Anti-falling construction method for adjustable head

The invention relates to an anti-falling construction method for a movable head, which comprises the following steps of: before pouring a concrete top beam, pre-burying an embedded plate on which a steel square tube is welded to a corresponding position of the top beam; the steel square strips on th...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YOU JUNQIANG, LYU JIALIN, CHEN LIANG, GUO ZHENXIONG, WANG YINGGE, WEI WEI, WU LEWEN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator YOU JUNQIANG
LYU JIALIN
CHEN LIANG
GUO ZHENXIONG
WANG YINGGE
WEI WEI
WU LEWEN
description The invention relates to an anti-falling construction method for a movable head, which comprises the following steps of: before pouring a concrete top beam, pre-burying an embedded plate on which a steel square tube is welded to a corresponding position of the top beam; the steel square strips on the supporting units are inserted into the steel square pipes; mounting a middle section steel pipe support; after effective support replacement construction of the foundation pit is completed and the design requirement is met, the steel supports are dismantled; compared with an existing adjustable head end anti-falling measure, constraint and anti-falling of the end of the steel support are met, welding damage to the end of the adjustable head is reduced, and the steel support can be conveniently dismantled in the later period; and meanwhile, the steel square strip can be repeatedly used. 本发明涉及一种活络头的防坠落施工方法,包括以下步骤:在混凝土冠梁浇筑前,将焊接有钢方管的埋板预埋至冠梁处对应位置;将支撑单元上的钢方条插设于钢方管内;安装中间节段钢管支撑;待基坑有效换撑施工完成并达到设计要求后,拆除钢支撑;与现有活络头端防坠落措施相比,满足
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115652944A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115652944A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115652944A3</originalsourceid><addsrcrecordid>eNrjZDBxzCvJ1E1LzMnJzEtXSM7PKy4pKk0uyczPU8hNLcnIT1FIyy9SSEzJKi0uSUzKSVXISE1M4WFgBeooTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhqZmpkaWJiaOxsSoAQBJfCz_</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Anti-falling construction method for adjustable head</title><source>esp@cenet</source><creator>YOU JUNQIANG ; LYU JIALIN ; CHEN LIANG ; GUO ZHENXIONG ; WANG YINGGE ; WEI WEI ; WU LEWEN</creator><creatorcontrib>YOU JUNQIANG ; LYU JIALIN ; CHEN LIANG ; GUO ZHENXIONG ; WANG YINGGE ; WEI WEI ; WU LEWEN</creatorcontrib><description>The invention relates to an anti-falling construction method for a movable head, which comprises the following steps of: before pouring a concrete top beam, pre-burying an embedded plate on which a steel square tube is welded to a corresponding position of the top beam; the steel square strips on the supporting units are inserted into the steel square pipes; mounting a middle section steel pipe support; after effective support replacement construction of the foundation pit is completed and the design requirement is met, the steel supports are dismantled; compared with an existing adjustable head end anti-falling measure, constraint and anti-falling of the end of the steel support are met, welding damage to the end of the adjustable head is reduced, and the steel support can be conveniently dismantled in the later period; and meanwhile, the steel square strip can be repeatedly used. 本发明涉及一种活络头的防坠落施工方法,包括以下步骤:在混凝土冠梁浇筑前,将焊接有钢方管的埋板预埋至冠梁处对应位置;将支撑单元上的钢方条插设于钢方管内;安装中间节段钢管支撑;待基坑有效换撑施工完成并达到设计要求后,拆除钢支撑;与现有活络头端防坠落措施相比,满足</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230131&amp;DB=EPODOC&amp;CC=CN&amp;NR=115652944A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230131&amp;DB=EPODOC&amp;CC=CN&amp;NR=115652944A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YOU JUNQIANG</creatorcontrib><creatorcontrib>LYU JIALIN</creatorcontrib><creatorcontrib>CHEN LIANG</creatorcontrib><creatorcontrib>GUO ZHENXIONG</creatorcontrib><creatorcontrib>WANG YINGGE</creatorcontrib><creatorcontrib>WEI WEI</creatorcontrib><creatorcontrib>WU LEWEN</creatorcontrib><title>Anti-falling