Anti-freezing and anti-thaw collapse pile foundation structure in permafrost region and construction method of anti-freezing and anti-thaw collapse pile foundation structure
The invention relates to an anti-freezing and anti-thaw collapse pile foundation structure in a permafrost region. The pile foundation structure comprises a pile penetrating through a permafrost active layer, a limiting pile casing, a limiting pile casing inner wall, an upper tray, a lower tray and...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | YU QIANGSHAN JU XIN |
description | The invention relates to an anti-freezing and anti-thaw collapse pile foundation structure in a permafrost region. The pile foundation structure comprises a pile penetrating through a permafrost active layer, a limiting pile casing, a limiting pile casing inner wall, an upper tray, a lower tray and a plurality of tray supports, wherein the limiting pile casing inner wall, the upper tray, the lower tray and the tray supports are arranged in the limiting pile casing and connected together. A steel pipe protection wall is arranged in the inner wall of the limiting protection cylinder; a tension-compression spring is arranged between the upper tray and the lower tray; the tail end of the pile is embedded into the steel pipe retaining wall; a plurality of steering inclined struts are arranged on the lower portion of the inner wall of the limiting protection cylinder and connected with the lower end of the tray support. The upper end of each tray bracket penetrates through the lower tray and the upper tray; a limit |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115652978A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115652978A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115652978A3</originalsourceid><addsrcrecordid>eNqdjc0KwjAQhHvxIOo7rA_QQ5X6cyxF8eTJewnppg2kuyHZIPhOvqMt9QHEwzAwM3yzzN4Vic1NQHxZ6kBRO2pMpFdP0Oyc8hHBW4dgOFGrxDJBlJC0pIBgCTyGQZnAUSBgN9UTRTPNqykYUHpugc0M__tunS2MchE3X19l2-vlUd9y9Nxg9EojoTT1vSjKQ7k7H0_V_pfNB-fXW44</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Anti-freezing and anti-thaw collapse pile foundation structure in permafrost region and construction method of anti-freezing and anti-thaw collapse pile foundation structure</title><source>esp@cenet</source><creator>YU QIANGSHAN ; JU XIN</creator><creatorcontrib>YU QIANGSHAN ; JU XIN</creatorcontrib><description>The invention relates to an anti-freezing and anti-thaw collapse pile foundation structure in a permafrost region. The pile foundation structure comprises a pile penetrating through a permafrost active layer, a limiting pile casing, a limiting pile casing inner wall, an upper tray, a lower tray and a plurality of tray supports, wherein the limiting pile casing inner wall, the upper tray, the lower tray and the tray supports are arranged in the limiting pile casing and connected together. A steel pipe protection wall is arranged in the inner wall of the limiting protection cylinder; a tension-compression spring is arranged between the upper tray and the lower tray; the tail end of the pile is embedded into the steel pipe retaining wall; a plurality of steering inclined struts are arranged on the lower portion of the inner wall of the limiting protection cylinder and connected with the lower end of the tray support. The upper end of each tray bracket penetrates through the lower tray and the upper tray; a limit</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230131&DB=EPODOC&CC=CN&NR=115652978A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230131&DB=EPODOC&CC=CN&NR=115652978A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YU QIANGSHAN</creatorcontrib><creatorcontrib>JU XIN</creatorcontrib><title>Anti-freezing and anti-thaw collapse pile foundation structure in permafrost region and construction method of anti-freezing and anti-thaw collapse pile foundation structure</title><description>The invention relates to an anti-freezing and anti-thaw collapse pile foundation structure in a permafrost region. The pile foundation structure comprises a pile penetrating through a permafrost active layer, a limiting pile casing, a limiting pile casing inner wall, an upper tray, a lower tray and a plurality of tray supports, wherein the limiting pile casing inner wall, the upper tray, the lower tray and the tray supports are arranged in the limiting pile casing and connected together. A steel pipe protection wall is arranged in the inner wall of the limiting protection cylinder; a tension-compression spring is arranged between the upper tray and the lower tray; the tail end of the pile is embedded into the steel pipe retaining wall; a plurality of steering inclined struts are arranged on the lower portion of the inner wall of the limiting protection cylinder and connected with the lower end of the tray support. The upper end of each tray bracket penetrates through the lower tray and the upper tray; a limit</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqdjc0KwjAQhHvxIOo7rA_QQ5X6cyxF8eTJewnppg2kuyHZIPhOvqMt9QHEwzAwM3yzzN4Vic1NQHxZ6kBRO2pMpFdP0Oyc8hHBW4dgOFGrxDJBlJC0pIBgCTyGQZnAUSBgN9UTRTPNqykYUHpugc0M__tunS2MchE3X19l2-vlUd9y9Nxg9EojoTT1vSjKQ7k7H0_V_pfNB-fXW44</recordid><startdate>20230131</startdate><enddate>20230131</enddate><creator>YU QIANGSHAN</creator><creator>JU XIN</creator><scope>EVB</scope></search><sort><creationdate>20230131</creationdate><title>Anti-freezing and anti-thaw collapse pile foundation structure in permafrost region and construction method of anti-freezing and anti-thaw collapse pile foundation structure</title><author>YU QIANGSHAN ; JU XIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115652978A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>YU QIANGSHAN</creatorcontrib><creatorcontrib>JU XIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YU QIANGSHAN</au><au>JU XIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Anti-freezing and anti-thaw collapse pile foundation structure in permafrost region and construction method of anti-freezing and anti-thaw collapse pile foundation structure</title><date>2023-01-31</date><risdate>2023</risdate><abstract>The invention relates to an anti-freezing and anti-thaw collapse pile foundation structure in a permafrost region. The pile foundation structure comprises a pile penetrating through a permafrost active layer, a limiting pile casing, a limiting pile casing inner wall, an upper tray, a lower tray and a plurality of tray supports, wherein the limiting pile casing inner wall, the upper tray, the lower tray and the tray supports are arranged in the limiting pile casing and connected together. A steel pipe protection wall is arranged in the inner wall of the limiting protection cylinder; a tension-compression spring is arranged between the upper tray and the lower tray; the tail end of the pile is embedded into the steel pipe retaining wall; a plurality of steering inclined struts are arranged on the lower portion of the inner wall of the limiting protection cylinder and connected with the lower end of the tray support. The upper end of each tray bracket penetrates through the lower tray and the upper tray; a limit</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN115652978A |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Anti-freezing and anti-thaw collapse pile foundation structure in permafrost region and construction method of anti-freezing and anti-thaw collapse pile foundation structure |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-01T12%3A44%3A26IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YU%20QIANGSHAN&rft.date=2023-01-31&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115652978A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |