Optimized operation method of grid-connected energy storage system based on device-level battery model
The invention relates to a device-level battery model-based grid-connected energy storage system optimization operation method. The method comprises the following steps of: establishing a device-level battery model-based grid-connected battery energy storage system power model; establishing a relati...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to a device-level battery model-based grid-connected energy storage system optimization operation method. The method comprises the following steps of: establishing a device-level battery model-based grid-connected battery energy storage system power model; establishing a relation equation of battery equivalent model parameters; designing an optimized operation method of the grid-connected battery energy storage system; designing a non-linear and non-convexity equation conversion method; performing parameter estimation; and according to a parameter estimation result, improving a mathematical model for optimized operation of the grid-connected battery energy storage system. The grid-connected battery energy storage system energy storage optimization operation method has the advantages that the battery first-order circuit equivalent model is utilized, the grid-connected battery energy storage system energy storage optimization operation method is provided, and performance optimization of th |
---|