construction method for adjustable head</title><description>The invention relates to an anti-falling construction method for a movable head, which comprises the following steps of: before pouring a concrete top beam, pre-burying an embedded plate on which a steel square tube is welded to a corresponding position of the top beam; the steel square strips on the supporting units are inserted into the steel square pipes; mounting a middle section steel pipe support; after effective support replacement construction of the foundation pit is completed and the design requirement is met, the steel supports are dismantled; compared with an existing adjustable head end anti-falling measure, constraint and anti-falling of the end of the steel support are met, welding damage to the end of the adjustable head is reduced, and the steel support can be conveniently dismantled in the later period; and meanwhile, the steel square strip can be repeatedly used. 本发明涉及一种活络头的防坠落施工方法,包括以下步骤:在混凝土冠梁浇筑前,将焊接有钢方管的埋板预埋至冠梁处对应位置;将支撑单元上的钢方条插设于钢方管内;安装中间节段钢管支撑;待基坑有效换撑施工完成并达到设计要求后,拆除钢支撑;与现有活络头端防坠落措施相比,满足</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDBxzCvJ1E1LzMnJzEtXSM7PKy4pKk0uyczPU8hNLcnIT1FIyy9SSEzJKi0uSUzKSVXISE1M4WFgBeooTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GhqZmpkaWJiaOxsSoAQBJfCz_</recordid><startdate>20230131</startdate><enddate>20230131</enddate><creator>YOU JUNQIANG</creator><creator>LYU JIALIN</creator><creator>CHEN LIANG</creator><creator>GUO ZHENXIONG</creator><creator>WANG YINGGE</creator><creator>WEI WEI</creator><creator>WU LEWEN</creator><scope>EVB</scope></search><sort><creationdate>20230131</creationdate><title>Anti-falling construction method for adjustable head</title><author>YOU JUNQIANG ; LYU JIALIN ; CHEN LIANG ; GUO ZHENXIONG ; WANG YINGGE ; WEI WEI ; WU LEWEN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115652944A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>YOU JUNQIANG</creatorcontrib><creatorcontrib>LYU JIALIN</creatorcontrib><creatorcontrib>CHEN LIANG</creatorcontrib><creatorcontrib>GUO ZHENXIONG</creatorcontrib><creatorcontrib>WANG YINGGE</creatorcontrib><creatorcontrib>WEI WEI</creatorcontrib><creatorcontrib>WU LEWEN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YOU JUNQIANG</au><au>LYU JIALIN</au><au>CHEN LIANG</au><au>GUO ZHENXIONG</au><au>WANG YINGGE</au><au>WEI WEI</au><au>WU LEWEN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Anti-falling construction method for adjustable head</title><date>2023-01-31</date><risdate>2023</risdate><abstract>The invention relates to an anti-falling construction method for a movable head, which comprises the following steps of: before pouring a concrete top beam, pre-burying an embedded plate on which a steel square tube is welded to a corresponding position of the top beam; the steel square strips on the supporting units are inserted into the steel square pipes; mounting a middle section steel pipe support; after effective support replacement construction of the foundation pit is completed and the design requirement is met, the steel supports are dismantled; compared with an existing adjustable head end anti-falling measure, constraint and anti-falling of the end of the steel support are met, welding damage to the end of the adjustable head is reduced, and the steel support can be conveniently dismantled in the later period; and meanwhile, the steel square strip can be repeatedly used. 本发明涉及一种活络头的防坠落施工方法,包括以下步骤:在混凝土冠梁浇筑前,将焊接有钢方管的埋板预埋至冠梁处对应位置;将支撑单元上的钢方条插设于钢方管内;安装中间节段钢管支撑;待基坑有效换撑施工完成并达到设计要求后,拆除钢支撑;与现有活络头端防坠落措施相比,满足</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115652944A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Anti-falling construction method for adjustable head
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-19T17%3A38%3A56IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YOU%20JUNQIANG&rft.date=2023-01-31&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115652944A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true