Device and method for quickly repairing and reinforcing damaged tunnel through double-phase corrugated stainless steel

The invention relates to a double-phase corrugated stainless steel damaged tunnel rapid reinforcing device and method.The device comprises steel corbels, corrugated steel, fixing anchor bolts and filling mortar, the corrugated steel is spliced into a corrugated steel ring and connected with a ballas...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: QIAO SHUZHANG, ZHANG QINGZHAO, LIU XIAN, YANG PENG, KUANG ZENGHUA, YAN GUANCHENG, YANG YI, LYU YOUXU, ZHAO WENLIANG, SHI QILIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator QIAO SHUZHANG
ZHANG QINGZHAO
LIU XIAN
YANG PENG
KUANG ZENGHUA
YAN GUANCHENG
YANG YI
LYU YOUXU
ZHAO WENLIANG
SHI QILIN
description The invention relates to a double-phase corrugated stainless steel damaged tunnel rapid reinforcing device and method.The device comprises steel corbels, corrugated steel, fixing anchor bolts and filling mortar, the corrugated steel is spliced into a corrugated steel ring and connected with a ballast bed through the steel corbels, and gaps between the corrugated steel ring and a lining structure are densely filled with the mortar; and a common stress structure is formed with the original tunnel structure, so that the effect of permanently reinforcing the damaged tunnel is achieved. The corrugated steel is mounted in a one-way mode, and a special closing-in adjusting device is adopted for distance adjustment during final closing-in; the initial setting time of grouting mortar is 30 min, the maximum aggregate particle size is smaller than 0.2 mm, a top grouting mode is adopted, two holes are formed in the wave crest position, one hole serves as a grouting hole, the other hole serves as an exhaust hole, and grou
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115726818A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115726818A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115726818A3</originalsourceid><addsrcrecordid>eNqNyj0OwjAUA-AuDAi4w-MAHQoCuqICYmJirx6JaSLSJOSnErenIA7AZFv-psVwwKAFiK2kHkk5SXcX6Jm1eJgXBXjWQdvuCwK0HV_x2ZJ77iApZWthKKngcqdIunwzKL3iCBIuhNxxGllMrK1BjGMDzLyY3NlELH45K5an47U5l_CuRfQsYJHa5lJVm91qW1f1fv2PeQNbCkY4</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Device and method for quickly repairing and reinforcing damaged tunnel through double-phase corrugated stainless steel</title><source>esp@cenet</source><creator>QIAO SHUZHANG ; ZHANG QINGZHAO ; LIU XIAN ; YANG PENG ; KUANG ZENGHUA ; YAN GUANCHENG ; YANG YI ; LYU YOUXU ; ZHAO WENLIANG ; SHI QILIN</creator><creatorcontrib>QIAO SHUZHANG ; ZHANG QINGZHAO ; LIU XIAN ; YANG PENG ; KUANG ZENGHUA ; YAN GUANCHENG ; YANG YI ; LYU YOUXU ; ZHAO WENLIANG ; SHI QILIN</creatorcontrib><description>The invention relates to a double-phase corrugated stainless steel damaged tunnel rapid reinforcing device and method.The device comprises steel corbels, corrugated steel, fixing anchor bolts and filling mortar, the corrugated steel is spliced into a corrugated steel ring and connected with a ballast bed through the steel corbels, and gaps between the corrugated steel ring and a lining structure are densely filled with the mortar; and a common stress structure is formed with the original tunnel structure, so that the effect of permanently reinforcing the damaged tunnel is achieved. The corrugated steel is mounted in a one-way mode, and a special closing-in adjusting device is adopted for distance adjustment during final closing-in; the initial setting time of grouting mortar is 30 min, the maximum aggregate particle size is smaller than 0.2 mm, a top grouting mode is adopted, two holes are formed in the wave crest position, one hole serves as a grouting hole, the other hole serves as an exhaust hole, and grou</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230303&amp;DB=EPODOC&amp;CC=CN&amp;NR=115726818A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230303&amp;DB=EPODOC&amp;CC=CN&amp;NR=115726818A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>QIAO SHUZHANG</creatorcontrib><creatorcontrib>ZHANG QINGZHAO</creatorcontrib><creatorcontrib>LIU XIAN</creatorcontrib><creatorcontrib>YANG PENG</creatorcontrib><creatorcontrib>KUANG ZENGHUA</creatorcontrib><creatorcontrib>YAN GUANCHENG</creatorcontrib><creatorcontrib>YANG YI</creatorcontrib><creatorcontrib>LYU YOUXU</creatorcontrib><creatorcontrib>ZHAO WENLIANG</creatorcontrib><creatorcontrib>SHI QILIN</creatorcontrib><title>Device and method for quickly repairing and reinforcing damaged tunnel through double-phase