib>LI DONGFENG</creatorcontrib><creatorcontrib>ZHAO YINGCHAO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG HULIN</au><au>QI XIAOLIANG</au><au>CHEN HOUCAI</au><au>LIU XIAOQIANG</au><au>JIE XIANGYANG</au><au>TAN LONG</au><au>BAI HAIRUI</au><au>MA LIQIONG</au><au>LI MING</au><au>LIANG ZHANHU</au><au>LI DONGFENG</au><au>ZHAO YINGCHAO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Dam and diversion box culvert joint concrete construction temperature control method</title><date>2023-03-07</date><risdate>2023</risdate><abstract>The invention discloses a temperature control method for concrete construction of a joint part of a dam and a diversion box culvert. The method comprises the following steps: 1, mixing auxiliary materials; 2, cooling the auxiliary material; 3, mixing the concrete; 4, cooling the initial concrete; 5, pouring concrete; and sixthly, concrete gaps are filled. By arranging the protective shed and the heat insulation layer, the situation that the auxiliary material is heated due to direct sunlight can be avoided, and meanwhile heat transfer between the ground and the auxiliary material can be avoided; the spraying head is used for directly spraying water for cooling, calcium chloride powder mixed in the auxiliary materials is combined, after the water is sprayed through the spraying head, the calcium chloride powder is melted when meeting water and absorbs heat in the auxiliary materials, and then the effect of reducing the temperature of the auxiliary materials is achieved. Initial concrete placed in the storage b</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115748715A
source esp@cenet
subjects ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE
BUILDING
BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FORMS
FOUNDATIONS
HANDLING BUILDING MATERIALS ON THE SITE
HYDRAULIC ENGINEERING
REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS
SCAFFOLDING
SHUTTERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Dam and diversion box culvert joint concrete construction temperature control method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-28T20%3A15%3A50IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20HULIN&rft.date=2023-03-07&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115748715A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true