corrugated stainless steel</title><description>The invention relates to a double-phase corrugated stainless steel damaged tunnel rapid reinforcing device and method.The device comprises steel corbels, corrugated steel, fixing anchor bolts and filling mortar, the corrugated steel is spliced into a corrugated steel ring and connected with a ballast bed through the steel corbels, and gaps between the corrugated steel ring and a lining structure are densely filled with the mortar; and a common stress structure is formed with the original tunnel structure, so that the effect of permanently reinforcing the damaged tunnel is achieved. The corrugated steel is mounted in a one-way mode, and a special closing-in adjusting device is adopted for distance adjustment during final closing-in; the initial setting time of grouting mortar is 30 min, the maximum aggregate particle size is smaller than 0.2 mm, a top grouting mode is adopted, two holes are formed in the wave crest position, one hole serves as a grouting hole, the other hole serves as an exhaust hole, and grou</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyj0OwjAUA-AuDAi4w-MAHQoCuqICYmJirx6JaSLSJOSnErenIA7AZFv-psVwwKAFiK2kHkk5SXcX6Jm1eJgXBXjWQdvuCwK0HV_x2ZJ77iApZWthKKngcqdIunwzKL3iCBIuhNxxGllMrK1BjGMDzLyY3NlELH45K5an47U5l_CuRfQsYJHa5lJVm91qW1f1fv2PeQNbCkY4</recordid><startdate>20230303</startdate><enddate>20230303</enddate><creator>QIAO SHUZHANG</creator><creator>ZHANG QINGZHAO</creator><creator>LIU XIAN</creator><creator>YANG PENG</creator><creator>KUANG ZENGHUA</creator><creator>YAN GUANCHENG</creator><creator>YANG YI</creator><creator>LYU YOUXU</creator><creator>ZHAO WENLIANG</creator><creator>SHI QILIN</creator><scope>EVB</scope></search><sort><creationdate>20230303</creationdate><title>Device and method for quickly repairing and reinforcing damaged tunnel through double-phase corrugated stainless steel</title><author>QIAO SHUZHANG ; ZHANG QINGZHAO ; LIU XIAN ; YANG PENG ; KUANG ZENGHUA ; YAN GUANCHENG ; YANG YI ; LYU YOUXU ; ZHAO WENLIANG ; SHI QILIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115726818A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>QIAO SHUZHANG</creatorcontrib><creatorcontrib>ZHANG QINGZHAO</creatorcontrib><creatorcontrib>LIU XIAN</creatorcontrib><creatorcontrib>YANG PENG</creatorcontrib><creatorcontrib>KUANG ZENGHUA</creatorcontrib><creatorcontrib>YAN GUANCHENG</creatorcontrib><creatorcontrib>YANG YI</creatorcontrib><creatorcontrib>LYU YOUXU</creatorcontrib><creatorcontrib>ZHAO WENLIANG</creatorcontrib><creatorcontrib>SHI QILIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>QIAO SHUZHANG</au><au>ZHANG QINGZHAO</au><au>LIU XIAN</au><au>YANG PENG</au><au>KUANG ZENGHUA</au><au>YAN GUANCHENG</au><au>YANG YI</au><au>LYU YOUXU</au><au>ZHAO WENLIANG</au><au>SHI QILIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Device and method for quickly repairing and reinforcing damaged tunnel through double-phase corrugated stainless steel</title><date>2023-03-03</date><risdate>2023</risdate><abstract>The invention relates to a double-phase corrugated stainless steel damaged tunnel rapid reinforcing device and method.The device comprises steel corbels, corrugated steel, fixing anchor bolts and filling mortar, the corrugated steel is spliced into a corrugated steel ring and connected with a ballast bed through the steel corbels, and gaps between the corrugated steel ring and a lining structure are densely filled with the mortar; and a common stress structure is formed with the original tunnel structure, so that the effect of permanently reinforcing the damaged tunnel is achieved. The corrugated steel is mounted in a one-way mode, and a special closing-in adjusting device is adopted for distance adjustment during final closing-in; the initial setting time of grouting mortar is 30 min, the maximum aggregate particle size is smaller than 0.2 mm, a top grouting mode is adopted, two holes are formed in the wave crest position, one hole serves as a grouting hole, the other hole serves as an exhaust hole, and grou</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115726818A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
TUNNELS
title Device and method for quickly repairing and reinforcing damaged tunnel through double-phase corrugated stainless steel
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-04T03%3A33%3A57IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=QIAO%20SHUZHANG&rft.date=2023-03-03&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115726818A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true